SHEET No.

: I

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

INITIAL
APPROVED IN PRINCIPLE MOD .
EQUIVALENT CHART & DATE

OF
FOUNDATIONS

(VOLUME CHART) DY.CEE/CON/SECR/NGP

PROJECT :-
ELECTRIFICATION OF 3rd LINE
BETWEEN
THARSA(excl) - KALUMNA(incl)
SECTION FOR GUPTA POWER

SOUTH EAST CENTRAL RAILWAY

05-07-21 TNH THENIS

IR
05-07-21 BHN BHANU

05-07-21 BMH BHOOMESH


SHEET No.: II

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

SL.
TYPE PAGE
DESCRIPTION OF
No. No.
FDN.
1. EQUIVALENT CHART FOR B, HB, BG & WBC FOUNDATIONS. CHART 01
2. SIDE BEARING FOUNDATIONS ON NORMAL SOIL (SOIL PRESSURE IN 11,000 Kgf/m²) B 02
3. SIDE BEARING FOUNDATION ON HARD SOIL (SOIL PRESSURE IN 21,500 Kgf/m²). HB 03
4. SIDE GRAVITY FOUNDATIONS (SOIL PRESSURE IN 8,000 Kgf/m² & 11,000 Kgf/m²). BG 04
5. FOUNDATION ON WET BLACK COTTON SOIL (SOIL PRESSURE IN 8,000 Kg/m²). WBC 05
6. EQUIVALENT CHART FOR NG FOUNDATIONS. CHART 06
7. VOLUME CHART & EQUIVALENT CHART OF FOUNDATION N.G-TYPE. NG 07

8. EQUIVALENT CHART OF NBC FOUNDATIONS. CHART 08

09. NBC TYPE OF FOUNDATION FOR DRY BLACK COTTON SOIL 09


NBC(3.00m)
(SOIL PRESSURE IN 16,500 & 11,000 Kgf/m²) 3.00m DEPTH
NBC TYPE OF FOUNDATION FOR DRY BLACK COTTON SOIL NBC(2.50m) 10
10. (SOIL PRESSURE IN 8,000 Kgf/m²) 2.50m DEPTH
11. PURE GRAVITY FOUNDATIONS FOR PORTAL STRUCTURE (SOIL PRESSURE 8,250 Kgf/m²). P 11

12. PURE GRAVITY FOUNDATIONS FOR PORTAL STRUCTURE (SOIL PRESSURE 11,000 Kgf/m²). P 12
13. PORTAL FOUNDATIONS IN DRY BLACK COTTON SOIL (SOIL PRESSURE 16,500 Kgf/m²). PBC 13,14
14. SOFT ROCK FOUNDATION (SOIL PRESSURE 45,000 Kg/m²). SRB 15,16
15. HARD ROCK FOUNDATION ON PORTALS (SOIL PRESSURE 90,000 Kgf/m²). HRB 17

16. HARD ROCK FOUNDATION (SOIL PRESSURE 90,000 Kgf/m²). HBR 18

17. ANCHOR BLOCK FOUNDATION (NORMAL SOIL). ANCHOR 19


18. CHART FOR ANCHOR SETTING DISTANCE. SD 20

19. ANCHOR FOUNDATION ON B.C. SOIL & WET & DRY .B.C. SOIL. BCA/BCRDF 21

20. DWARF MAST ANCHOR FOUNDATION FOR LOOSE SOIL (SOIL PRESSURE 5,500 Kgf/m²). DF 22

21. DOUBLE GUY ROD ANCHOR BLOCK ARRANGEMENT SD 23

22. DETAIL OF MUFF FOR STRUCTURES WITHOUT B.W ANCHOR. MAST & 24
23. DETAIL OF MUFF FOR STRUCTURES WITH B.W ANCHOR. PORTAL 25
24. DRY BLACK COTTON SOIL A.T. FOUNDATION (SOIL PRESSURE IN 16,500 Kgf/m²). AT/B.C 26

25. NORMAL, LOOSE SOIL & HARD SOIL A.T. FOUNDATION 27


AT
(SOIL PRESSURE IN 8,000 , 11,000) ,(5,500), (21,500) Kgf/m²).
26. SCROLL BOX FOR FOUNDATION. 28
27. VOLUME OF CORE HOLE ON MAST & TTU. MAST&TTU 29
28. VOLUME OF CORE HOLE PORTAL. PORTAL 30
29. STANDARD SETTING OF STRUCTURES IN THE VICINITY OF SIGNALS (BOARD GUAGE). CHART 31,32

30. TRACK CENTERS AT TURNOUTS ( BROAD GAUGE ) CHART 33


34
31. EXTRA ALLOWANCE FOR SETTING OF STRUCTURE ON CURVES. CHART
32. CLEAR SPAN FOR N, O, R & BFB TYPE PORTALS) CHART 35-38

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: III

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

NOTES:-
1. THE FOUNDATION CONCRETE SHOULD BE OF GRADE M - 15 WITH CONCRETE FOR CORE
IN M - 20 WHERE CONCRETE IS IN CONTACT OR BURIED UNDER NON- AGGRESSIVE SOIL
OR GROUND WATER AND OF GRADE M-15 WITH CONCRETE FOR CORE IN M - 20 /WHERE
CONCRETE IS EXPOSED TO COASTAL ENVIRONMENT TO IS: 456 - 2000.
{ MOD 1:- 04.08.2009/26.08.2009 (REF :- RDSO'S LETTER NO. TI/CIV/FND/09)}

2. ALL THE FOUNDATIONS SHOULD PROJECT 50 TO 100 mm ABOVE THE SURROUINDINGS


GROUND LEVEL.

3. THE EXCAVATION OF BOTTOM PAD GENERALLY BE DONE BY UNDER CUTTING WHEREVER


POSSIBLE.

4. FOR DETAILS OF MUFF REFER DRAWING NO. ETI/C/0007/68 MOD 'E' (PAGE-25&26)

5. THIS DRAWING IS APPLICABLE ONLY TO NEW WORKS OR WORKS CONNECTED WITH


DOUBLING/YARD REMODELING IN RAILWAY ELECTRIFICATION SECTIONS.

6. THIS DRAWING IS SUITABLE FOR SETTING DISTANCE 2.9 m (min) IN LIEU OF 2.80(min)
FROM CENTER LINE OF TRACK TO THE FACE OF MAST TO SUIT WORKING OF CSM 09 -32
CONTINUOUS TAMPING MACHINE ,BALLAST CLEANING MACHINE, SHOULDER BALLAST
CLEANING MACHINE AND BALLAST REGULATOR MACHINE.

7. THE STEP DISTANCE (DISTANCE BETWEEN EXISTING RAIL LEVEL TO TOP OF FOUNDATION)
SHOULD NOT BE MORE THAN 500mm FOR REGULATED OHE AND 400 mm FOR UNREGULATED
OHE.

8. THE BACK FILLING SHOULD BE WELL CONOLIDATED IN LAYER OF NOT EXCEEDING 200 mm.A
SPECIAL CARE SHOULD BE TAKEN FOR FILLING ON TRACK SIDE TO AVOID FORMATION OF
WATER POCKET.

9. IT SHOULD BE ENSURE THAT THE DISTANCE BETWEEN CENTER LINE OF TRACK AND THE
FOUNDATION 50 mm BELOW FORMATION LEVEL TO TOP OF FORMATION LEVEL ON TANGENT
AND CURVES UP TO 875 M RADIUS IS 2575 mm AND RADIUS LESS THAN 875m IS 2725mm.

