STATEMENT OF DEFICIENCY
During routine site surveillance on Dated 24 Aug, 2021, It has been found that the construction team
installed the street lighting system 12M Lighting pole foundations at Modon Road without material
Receiving. Which is clear violation as per approved ITP No. SEPR-ITP-Q-03 Rev 0 Item No. 2.1. Construction
team is advised to provide the root cause and acceptable corrective action along preventive action within the
ACD.
ROOTCAUSE OF NON-CONFORMANCE
- Due to unavailability of compressive strength report of Lighting pole foundations.
-Construction team failed to provide the required documents for material Receiving.
CORRECTIVE ACTION
PREVENTIVE ACTION
INITIATOR DEFICIENT
Name &Signature of Deficient
QCI Name: __Imran Mehdi__
OPEN Date of Discrepancy :
Signature:_______________
DEFICIENT LOCATION AND TARGET DATE TO CLOSE NCR : MODON ROAD (23-NOV-2021)
VERIFICATION OF COMPLETION:
CLOSED Date of Completion : QC Signature:
QC Supervisor: Deficient Location Manager/Supervisor:
Name: Name: (Crew
Signature)
If included
Signature: Signature:
Date: Date:
QC Manager:
Name: Mr.Shabbar Signature:
Date:
ACTUAL IMPROVEMENT DONE
*TRAINING PROVIDED *RESOURCES IMPROVED
*PROCEDURE IMPROVED / NEW PROCEDURE ADOPTED
Noted to Saudi Aramco Concurrence
(SAPMT Acknowledgement
Signature_______________________)
(SAPID
Date of NCR raised by CCCC QC to Subcontractor / Construction Personnel Signature________________________)