LEGEND
WP WASTE PIPE
SP SOIL PIPE
VP VENT PIPE
RWP RAIN WATER PIPE
1 2 3 4 5 6 7 8 CND CONDENSATE PIPE
ABBREVIATIONS
FD FLOOR DRAIN
CO CEILING CLEAN OUT
FCO FLOOR CLEAN OUT
WCO WALL CLEAN OUT
F MH MANHOLE
GT GULLY TRAP
RD ROOF DRAIN
AD AREA DRAIN
26 WC
Distribution
30.90 m² Φ75 VP
Φ50 VP
Φ110 RWP
02 25/11/2021 Revised as per Comments
B
30
Toilet LAV 01 04/11/2021 Revised as per Comments
4.25 m² Φ50 VP
29
Φ50 VP 0 02/06/2021 First Issue
Distribution 27
3.05 m² Φ50 VP Employees Lounge & Pantry
Φ50 AFC 18.10 m² Client:
WC UT ø50 VP AT CEILING LEVEL BELOW
Φ110 SP
Φ50 VP
FD MINISTRY OF DEFENSE
T/B Φ50 VP Φ50 VP
F/B
Φ50 WP 46 ROYAL SAUDI AIR FORCES
28 UT Workstation 3 person
Classroom 20.45 m² 45
Φ50 VP 19.45 m² L.B.D. Manager's Assistant Office Supervision:
ø50 VP AT CEILING Φ50 Φ50 VP 22.65 m²
LEVEL BELOW
Φ75 WP
AFC ENGINEERING AND WORKS
AFC
FD DEPARTMENT
LAV
Φ50 VP FD Φ50 VP ENGINEERING AFFAIRS
Φ50 VP 2 F/B
AFC Φ75 WP Φ75
AFC
Φ75 VP
T/A 1 DEPARTMENT OF PROJECTS
Φ75 VP
FD SLOPE: 1% WC
Φ50 VP F/B
LAV Φ110 SP Consultant:
FD
31 WC Φ50 VP
Public Toilets F/B T/A
12.75 m² DAR AL-HANDASAH
Φ110 RWP Φ110 RWP
T/B
A
Contractor:
Contractor's Consultant:
ONEWORKS s.p.a.
Via Amatore Sciesa 3, 20135 MILANO
T. +39 02 655913 1 F. +39 02 655913 60
e-mail: milano@one-works.com
SETS
Hamra Square, 2034 4605 BEIRUT
T. +961 1 755 411 F. +961 1 755 422
e-mail: info@setsintl.net
Facility Name:
Air Force Command HQ - TA-5-01 - Movement and Follow-up Building
Drawing Title:
Air Force Command HQ - TA-5-01 - Movement and Follow-up Building
First Level, Drainage Layout
- ﻣﺑﻧﻰ ﺍﻟﺣﺭﻛﺔ ﻭﺍﻟﻣﺗﺎﺑﻌﺔ- TA-5-01 - ﻗﻳﺎﺩﺓ ﺍﻟﺷﺭﻁﺔ ﺍﻟﺟﻭﻳﺔ- -
ﻣﺧﻁﻁ ﻧﻅﺎﻡ ﺍﻟﺻﺭﻑ ﺍﻟﺻﺣﻲ- ﺍﻟﻁﺎﺑﻖ ﺍﻷﻭﻝ
Scale Sheet
1/50 1/1
Drawn by: Checked by: Approved by: Certified by: Date:
EA MA AD AY 03/09/2021
Sheet No. Revision
S19091-DIB-BSSJV-PK2-MFB-FD-M-MDR-02-F1-00-0202 02