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 01

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CHART SHOWING EQUIVALENT SIZES OF FOUNDATION FOR OHE STRUCTURE TO SUIT VARIOUS
COMMON LOADINGS FOR DIFFERENT SOIL AND SITE CONDITIONS
TYPE OF FOUNDATIONS
FDN. DIRECT BENDING
SIDE BEARING SIDE GRAVITY FDN. ON B.C. SOIL
CODE LOAD MOMENT
IN Kg IN SOIL PRESSURE IN Kgf/m²
Kg.M
11,000 21,500 8,000 11,000 8,000
115 700 1500 B-01 HB-1 BG-0 BG-01 WBC-20
120 700 2000 B-0 HB-1 BG-1 BG-0 WBC-21
125 700 2500 B-1 HB-1 BG-2 BG-1 WBC-22
130 700 3000 B-2 HB-1 BG-3 BG-2 WBC-24
135 700 3500 B-3 HB-2 BG-5 BG-3 WBC-25
140 700 4000 B-4 HB-3 BG-6 BG-4 WBC-25
147 700 4700 B-5 HB-4 BG-7 BG-6 WBC-27
154 700 5400 B-6 HB-5 BG-9 BG-6 WBC-28
161 700 6100 B-7 HB-6 BG-9 BG-7 WBC-29
168 700 6800 B-8 HB-6 BG-10 BG-9 WBC-29
173 700 7300 B-9 HB-7 BG-11 BG-9 WBC-30
178 700 7800 B-10 HB-7 BG-12 BG-10 WBC-31
185 700 8500 B-10 HB-7 BG-13 BG-11 WBC-32
193 700 9300 B-11 HB-8 BG-14 BG-12 WBC-33
199 700 10100 B-11 HB-9 SPL BG-13 WBC-33
220 1600 2000 B-2 HB-1 BG-1 BG-0 WBC-21
225 1600 2500 B-3 HB-2 BG-3 BG-1 WBC-22
234 1600 3400 B-4 HB-3 BG-6 BG-3 WBC-25
240 1600 4000 B-5 HB-4 BG-7 BG-4 WBC-26
245 1600 4500 B-6 HB-5 BG-8 BG-5 WBC-27
250 1600 5000 B-7 HB-6 BG-9 BG-6 WBC-28
254 1600 5400 B-7 HB-6 BG-9 BG-6 WBC-28
260 1600 6000 B-8 HB-6 BG-10 BG-7 WBC-29
265 1600 6500 B-9 HB-8 BG-11 BG-9 WBC-29
270 1600 7000 B-10 HB-9 BG-11 BG-9 WBC-30
275 1600 7500 B-10 HB-9 BG-12 BG-10 WBC-31
325 3000 2500 B-4 HB-3 BG-2 BG-1 WBC-23
330 3000 3000 B-5 HB-4 BG-6 BG-3 WBC-25
340 3000 4000 B-6 HB-6 BG-8 BG-4 WBC-27
347 3000 4700 B-7 HB-6 BG-9 BG-6 WBC-28
355 3000 5500 B-8 HB-7 BG-10 BG-7 WBC-29
363 3000 6300 B-9 HB-8 BG-11 BG-8 WBC-30
374 3000 7400 B-10 HB-9 BG-12 BG-9 WBC-31
389 3000 8900 B-12 HB-9 BG-14 BG-11 WBC-33
395 3000 9500 B-12 HB-10 SPL BG-12 WBC-33
399 3000 10500 B-13 HB-11 SPL BG-13 SPL

DRAWING No. TI/CIV/FND/RDSO/00001/12/0 SHEET - 1

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 02

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

SIDE BEARING FOUNDATIONS ON NORMAL SOIL


(SOIL PRESSURE IN 11,000Kgf/m²)
0.50 OF TRACK CL
0.10 G.L
IM
P.
1.35

CL

C
L
OF TRACK
K
AC AC
R TR
TR OS NG
AC S O
K AL B
A
B

D I M E N S I O N I N Mts. VOLUME TOTAL VOLUME OF TOTAL VOLUME OF


FOUNDATION
IN CONCRETE WITH NORMAL CONCRETE WITH MUFF
REFERENCE.
A B H Cum. MUFF OF 0.02 Cum. FOR BWA 0.08 Cum.

B - 01 0.70 0.70 1.80 0.882 0.902 0.962


B-0 0.70 0.90 1.80 1.134 1.154 1.214
B-1 0.80 0.90 1.80 1.296 1.316 1.376
B-2 0.80 0.90 1.90 1.368 1.388 1.448
B-3 0.80 1.05 1.90 1.596 1.616 1.676

B-4 0.80 1.20 1.90 1.824 1.844 1.904


B-5 0.80 1.40 1.90 2.128 2.148 2.208

B-6 0.80 1.60 1.90 2.432 2.452 2.512

B-7 0.80 1.80 1.90 2.736 2.756 2.816


B-8 0.80 2.00 1.90 3.040 3.060 3.120

B-9 0.80 2.00 2.00 3.200 3.220 3.280


B - 10 0.80 2.10 2.10 3.528 3.548 3.608

B - 11 0.80 2.30 2.10 3.864 3.884 3.944


B - 12 0.80 2.50 2.10 4.200 4.220 4.280
B - 13 0.80 2.70 2.10 4.536 4.556 4.616

DRAWING No. TI/CIV/FND/RDSO/ 00001/12/0 SHEET - 1


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 03

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

SIDE BEARING FOUNDATIONS ON HARD SOIL


(SOIL PRESSURE IN 21,500Kgf/m²)

OF TRACK
0.50 CL
0.10 G.L
IM
P .
1.35

CL

C
L
OF TRACK
K
AC AC
R TR
TR OS NG
AC S O
K AL B
A
B

D I M E N S I O N I N Mts. VOLUME TOTAL VOLUME OF TOTAL VOLUME OF


FOUNDATION
IN CONCRETE WITH NORMAL CONCRETE WITH MUFF
REFERENCE.
A B H Cum. MUFF OF 0.02 Cum. FOR BWA 0.08 Cum.

HB-1 0.70 0.70 1.50 0.735 0.755 0.815


HB-2 0.70 0.80 1.50 0.840 0.860 0.920
HB-3 0.70 0.80 1.60 0.896 0.916 0.976
HB-4 0.70 0.90 1.60 1.008 1.028 1.088
HB-5 0.70 1.00 1.60 1.120 1.140 1.200

HB-6 0.70 1.20 1.60 1.344 1.364 1.424


HB-7 0.70 1.40 1.60 1.568 1.588 1.648

HB-8 0.70 1.60 1.60 1.792 1.812 1.872

HB-9 0.70 1.60 1.70 1.904 1.924 1.984


HB-10 0.70 1.70 1.70 2.023 2.043 2.103

HB-11 0.70 1.90 1.70 2.261 2.281 2.341

DRAWING No. TI/CIV/FND/RDSO/ 00001/12/0 SHEET - 1

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 04

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

SIDE GRAVITY FOUNDATIONS


(SOIL PRESSURE IN 8,000 & 11,000 Kgf/m²)
L OF TRACK
CL
OF TRACK

N
0.50 IO
AT
A NT
0.10 G.L PL
IM
1.35

CL

A
C K
AC
TR
AL O SS
ON R A
G
TR AC
B AC
K
B

D I M E N S I O N I N Mts. VOLUME TOTAL VOLUME OF TOTAL VOLUME OF


FOUNDATION
IN CONCRETE WITH NORMAL CONCRETE WITH MUFF
REFERENCE.
A B C H Cum. MUFF OF 0.02 Cum. FOR BWA 0.08 Cum.
BG-01 1.40 0.80 0.80 1.60 1.408 1.428 1.488
BG-0 1.50 0.80 0.80 1.60 1.472 1.492 1.552
BG-1 1.70 0.80 0.80 1.60 1.600 1.620 1.680
BG-2 1.80 0.80 0.80 1.60 1.664 1.684 1.744
BG-3 1.80 1.00 0.80 1.60 2.080 2.100 2.160
BG-4 1.90 1.00 0.80 1.60 2.160 2.180 2.240
BG-5 2.00 1.00 0.80 1.60 2.240 2.260 2.320
BG-6 2.00 1.20 0.80 1.60 2.688 2.708 2.768
BG-7 2.00 1.40 0.80 1.60 3.136 3.156 3.216
BG-8 2.00 1.50 0.80 1.60 3.360 3.380 3.440
BG-9 2.00 1.70 0.80 1.60 3.808 3.828 3.888
BG-10 2.00 1.90 0.80 1.60 4.256 4.276 4.336
BG-11 2.00 2.10 0.80 1.60 4.704 4.724 4.784
BG-12 2.00 2.30 0.80 1.60 5.152 5.172 5.232
BG-13 2.00 2.50 0.80 1.60 5.600 5.620 5.680
BG-14 2.00 2.70 0.80 1.60 6.048 6.068 6.128

DRAWING No. TI/CIV/FND/RDSO/ 00001/12/0 SHEET - 1


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 05

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

FOUNDATION ON WET BLACK COTTON SOIL .


