Technical requirements

1, junction boxes, control box, the


electrical box (cabinet) provisions must
be placed in the location, activities Lighthouse
, buttons work-Locking reliable,
moving at no more than transportation
requirements.
2, Solid Control System wall map in
cable trough in the fixed location,
lighting, power, the Line of Control by
the junction boxes, control back into
the box, the wall cable trough, from the
tank pipe.
3, Derrick with the installation of
various types of fixed must be
galvanized fasteners, external spring
washers, and the only retreat openings
pin lead wire to ensure that drilling
safety, relocation a well each of the
various components should check whether
solid reliable, and paint anticorrosion.