S19091 Dib BSSJV PK2 MFB FD M MDR 02 F1 00 0202 02 B

You might also like

You are on page 1of 1

NOTE:

LEGEND
WP WASTE PIPE
SP SOIL PIPE
VP VENT PIPE
RWP RAIN WATER PIPE
1 2 3 4 5 6 7 8 CND CONDENSATE PIPE

ABBREVIATIONS
FD FLOOR DRAIN
CO CEILING CLEAN OUT
FCO FLOOR CLEAN OUT
WCO WALL CLEAN OUT
F MH MANHOLE
GT GULLY TRAP
RD ROOF DRAIN
AD AREA DRAIN

Φ110 RWP WC WATER CLOSET


E 40
Φ75 WP LAV LAVATORY
Stairs
Φ110 RWP T/B 42
12.95 m²
Toilet HB HOSE BIB
35 Φ75 WP Φ50 VP 6.20 m²
Electrical Room AFC F/B Φ50 JNT JANITORIAL UNIT
5.00 m² SLOPE: 1% AFC 3
4
Φ110 SP
AFC BT BATHTUB
Φ75 WP Φ110 SP
AFC AFC SH SHOWER
D SLOPE: 1%
Φ110 RWP KS KITCHEN SINK
34
Supervisor Office IC INSPECTION CHAMBER
9.35 m² Φ75 VP
Φ50 VP U/T UNDER TILE
41 T/A
39
L.B.D. Manager's Office Φ110 SP U/G UNDER GROUND
Stairs 23.35 m²
36 38 15.30 m² T/B
Comm. Room Distribution AFC ABOVE FALSE CEILING
9.45 m² 7.75 m²
37 T/B TO BELOW
Novec
0.40 m² F/A FROM ABOVE
44
33 Meeting Room
32 Workstation 2 person 20.35 m²
Workstation 4 person 10.60 m²
F/A KEY PLAN:
20.70 m² 43
Secretarial Office
11.50 m²

26 WC
Distribution
30.90 m² Φ75 VP
Φ50 VP
Φ110 RWP
02 25/11/2021 Revised as per Comments
B
30
Toilet LAV 01 04/11/2021 Revised as per Comments
4.25 m² Φ50 VP

29
Φ50 VP 0 02/06/2021 First Issue
Distribution 27
3.05 m² Φ50 VP Employees Lounge & Pantry
Φ50 AFC 18.10 m² Client:
WC UT ø50 VP AT CEILING LEVEL BELOW
Φ110 SP
Φ50 VP
FD MINISTRY OF DEFENSE
T/B Φ50 VP Φ50 VP
F/B
Φ50 WP 46 ROYAL SAUDI AIR FORCES
28 UT Workstation 3 person
Classroom 20.45 m² 45
Φ50 VP 19.45 m² L.B.D. Manager's Assistant Office Supervision:
ø50 VP AT CEILING Φ50 Φ50 VP 22.65 m²
LEVEL BELOW
Φ75 WP
AFC ENGINEERING AND WORKS
AFC
FD DEPARTMENT
LAV
Φ50 VP FD Φ50 VP ENGINEERING AFFAIRS
Φ50 VP 2 F/B
AFC Φ75 WP Φ75
AFC
Φ75 VP
T/A 1 DEPARTMENT OF PROJECTS
Φ75 VP
FD SLOPE: 1% WC
Φ50 VP F/B
LAV Φ110 SP Consultant:
FD
31 WC Φ50 VP
Public Toilets F/B T/A
12.75 m² DAR AL-HANDASAH
Φ110 RWP Φ110 RWP
T/B
A

Contractor:

Contractor's Consultant:
ONEWORKS s.p.a.
Via Amatore Sciesa 3, 20135 MILANO
T. +39 02 655913 1 F. +39 02 655913 60
e-mail: milano@one-works.com

SETS
Hamra Square, 2034 4605 BEIRUT
T. +961 1 755 411 F. +961 1 755 422
e-mail: info@setsintl.net

Facility Name:
Air Force Command HQ - TA-5-01 - Movement and Follow-up Building

- ‫ ﻣﺑﻧﻰ ﺍﻟﺣﺭﻛﺔ ﻭﺍﻟﻣﺗﺎﺑﻌﺔ‬- TA-5-01 - ‫ﻗﻳﺎﺩﺓ ﺍﻟﺷﺭﻁﺔ ﺍﻟﺟﻭﻳﺔ‬- -

Drawing Title:
Air Force Command HQ - TA-5-01 - Movement and Follow-up Building
First Level, Drainage Layout
- ‫ ﻣﺑﻧﻰ ﺍﻟﺣﺭﻛﺔ ﻭﺍﻟﻣﺗﺎﺑﻌﺔ‬- TA-5-01 - ‫ﻗﻳﺎﺩﺓ ﺍﻟﺷﺭﻁﺔ ﺍﻟﺟﻭﻳﺔ‬- -
‫ ﻣﺧﻁﻁ ﻧﻅﺎﻡ ﺍﻟﺻﺭﻑ ﺍﻟﺻﺣﻲ‬- ‫ﺍﻟﻁﺎﺑﻖ ﺍﻷﻭﻝ‬

Scale Sheet
1/50 1/1
Drawn by: Checked by: Approved by: Certified by: Date:
EA MA AD AY 03/09/2021
Sheet No. Revision
S19091-DIB-BSSJV-PK2-MFB-FD-M-MDR-02-F1-00-0202 02

You might also like