(SOIL PRESSURE IN 8,000 Kgf/m²)
CL OF TRACK

IM
0.50 P.

G.L 0.15 G.L


1.35

0.05

H1

0.15
CL H2 A3
B1

(H1)
1.05

1.70
C
L
OF TRACK A1 B1

(H2)
0.5
K
B2

AC
B1

RO AC
SS TR
G
T
A2 RAC ON
AL B2
K

A3
A1
A2

VOLUME TOTAL VOLUME TOTAL VOLUME


FOUNDATION D I M E N S I O N I N Mts. OF CONC.WITH OF CONC. WITH
IN
REFERENCE. Cum. NORMAL MUFF MUFF FOR BWA
A1 A2 A3 B1 B2 H1 H2 OF 0.02 Cum. 0.08 Cum.

WBC-20 0.80 1.50 0.80 0.80 1.50 1.20 0.50 1.893 1.913 1.973

WBC-21 0.90 1.60 0.80 1.00 1.70 1.20 0.50 2.425 2.445 2.505

WBC-22 0.90 1.60 0.80 1.20 1.90 1.20 0.50 2.798 2.818 2.878

WBC-23 0.90 1.60 0.80 1.40 2.10 1.20 0.50 3.171 3.191 3.251

WBC-24 1.00 1.70 0.80 1.40 2.10 1.20 0.50 3.422 3.442 3.502

WBC-25 1.10 1.80 0.80 1.50 2.20 1.20 0.50 3.892 3.912 3.972

WBC-26 1.20 1.90 0.80 1.50 2.20 1.20 0.50 4.160 4.180 4.240

WBC-27 1.20 1.90 0.80 1.70 2.40 1.20 0.50 4.626 4.646 4.706

WBC-28 1.30 2.00 0.80 1.90 2.60 1.20 0.50 5.421 5.441 5.501

WBC-29 1.40 2.10 0.80 2.00 2.70 1.20 0.50 6.015 6.035 6.095

WBC-30 1.50 2.20 0.80 2.00 2.70 1.20 0.50 6.360 6.380 6.440

WBC-31 1.60 2.30 0.80 2.00 2.70 1.20 0.50 6.705 6.725 6.785

WBC-32 1.70 2.40 0.80 2.10 2.80 1.20 0.50 7.361 7.381 7.441

WBC-33 1.80 2.50 0.80 2.30 3.00 1.20 0.50 8.373 8.393 8.453

DRAWING No. TI/CIV/FND/RDSO/00001/12/0 SHEET - 1

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 06

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CHART SHOWING EQUIVALENT SIZES OF FOUNDATION FOR OHE STRUCTURE TO SUIT VARIOUS
COMMON LOADINGS FOR DIFFERENT SOIL CONDITIONS
TYPE OF FOUNDATIONS
FDN. DIRECT BENDING PURE GRAVITY PURE GRAVITY(500mm EXPOSED)
CODE LOAD MOMENT
IN Kg IN SOIL PRESSURE (Kgf/m²)
Kg.M
5,500 8,000 11,000 5,500 8,000 11,000
115 700 1500 NG-24 NG-21 NG-21 NG-24 NG-22 NG-22
120 700 2000 NG-26 NG-22 NG-22 NG-26 NG-22 NG-22
125 700 2500 NG-28 NG-23 NG-23 NG-28 NG-23 NG-23
130 700 3000 NG-29 NG-24 NG-24 NG-29 NG-26 NG-26
135 700 3500 NG-31 NG-25 NG-25 NG-31 NG-27 NG-27
140 700 4000 NG-33 NG-26 NG-26 NG-33 NG-29 NG-29
147 700 4700 NG-35 NG-28 NG-28 NG-35 NG-30 NG-30
154 700 5400 NG-37 NG-30 NG-30 NG-37 NG-31 NG-31
161 700 6100 NG-38 NG-31 NG-31 NG-38 NG-33 NG-33
168 700 6800 SPL NG-31 NG-31 NG-36 NG-34 NG-34
173 700 7300 SPL NG-32 NG-32 NG-37 NG-35 NG-35
178 700 7800 SPL NG-33 NG-33 NG-38 NG-36 NG-36
185 700 8500 SPL NG-34 NG-34 SPL NG-37 NG-37
193 700 9300 SPL NG-36 NG-36 SPL NG-38 NG-38
199 700 10100 SPL NG-37 NG-37 SPL SPL SPL
220 1600 2000 NG-28 NG-22 NG-22 NG-28 NG-22 NG-22
225 1600 2500 NG-29 NG-23 NG-22 NG-29 NG-23 NG-23
234 1600 3400 NG-32 NG-25 NG-24 NG-32 NG-25 NG-25
240 1600 4000 NG-34 NG-26 NG-26 NG-34 NG-27 NG-27
245 1600 4500 NG-36 NG-28 NG-28 NG-36 NG-29 NG-29
250 1600 5000 NG-37 NG-29 NG-29 NG-37 NG-30 NG-30
254 1600 5400 NG-37 NG-30 NG-30 NG-37 NG-31 NG-31
260 1600 6000 NG-38 NG-31 NG-31 NG-38 NG-32 NG-32
265 1600 6500 SPL NG-31 NG-31 SPL NG-33 NG-31
NG-33
270 1600 7000 SPL NG-32 NG-32 SPL NG-34 NG-34
275 1600 7500 SPL NG-32 NG-32 SPL NG-35 NG-35
325 3000 2500 NG-32 NG-24 NG-22 NG-32 NG-24 NG-23
330 3000 3000 NG-33 NG-25 NG-23 NG-33 NG-25 NG-23
340 3000 4000 NG-36 NG-27 NG-26 NG-36 NG-27 NG-26
347 3000 4700 NG-37 NG-28 NG-28 NG-37 NG-29 NG-29
355 3000 5500 SPL NG-29 NG-30 SPL NG-30 NG-30
363 3000 6300 SPL NG-31 NG-31 SPL NG-31 NG-31
374 3000 7400 SPL NG-32 NG-32 SPL NG-33 NG-33
389 3000 8900 SPL NG-35 NG-33 SPL NG-36 NG-36
395 3000 9500 SPL NG-36 NG-34 SPL NG-37 NG-37
399 3000 10500 SPL NG-37 NG-36 SPL NG-38 NG-38

DRAWING No. TI/CIV/FND/RDSO/00001/12/0 SHEET - 2 & 4


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 07

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

VOLUME CHART FOR N.G. TYPE FOUNDATIONS

SHEET NOTE NO:8

mm850 mm
500

VIEW ACROSS TRACK

CL
A2 B3
150 mm

A1
B2
VIEW ALONG TRACK
B1

A1
A2
PLAN

VOLUME TOTAL VOLUME TOTAL VOLUME


FOUNDATION D I M E N S I O N I N Mts. OF CONC.WITH OF CONC. WITH
IN
REFERENCE. Cum. NORMAL MUFF MUFF FOR BWA
A1 A2 B1 B2 B3 H OF 0.020 Cum. 0.080 Cum.

