electrical box (cabinet) provisions must be placed in the location, activities Lighthouse , buttons work-Locking reliable, moving at no more than transportation requirements. 2, Solid Control System wall map in cable trough in the fixed location, lighting, power, the Line of Control by the junction boxes, control back into the box, the wall cable trough, from the tank pipe. 3, Derrick with the installation of various types of fixed must be galvanized fasteners, external spring washers, and the only retreat openings pin lead wire to ensure that drilling safety, relocation a well each of the various components should check whether solid reliable, and paint anticorrosion.