NG-21 1.00 0.70 1.60 1.30 0.70 1.5 1.156 1.176 1.236
NG-22 1.00 0.70 2.00 1.70 0.80 1.5 1.401 1.421 1.481
NG-23 1.00 0.70 2.20 1.90 0.95 1.5 1.608 1.628 1.688
NG-24 1.20 0.70 2.20 1.90 0.95 1.5 1.816 1.836 1.896
NG-25 1.30 0.70 2.20 1.90 0.95 1.5 1.921 1.941 2.001
NG-26 1.50 0.80 2.20 1.90 0.95 1.5 2.210 2.230 2.290
NG-27 1.70 0.80 2.20 1.90 0.95 1.5 2.418 2.438 2.498
NG-28 1.80 0.90 2.20 1.90 0.95 1.5 2.603 2.623 2.683
NG-29 2.10 1.00 2.20 1.90 0.95 1.5 2.997 3.017 3.077
NG-30 2.30 1.10 2.20 1.90 0.95 1.5 3.286 3.306 3.366
NG-31 2.50 1.30 2.20 1.90 0.95 1.5 3.656 3.676 3.736
NG-32 2.70 1.50 2.20 1.90 0.95 1.5 4.026 4.046 4.106
NG-33 2.90 1.70 2.20 1.90 0.95 1.5 4.396 4.416 4.476
NG-34 3.10 1.90 2.20 1.90 0.95 1.5 4.766 4.786 4.846
NG-35 3.30 2.10 2.20 1.90 0.95 1.5 5.136 5.156 5.216
NG-36 3.60 2.40 2.20 1.90 0.95 1.5 5.691 5.711 5.771
NG-37 4.00 2.80 2.20 1.90 0.95 1.5 6.431 6.451 6.511
NG-38 4.40 3.20 2.20 1.90 0.95 1.5 7.174 7.194 7.254

TI/DRG/CIV/FND/RDSO/00001/04/0
DRAWING No.
APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 08

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CHART SHOWING EQUIVALENT SIZES OF FOUNDATION FOR OHE STRUCTURE TO SUIT VARIOUS
COMMON LOADINGS FOR DIFFERENT SOIL CONDITIONS
TYPE OF FOUNDATIONS
FDN. DIRECT BENDING DRY B.C SOIL (3.00m DEPTH)
DRY B.C SOIL (2.50m DEPTH)
CODE LOAD MOMENT
IN Kg IN SOIL PRESSURE IN Kgf/m²
Kg.M
16,500 11,000 8,000
115 700 1500 NBC-101 NBC-103 NBC-140
120 700 2000 NBC-102 NBC-120 NBC-141
125 700 2500 NBC-102 NBC-121 NBC-142
130 700 3000 NBC-104 NBC-122 NBC-144
135 700 3500 NBC-104 NBC-123 NBC-146
140 700 4000 NBC-105 NBC-124 NBC-147
147 700 4700 NBC-106 NBC-126 NBC-149
154 700 5400 NBC-107 NBC-127 NBC-150
161 700 6100 NBC-108 NBC-128 NBC-152
168 700 6800 NBC-109 NBC-129 NBC-152
173 700 7300 NBC-109 NBC-130 SPL
178 700 7800 NBC-110 NBC-131 SPL
185 700 8500 NBC-110 NBC-132 SPL
193 700 9300 SPL NBC-132 SPL
199 700 10100 SPL NBC-133 SPL
220 1600 2000 NBC-102 NBC-120 NBC-141
225 1600 2500 NBC-102 NBC-121 NBC-143
234 1600 3400 NBC-104 NBC-123 NBC-145
240 1600 4000 NBC-105 NBC-124 NBC-148
245 1600 4500 NBC-105 NBC-125 NBC-149
250 1600 5000 NBC-106 NBC-127 NBC-150
254 1600 5400 NBC-107 NBC-127 NBC-151
260 1600 6000 NBC-108 NBC-128 NBC-152
265 1600 6500 NBC-108 NBC-129 NBC-152
270 1600 7000 NBC-109 NBC-130 SPL
275 1600 7500 NBC-109 NBC-131 SPL
325 3000 2500 NBC-103 NBC-123 NBC-144
330 3000 3000 NBC-103 NBC-123 NBC-146
340 3000 4000 NBC-103 NBC-125 NBC-149
347 3000 4700 NBC-106 NBC-127 NBC-150
355 3000 5500 NBC-107 NBC-128 NBC-152
363 3000 6300 NBC-108 NBC-130 NBC-152
374 3000 7400 NBC-109 NBC-131 SPL
389 3000 8900 NBC-110 NBC-133 SPL
395 3000 9500 NBC-111 NBC-134 SPL
399 3000 10500 SPL NBC-134 SPL

DRAWING No. TI/CIV/FND/RDSO/00001/12/0 SHEET - 3 & 5

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 09

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

NBC TYPE FOUNDATIONS ON DRY BLACK COTTON SOIL.


(SOIL PRESSURE IN 16,500 & 11,000Kgf/m²)

0.15
0.50 3.00 m DEPTH CL
G.L G.L IM
P.
1.35

0.10

H3
1.75

A2

3.00
0.40

C
L
OF TRACK B3 A2
CL
H2

0.15
B2 A2
B2 A1
B1
ACROSS TRACK ALONG TRACK
6mmØ M.S. ROUNDS 10 Nos.
WITH SUITABLE BINDERS OF
A1
A2

6mmØ 3 Nos. AC K
RO AC
S S TR
TR G
B1 AC L ON A1
K A
B3
B2
B1

VOLUME TOTAL VOLUME TOTAL VOLUME


FOUNDATION D I M E N S I O N I N Mts. OF CONC.WITH OF CONC. WITH
IN
REFERENCE. Cum. NORMAL MUFF MUFF FOR BWA
A1 A2 B1 B2 B3 H2 H3 OF 0.02 Cum. 0.08 Cum.
NBC-101 1.10 0.80 1.20 0.80 0.80 0.20 2.50 2.086 2.106 2.166
NBC-102 1.10 0.80 1.50 0.80 0.80 0.35 2.35 2.235 2.255 2.315
NBC-103 1.20 0.80 1.60 0.80 0.80 0.40 2.30 2.345 2.365 2.425
NBC-104 1.30 0.80 1.50 0.90 0.80 0.45 2.25 2.587 2.607 2.667
NBC-105 1.20 0.80 1.90 1.00 0.80 0.45 2.25 2.903 2.923 2.983
NBC-106 1.40 0.80 1.90 1.10 0.80 0.40 2.30 3.195 3.215 3.275
NBC-107 1.20 0.80 2.20 1.10 0.80 0.55 2.15 3.309 3.329 3.389
NBC-108 1.30 0.80 2.20 1.20 0.80 0.50 2.20 3.550 3.570 3.630
NBC-109 1.50 0.80 2.20 1.30 0.80 0.45 2.25 3.860 3.880 3.940
NBC-110 1.80 0.90 2.20 1.30 0.80 0.45 2.25 4.427 4.447 4.507
NBC-111 1.90 1.10 2.20 1.30 0.80 0.45 2.25 5.185 5.205 5.265
NBC-112 2.10 1.20 2.20 1.30 0.80 0.45 2.25 5.677 5.697 5.757
NBC-120 1.50 0.80 1.70 0.80 0.80 0.45 2.25 2.589 2.609 2.669
NBC-121 1.60 0.80 1.80 0.80 0.80 0.50 2.20 2.749 2.769 2.829
NBC-122 1.20 0.80 2.20 0.90 0.80 0.65 2.05 2.995 3.015 3.075
NBC-123 1.50 0.80 2.20 0.90 0.80 0.65 2.05 3.272 3.292 3.352
NBC-124 1.70 0.80 2.20 1.00 0.80 0.65 2.05 3.655 3.675 3.735
NBC-125 1.80 0.80 2.20 1.00 0.80 0.60 2.10 3.678 3.698 3.758
NBC-126 1.80 0.80 2.20 1.10 0.80 0.55 2.15 3.812 3.832 3.892
NBC-127 2.10 0.80 2.20 1.10 0.80 0.65 2.05 4.222 4.242 4.302
NBC-128 2.30 0.80 2.20 1.20 0.80 0.75 1.95 4.783 4.803 4.863
NBC-129 2.50 0.80 2.20 1.30 0.80 0.85 1.85 5.376 5.396 5.456
NBC-130 2.70 0.80 2.20 1.30 0.80 0.95 1.75 5.804 5.824 5.884
NBC-131 3.00 0.80 2.20 1.30 0.80 1.10 1.60 6.512 6.532 6.592
NBC-132 3.40 1.00 2.20 1.30 0.80 1.20 1.50 7.951 7.971 8.031
NBC-133 3.70 1.10 2.20 1.30 0.80 1.30 1.40 8.980 9.000 9.060
NBC-134 4.20 1.10 2.20 1.30 0.80 1.55 1.15 10.553 10.573 10.633

DRAWING No. TI/CIV/FND/RDSO/00001/12/0 SHEET - 3


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 10

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

NBC TYPE FOUNDATION ON DRY BLACK COTTON SOIL.


(SOIL PRESSURE IN 8,000Kgf/m²)

0.15
2.50 m DEPTH
0.50 CL
IM
G.L G.L P.
1.35

0.10
1.75

H3 A2
2.50
0.40

C
L
OF TRACK B3 A2

CL
H2

0.15 B2 A2
B2 A1
B1
ACROSS TRACK ALONG TRACK
6mmØ M.S. ROUNDS 10 Nos.
WITH SUITABLE BINDERS OF
A1
A2

6mmØ 3 Nos. AC K
R OS AC
S TR
T G
B1 RAC L ON A1
K A
B3
B2
B1

VOLUME TOTAL VOLUME TOTAL VOLUME


D I M E N S I O N I N Mts. IN OF CONC.WITH OF CONC. WITH
FDN. REF. m3 NORMAL MUFF MUFF FOR BWA
OF 0.02 Cum. 0.08 Cum.
A1 A2 B1 B2 B3 H2 H3
NBC-140 1.60 0.80 1.80 0.80 0.80 0.50 1.70 2.429 2.449 2.509
NBC-141 1.50 0.80 2.20 0.90 0.80 0.65 1.55 2.912 2.932 2.992
NBC-142 1.70 0.80 2.20 1.00 0.80 0.60 1.60 3.191 3.211 3.271
NBC-143 1.80 0.80 2.20 1.00 0.80 0.60 1.60 3.278 3.298 3.358
NBC-144 2.10 0.80 2.20 1.10 0.80 0.65 1.55 3.782 3.802 3.862
NBC-145 2.10 0.80 2.20 1.20 0.80 0.60 1.60 3.862 3.882 3.942
NBC-146 2.30 0.80 2.20 1.20 0.80 0.75 1.45 4.303 4.323 4.383
NBC-147 2.50 0.80 2.20 1.30 0.80 0.85 1.35 4.856 4.876 4.936
NBC-148 2.70 0.80 2.20 1.30 0.80 0.95 1.25 5.284 5.304 5.364
NBC-149 3.00 0.80 2.20 1.30 0.80 1.10 1.10 5.992 6.012 6.072
NBC-150 3.40 1.00 2.20 1.30 0.80 1.20 1.00 7.301 7.321 7.381
NBC-151 3.70 1.10 2.20 1.30 0.80 1.30 0.90 8.265 8.285 8.345
NBC-152 4.20 1.10 2.20 1.30 0.80 1.55 0.65 9.838 9.858 9.918

DRAWING No. TI/CIV/FND/RDSO/00001/12/0 SHEET - 5

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 11

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

PURE GRAVITY FOUNDATIONS FOR PORTAL STRUCTURE


(BEARING PRESSURE 8,250 Kgf/m²) IM
P .
OF TRACK
CL

0.40
G.L
1.45

HEIGHT

CL
ACROSS TRACK VIEW
K
AC AC
C RO TR
L SS NG
OF TRACK TR
AC ALO
K
A
B
C

B
BENDING DIRECT VOLUME TOTAL VOLUME
FDN. MOMENT
DIMENSION IN Mts. OF CONCRETE
LOAD IN
REF. AT BOTTOM IN Kg WITH NORMAL
Kg f m A B C H Cum.
MUFF OF 0.08 Cum.
P-2 4000 2000/4000 1.80 1.70 1.00 1.70 4.131 4.211
P-3 4700 2000/4000 1.80 2.00 1.00 1.70 4.590 4.670
P-4 5400 2000/4000 1.80 2.20 1.00 1.70 4.896 4.976

P-6 6000 2000/4000 2.00 2.00 1.00 1.70 5.100 5.180


P-7 7000 2000/4000 2.00 2.30 1.00 1.70 5.610 5.690

P-8 7500 2000/4000 2.00 2.40 1.00 1.70 5.780 5.860


P-9 8000 2000/4000 2.00 2.60 1.00 1.70 6.120 6.200

P-10 9400 2000/4000 2.00 3.00 1.00 1.70 6.800 6.880

P-11 10200 2000/4000 2.00 3.30 1.00 1.70 7.310 7.390


P-12 11000 2000/4000 2.00 3.60 1.00 1.70 7.820 7.900

P-13 11500 2000/4000 2.20 3.10 1.00 1.70 7.667 7.747

P-14 12500 2000/4000 2.20 3.40 1.00 1.70 8.228 8.308

P-15 13500 2000/4000 2.20 3.70 1.00 1.70 8.789 8.869

P-16 14000 2000/4000 2.20 3.80 1.00 1.70 8.976 9.056


P-17 14500 2000/4000 2.20 3.90 1.00 1.70 9.163 9.243

P-18 15000 2000/4000 2.20 4.10 1.00 1.70 9.537 9.617

DRAWING No. ETI/0005/68


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 12

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

PURE GRAVITY FOUNDATIONS FOR PORTAL STRUCTURE


(BEARING PRESSURE 11,000 Kgf/m²)

IM
P.

OF TRACK
CL

0.40
G.L
1.45

HEIGHT

CL

ACROSS TRACK VIEW C


L
OF TRACK
K
A AC AC
RO TR
SS
O NG
TR
AC AL
K
B
C

B
PLAN
ALONG TRACK VIEW
BENDING DIRECT VOLUME TOTAL VOLUME
FDN. DIMENSION IN Mts.
MOMENT LOAD IN OF CONCRETE
REF. WITH NORMAL
AT BOTTOM IN Kg Cum.
Kg f m
A B C H MUFF OF 0.08 Cum.
P-1 4000 2000/4000 1.80 1.50 1.00 1.70 3.825 3.905
P-2 5000 2000/4000 1.80 1.70 1.00 1.70 4.131 4.211
P-3 6000 2000/4000 1.80 2.00 1.00 1.70 4.590 4.670
P-4 7000 2000/4000 1.80 2.20 1.00 1.70 4.896 4.976
P-5 7500 2000/4000 2.00 1.80 1.00 1.70 4.760 4.840
P-6 8000 2000/4000 2.00 2.00 1.00 1.70 5.100 5.180
P-7 9000 2000/4000 2.00 2.30 1.00 1.70 5.610 5.690
P-8 9500 2000/4000 2.00 2.40 1.00 1.70 5.780 5.860
P-9 10000 2000/4000 2.00 2.60 1.00 1.70 6.120 6.200
P-10 11500 2000/4000 2.00 3.00 1.00 1.70 6.800 6.880
P-11 12500 2000/4000 2.00 3.30 1.00 1.70 7.310 7.390
P-12 13500 2000/4000 2.00 3.60 1.00 1.70 7.820 7.900
P-13 14000 2000/4000 2.20 3.10 1.00 1.70 7.667 7.747
P-14 15000 2000/4000 2.20 3.40 1.00 1.70 8.228 8.308
P-15 16000 2000/4000 2.20 3.70 1.00 1.70 8.789 8.869
P-16 16500 2000/4000 2.20 3.80 1.00 1.70 8.976 9.056
P-17 17000 2000/4000 2.20 3.90 1.00 1.70 9.163 9.243
P-18 17500 2000/4000 2.20 4.10 1.00 1.70 9.537 9.617

DRAWING No. ETI/0005/68


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 13

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

PORTAL FOUNDATIONS IN DRY BLACK COTTON SOIL


(BEARING PRESSURE 16,500 Kgf/m²)

IM
P.
FOUNDATION LEVEL
0.40 FORMATION LEVEL OF TRACK
100 G.L CL
1.45

6 mmØ M.S. ROD 12 No.s


EQUALLY PLACED 30 mm FROM
EDGE OF CORE HOLE.

h1
700

CL
h2

a2
a1
C
L
OF TRACK
b2
b1

6 mmØ M.S. ROD 12 No.s


EQUALLY PLACED 30 mm FROM
AC K
EDGE OF CORE HOLE. RO AC
SS TR
TR
AC NG
K ALO

DIMENSION IN Mts. VOLUME TOTAL VOLUME


FDN. BENDING MOMENT DIRECT LOAD
AT BOTTOM IN Kg IN OF CONCRETE
REF.
Kg/m a1 a2 b1 b2 h1 h2 Cum. WITH NORMAL
MUFF OF 0.08 Cum.
PBC-1 4000 2000 1.40 1.60 1.00 1.20 2.50 0.30 4.076 4.156
PBC-1 4000 4000 1.40 1.60 1.00 1.20 2.50 0.30 4.076 4.156
PBC-2 4700 2000 1.50 1.70 1.00 1.20 2.50 0.30 4.362 4.442
PBC-2 4700 4000 1.50 1.70 1.00 1.20 2.50 0.30 4.362 4.442
PBC-3 5400 2000 1.60 1.80 1.00 1.20 2.50 0.30 4.648 4.728
PBC-3 5400 4000 1.60 1.80 1.00 1.20 2.50 0.30 4.648 4.728
PBC-4 6000 2000 1.70 1.90 1.00 1.20 2.50 0.30 4.934 5.014
PBC-4 6000 4000 1.70 1.90 1.00 1.20 2.50 0.30 4.934 5.014
PBC-5 7000 2000 1.80 2.00 1.00 1.20 2.50 0.30 5.220 5.300

PBC-6 7000 4000 1.80 2.00 1.10 1.30 2.50 0.30 5.730 5.810
PBC-6 7500 2000 1.80 2.00 1.10 1.30 2.50 0.30 5.730 5.810
PBC-6 7500 4000 1.80 2.00 1.10 1.30 2.50 0.30 5.730 5.810
PBC-7 8000 2000 1.80 2.00 1.20 1.40 2.50 0.30 6.240 6.320
PBC-7 8000 4000 1.80 2.00 1.20 1.40 2.50 0.30 6.240 6.320

NOTE: 1. FOUNDATION TO BE CAST WITH 12 No.s OF 6 mm Ø M.S RODS 700 mm LONG KEPT
VERTICALLY INSIDE THE CONCRETE AROUND THE CORE HOLE SUCH THAT REINFORCEMENT
PROJECTS ABOUT 600mm BELOW THE BOTTOM OF THE PORTAL LEG.
2. VOLUME OF MUFF (0.08 Cu.m) IS NOT INCLUDED IN THE VOLUME OF FOUNDATIONS.

DRAWING No. ETI/C/0063 MOD 'B'


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 14

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

PORTAL FOUNDATIONS IN DRY BLACK COTTON SOIL


(BEARING PRESSURE 16,500 Kgf/m²)

IM
P.
FOUNDATION LEVEL
0.40 FORMATION LEVEL OF TRACK
100 G.L CL
1.45

6 mm Ø M.S. ROD 12 No.s


EQUALLY PLACED 30 mm FROM

h1
700

EDGE OF CORE HOLE.

CL
h2

a2
a1
C
L
OF TRACK

6 0 mmØ M.S.
ROD 12 No.s
EQUALLY
b2
b1

PLACED
AC K
30 mm FROM RO AC
EDGE OF
SS TR
TR G
AC ON
CORE HOLE K AL

DIMENSION IN Mts. VOLUME TOTAL VOLUME


FDN. BENDING MOMENT DIRECT LOAD
IN OF CONCRETE
REF. AT BOTTOM IN Kg
a1 a2 b1 b2 h1 h2 WITH NORMAL
Kg/m Cum.
MUFF OF 0.08 Cum.
PBC-8 9400 2000 1.80 2.00 1.40 1.60 2.50 0.30 7.260 7.340
PBC-8 9400 4000 1.80 2.00 1.40 1.60 2.50 0.30 7.260 7.340
PBC-9 10200 2000 1.80 2.00 1.60 1.80 2.60 0.30 8.568 8.648
PBC-9 10200 4000 1.80 2.00 1.60 1.80 2.60 0.30 8.568 8.648
PBC-9 11000 2000 1.80 2.00 1.60 1.80 2.60 0.30 8.568 8.648
PBC-10 11000 4000 1.80 2.00 1.70 1.90 2.70 0.30 9.402 9.482
PBC-10 11500 2000 1.80 2.00 1.70 1.90 2.70 0.30 9.402 9.482

PBC-11 11500 4000 1.80 2.00 1.80 2.00 2.70 0.30 9.948 10.028

PBC-12 12500 2000 1.90 2.10 1.80 2.00 2.70 0.30 10.494 10.574
PBC-12 12500 4000 1.90 2.10 1.80 2.00 2.70 0.30 10.494 10.574
PBC-13 13500 2000 1.90 2.10 1.90 2.10 2.70 0.30 11.070 11.150
PBC-13 13500 4000 1.90 2.10 1.90 2.10 2.70 0.30 11.070 11.150

PBC-13 14000 2000 1.90 2.10 1.90 2.10 2.70 0.30 11.070 11.150
PBC-14 14000 4000 2.00 2.20 1.90 2.10 2.70 0.30 11.646 11.726
PBC-14 15000 2000 2.00 2.20 1.90 2.10 2.70 0.30 11.646 11.726
PBC-14 15000 4000 2.00 2.20 1.90 2.10 2.70 0.30 11.646 11.726
NOTE: 1. FOUNDATION TO BE CAST WITH 12 No.s OF 6 mm Ø M.S RODS 700 mm LONG KEPT
VERTICALLY INSIDE THE CONCRETE AROUND THE CORE HOLE SUCH THAT REINFORCEMENT
PROJECTS ABOUT 600mm BELOW THE BOTTOM OF THE PORTAL LEG.
2. VOLUME OF MUFF (0.08 Cu.m) IS NOT INCLUDED IN THE VOLUME OF FOUNDATIONS.
DRAWING No. ETI/C/0063 MOD 'B'
APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 15

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

SOFT ROCK FOUNDATION


(SOIL PRESSURE 45,000 Kgf/m²)

L OF TRACK
C
CL
OF TRACK

RAIL LEVEL ON
ATI
TOP OF NT
0.50 PLA
FOUNDATION
IM
G.L. 100 G.L.

CORE HOLE TO BE
1.35

FILLEDUP BY
CONCRETE
H 1500

SEE NOTE -2
CL

FOR CONCERETE
SEE NOTE-2

AL SS
TR ON RO
AC G AC ACK
ELEVATION K T R

B A
B

A
PLAN

TOTAL VOLUME
DIMENSIONS
IN METRES SAFE B.M
AT
THE WITH WITH VOLUME
FDN. NORMAL BWA IN
TOP OF
A B H FDN. MUFF MUFF Cu.m
0.02 Cum 0.08 Cum

SRB - 1 0.7 0.7 1.6 8200 Kg.m 0.804 0.864 0.784

SRB - 2 0.7 0.8 1.6 9300 Kg.m 0.916 0.976 0.896

SRB - 3 0.7 0.9 1.6 10400 Kg. m. 1.028 1.088 1.008

NOTE:-
1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE

2. FOUNDATION CONCRETE SHOULD BE OF GRADE M-15 WITH CONCRETE FOR


CORE IN M-20 WHERE CONCRETE IS IN CONTACT OR BURIED UNDER NON
AGGRESSIVE SOIL GROUND WATER AND OF GRADE M-20 WITH CONCRETE
FOR CORE IN M-20 WHERE CONCRETE IS EXPOSED TO COSTAL ENVIRONMENT
TO IS : 456-2000
3. LOOSE SOIL HAS BEEN ASSUMED FOR TOP 0.2m IN CASE LOOSE
SOIL EXCEEDS, THE DEPTH OF FOUNDATION MAY SUITABLE INCREASED

DRAWING No. ETI/C/0059 MOD 'B'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 16

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

SOFT ROCK FOUNDATION


(SOIL PRESSURE 45,000 Kgf/m²)

L OF TRACK
C
CL
OF TRACK

RAIL LEVEL
P.
0.40 TOP OF IM
FDN.
G.L. 100 G.L.

CORE HOLE TO BE
FILLEDUP BY
1.45

CONCRETE
H 1700

SEE NOTE -2
CL

FOR CONCERETE
SEE NOTE-2

AL SS
TR ON RO
AC G AC ACK
ELEVATION K T R
1250

1250
PLAN

NOTES:

1. ALL DIMENSIONS ARE IN mm. UNLESS STATED OTHERWISE

2. PLAIN CONCRETE (WITH M-15/20) SHALL CONFORM TO IS: 456-2000

3. LOOSE SOIL HAS BEEN ASSUMED FOR TOP 0.2m. IN CASE LOOSE SOIL
EXCEEDS, THE DEPTH OF FOUNDATION MAY BE SUITABLE INCREASED

4. MINIMUM DEPTH OF EXCAVATION INSIDE SOFT ROCK SHOULD BE 1.20m.


AND MINIMUM EMBEDDED LENGTH 1.45m. AND 0.15m. BOTTOM PADING
TO BE PROVIDED.

5. DIMENSIONS ARE APPROXIMATE AND ACTUAL VOLUME OF FDN. TO BE


CALCULATED AT SITE.

DRAWING No. ETI/C/0059 MOD 'B'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 17

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

HARD ROCK FOUNDATION FOR PORTALS


(SOIL PRESSURE 90,000 Kgf/m²)

PORTAL UP RIGHT

VARIABLE AS PER
SITE CONDITION

IM
100

G.L. G.L. P.
ROCK LEVEL

CORE HOLE TO BE FILLED OF TRACK


BY M- 20 CONCRETE CL
HEIGHT

M. 15
CONCRETE

CL

1100 DIA

AC K
RO AC
SS TR
1400 TR G
AC ON
CL K AL
OF TRACK
1100 DIA
1400

50
0R

PLAN

NOTE:

1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE

2. FOR EXCAVATION OF FOUNDATION APPROXIMATE DIMENSION ARE GIVEN.

3. VOLUME OF FOUNDATION TO BE CALCULATED AS PER ACTUAL CONCRETEING MADE AT SITE FOR


EACH LOCATION

4. LOOSE SOIL HAS BEEN ASSUMED FOR TOP 0.20 m.

5. MINIMUM DEPTH OF EXCAVATION INSIDE HARD ROCK SHOULD BE 1.2 m. AND MINIMUM EMBEDDED
LENGTH OF 1.45 m. TO BE PROVED.

6. PLAIN CONCRETE (WITH M.15 / 20) SHALL CONFORM TO IS-456-2000

DRAWING No. ETI/C/0080 MOD 'A'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 18

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

HARD ROCK FOUNDATION


(SOIL PRESSURE 90,000 Kgf/m²)

OHE MAST

VARIABLE AS PER
SITE CONDITION
150

G.L. IM
G.L. ROCK LEVEL P.

CORE HOLE TO BE FILLED OF TRACK


BY M- 20 CONCRETE CL
HEIGHT

M. 15
CONCRETE

CL

600 DIA

AC
RO K
SS AC
1000 TR TR
AC NG
CL K ALO
OF TRACK
600 DIA
1000

50
0R

PLAN

NOTE:

1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE

2. FOR EXCAVATION OF FOUNDATION APPROXIMATE DIMENSION ARE GIVEN.

3. VOLUME OF FOUNDATION TO BE CALCULATED AS PER ACTUAL CONCRETEING MADE AT SITE FOR


EACH LOCATION

4. LOOSE SOIL HAS BEEN ASSUMED FOR TOP 0.20 m.

5. MINIMUM DEPTH OF EXCAVATION INSIDE HARD ROCK SHOULD BE 1.2 m. AND MINIMUM EMBEDDED
LENGTH OF 1.45 m. TO BE PROVED.

6. PLAIN CONCRETE (WITH M.15 / 20) SHALL CONFORM TO IS-456-2000

DRAWING No. ETI/C/0060 MOD 'B'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 19

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

ANCHOR ANCHOR BLOCK FOUNDATION


LOOP (NORMAL SOIL)
PART NO.
5008
15
39

25
4

G.L 200 G.L.


150 H

200

75 62.5
ANCHOR
AC K
MUFF ROS AC
125
S TR
300

NG
B1

TR
LO
B

150 AC A
K
125

200 100 A

ALLOCATION CHART FOR ANCHOR FOUNDATION

DIMENSIONS IN METRES VOLUME


ANCHOR
IN USAGE
BLOCK
A B B1 H Cu.m.
FOR TERMINATION WITH MAX.
A1 1.35 0.70 0.70 1.00 0.957 TENSION 800 Kgf. (eg. EARTH
WIRE OR SHORT FEEDER)
FOR TERMINATION WITH MAX.
A2 1.75 0.80 0.80 1.00 1.412 TENSION 1500 Kgf. (eg. ANTI
CREEP WIRE OR LONGITUDINAL
FEEDER)
FOR TERMINATION WITH MAX.
A3 1.80 1.00 0.95 1.00 1.799 TENSION 2000 Kgf. (eg. SINGLE
REGULATED OHE)

FOR TERMINATION WITH MAX.


A4 2.20 1.00 0.95 1.00 2.196 TENSION 3000 Kgf. (eg. SIGNAL
UN-REGULATED OHE)

NOTE:

1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE

2. THIS ARRANGEMENT IS BASED ON 9.70m GUY ROD (PART No. 5005)

3. FOR DETAILS OF ANCHOR BLOCK FOR DOUBLE ANCHORAGE OF OHE SEE DRAWING No.ETI/OHE/G/01403 SHEET-2

4. FOR DETAILS OF ANCHOR BLOCK IN BLACK COTTON SOIL SEE DRG.No. ETI/OHE/G/01403 SHEET-3

5. THIS ANCHOR BLOCK ARRANGEMENT IS APPLICABLE FOR ALL SOIL OTHER THAN BLACK COTTON SOIL.

6. VOLUME OF CONCRETE INCLUDE THAT OF MUFF

DRAWING No. ETI/OHE/G/01403/MOD'D' SHEET-1

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 20

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CHART FOR ANCHOR SETTING DISTANCE


B.C. SOIL NORMAL SOIL

H
HRL HRL
G.L S G.L S

S:STEP DISTANCE
L L

ANCHOR BLOCK SETTING DISTANCE (L) IN METRES


HEIGHT OF GUY ROD FITTING FROM THE
SL.No.
TOP OF ANCHOR BLOCK H+S IN METRE MAST WIDTH UP MAST WIDTH
TO 300mm.(MAST) ABOVE 300mm.(PORTALS)
1 7.56 TO 7.30 7.35 7.50
2 7.30 TO 7.00 7.65 7.80
3 7.00 TO 6.70 7.90 8.05
4 6.70 TO 6.40 8.15 8.30
5 7.56 TO 7.85 7.10 7.25
6 7.85 TO 8.10 6.80 6.95

ANCHOR BLOCK SETTING


DISTANCE (L) IN METRES
HEIGHT OF GUY ROD FITTING
FROM THE TOP OF MAST WIDTHUP MAST WIDTH
SL.No.
ANCHOR BLOCK H+SIN METRE TO 300mm. ABOVE 300mm.
(MASTS) (PORTALS)
BCA1 BCA2/BCA3 BCA1. BCA2/BCA3

1 6.35 TO 6.75 7.60 7.35 7.75 7.50

2 6.80 TO 7.15 7.25 7.00 7.40 7.15

3 7.20 TO 7.56 6.90 6.60 6.60 6.75

SETTING DISTANCE FROM CENTRE OF


HEIGHT OF GUY ROD FITTING MAIN MAST TO CENTRE OF DWARF
SL.No. FROM THE TOP OF MAST (IN METERS)
ANCHOR BLOCK H+SIN METRE
FACRICATED
8x6 RSJ PORTAL
MAST/TTC

1 5.75 TO 6.25 4.80 4.90 5.05

2 6.30 TO 6.80 4.40 4.50 4.60

3 6.85 TO 7.35 3.90 4.00 4.05

SL.No. ANCHOR BLOCK NORMAL DWARF BLACK COTTON DWARF-BC

1 BWA , FTA A-3 DF - 2 BCA-2 BCADF-2

1 ACA , RCA , FA , BWA , FTA, A-2 DF - 1 BCA-1 BCADF-1

NOTE: 1.NORMAL ANCHOR HEIGHT : 7.06 FROM R.L


2. NORMAL SETTING DISTANCE 7.35(MAST)7.50(PORTAL)
DRAWING No. ETI/OHE/G/01401 SHEET-1 & 3
APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 21

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

ANCHOR FOUNDATION FOR DWARF MAST FOUNDATION ON WET &


B.C. SOIL DRY. B.C. SOIL
ANCHOR "V" BOLT

H.R.L

500
G.L./R.L.
TOP OF FDN

1.35
G.L. 100 200

H1
1500

500
H1

0.45
ANCHOR LOOP

H2
0.15
H2 FDN. TO BE CAST
WITH 10 No.s OF
A1
A2 6mm RODS 500mm
LONG

B1
B2
B1

B2

A1
A2 A2
CL TRACK CL TRACK

DIMMENSIONS IN METRES
FDN.
USAGE
VOLUME
A1 A2 B1 B2 H1 H2 IN Cu.m

BCA 1 0.9 FOR TER. OF


1.5 0.8 1.2 2.3 0.5 2.556
SINGLE A.C. WIRE
FOR TER. OF
BCA 2 1.3 1.9 0.8 1.15 2.4 0.5 3.589
SINGLE REG. OHE
FOR TER. OF
BCA 3 1.4 2.0 0.9 1.50 2.6 0.5 4.776 SINGLE UN-REG. OHE

DIMMENSIONS IN METRES

FDN. USAGE
VOLUME
A1 A2 B1 B2 H1 H2 IN Cu.m

FOR ANCHORAGE OF
BCARDF 1 1.5 2.1 0.9 1.5 2.3 0.5 4.343
R.C./FDR/A.C. WIRE
FOR ANCHORAGE OF
BCARDF 2 1.7 2.3 0.9 1.5 2.4 0.5 5.039
SINGLE REG. OHE
FOR ANCHORAGE OF
BCARDF 3 2.2 2.8 0.9 1.5 2.4 0.5 6.439 SINGLE UN-REG. OHE

NOTE:-

1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE

2. THIS ARRANGEMENT IS BASED ON 9.70m GUY ROD (PART No. 5005)

3. FOR DETAILS OF ANCHOR BLOCK IN SOIL OTHER THAN BLACK COTTON FOR DOUBLE ANCHORAGE

SEE DRG.No. ETI/OHE/G/01403 SHEET 1 & 2 RESPECTLY.

DRAWING No. ETI/OHG/G/01402 & 01403 MOD 'B'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 22

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

DWARF MAST ANCHOR FOUNDATION FOR LOOSE SOIL


(SOIL PRESSURE 5500 Kgf/m²)
GUY ROD
GUY ROD

2.50
0.10
45°
APEX 0.10

2.50
65°
APEX R.L.P.F. LEVEL 0.30

1.35
P.F. LEVEL

h
1.35 150
h
a2
a2
a1
a1 0.60

0.60

b
b

TYPE - 01 TYPE - 02
TYPE-1 THESE FOUNDATION ARE SUITABLE FOR DWARF MASTS ON ALL TYPES OF
PLATFORMS AND OTHER LOCATION

VOLUME VOLUME
TYPE

MAX.HORI
FDN. ZONTAL a1 a2 b h IN INCLUDE USAGE
PULL (m) (m) (m) (m) Cu.m MUFF
0.02Cu.m
FOR ANCHORAGE OF
DF - 1 1300 Kg 1.00 3.40 1.20 1.50 3.960 3.980 AC/RC FEEDER
TYPE-1

2000 Kg 4.500 FOR ANCHORAGE OF


DF - 2 1.00 4.00 1.20 1.50 4.520
REGULATED OEE.
FOR ANCHORAGE OF
DF - 3 3000 Kg 1.50 4.50 1.40 1.50 6.300 6.320
UN-REGULATED OHE.

TYPE-2 THESE FOUNDATION ARE TO BE USED ONLY FOR RAIL LEVEL PLATFORMS
WHICH ARE LIKELY TO BE RAISED

VOLUME
TYPE

MAX.HORI a1 a2 VOLUME
FDN. b h INCLUDE
ZONTAL (m) (m) IN USAGE
(m) (m) MUFF
PULL Cu.m
0.108Cu.m
FOR ANCHORAGE OF
DF - 4 1500 Kg 1.50 3.80 1.20 1.50 4.770 4.878 AC/RC FEEDER
TYPE-2

DF - 5 2000 Kg FOR ANCHORAGE OF


2.00 4.40 1.20 1.50 5.760 5.868 REGULATED OHE.
FOR ANCHORAGE OF
DF - 6 3000 Kg 2.30 4.60 1.60 1.50 8.280 8.388 UN-REGULATED OHE.

NOTE:
1. FILLING AROUND FOUNDATION BLOCK SHOULD BE WELL CONSOLIDATED

2. MUFF FOR DWARF MAST TO BE AS PER DRAWING No.ETI/C/0007/68

3. FOUNDATION SHOULD BE CAST MONOLITHIC IN ONE BLOCK

4. FOR DETAIL ARRANGEMENT OF DWARF MAST ANCHOR SEE DRAWING No.ETI/OHE/G/01402

DRAWING No. ETI/C/0014/70

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 23

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

DOUBLE GUY ROD ANCHOR BLOCK ARRANGEMENT


ANCHOR V BOLT
ANCHOR BOLT (PART No. 5007-1)
5001-1
ANCHOR BOLT
HRL

21
5001

00
TOP OF FOUNDATION.
200

90
G.L.
0
150
G.L. 150 100 G.L.
70
16

0
00

ANCHOR LOOP.

2900
90

1200

2800
(PART No. 5001)
0

200200
5

250250
1
1

500
ANCHOR BOLT (2 SETS)
2700 C
L CORE HOLE
COMPLETE WITH NUT,
LOCK NUT,SPLIT OF FDN.
COTTER & WASHER AT
114 CENTRES SET TO
500
SUIT ANCHOR HEIGHT 300

1400
1200
950
1400
950
300

114

3200
3400
ANCHOR BLOCK ' AS '
( APPLICABLE FOR ALL SOIL OTHER ANCHOR BLOCK BCA 4
THAN BLACK COTTON SOIL ) ( APPLICABLE FOR ALL BLACK COTTON SOIL )

VOLUME OF CONCRETE =4.375 Cu.m. VOLUME OF CONCRETE =13.396 Cu.m.


STYLE 02
STYLE 01

SL. HEIGHT OF BOTTOM GUY ROD ANCHOR BLOCK SETTING DISTANCE 'L' (m)
No. FITTING FROM TOP OF ANCHOR MAST WIDTH UP TO MAST WIDTH ABOVE
BLOCK IN METRES (H+S) 300 300
1. 7.15 TO 6.76 5.45 5.60
2. 6.75 TO 6.35 5.35 6.00

SL. ANCHOR HEIGHT 'H' FOR OHE


DESCRIPTION
No. REGULATED UN REGULATED
ERECTION HEIGHT WITH
1. RESCEPECT TO EXISTING RAIL 7060 7160
LEVEL
HEIGHT WITH RESPECT TO
2. FINAL RAIL LEVEL 6750 6910

NOTE:
1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE.

2. ANCHOR BLOCK 'A5' IS SUITABLE FOR HORIZONTAL TENSION OF 6000 Kg f WHERE


AS BCA 4 IS SUITABLE FOR TENSION OF 5000 Kg f ONLY.
3. ANCHOR BLOCK 'BCA 4' IS APPLICABLE FOR DRY BLACK COTTON SOIL AND 'A5' FOR
ALL OTHER SOILS.

4. ANCHOR BLOCK ON DRY B.C. SOILS IS CAST WITH 16 No.S OF 6 mm DIA RODS 500 mm
LONG KEPT VERTICALLY INSIDE THE CONCRETE AROUND THE CORE HOLE SUCH THAT
THE REINFORCEMENT PROJECTS ABOUT 400 mm. BELOW THE BOTTOM OF ANCHOR
LOOP (PART No. 5008)

DRAWING No. ETI/OHE/G/01403 MOD 'C' SHEET-2

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 24

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

DETAIL OF MUFF FOR STRUCTURES WITHOUT B.W ANCHOR


C
LOF MAST C
L OF MAST

FINAL TRACK FINAL TRACK


VARIABLE
NOT
<100 LEVEL LEVEL

VARIABLE
NOT VARIABLE
NOT CL
OF
MORETHAN 250 MORETHAN 250
TRACK
50 50
VARIABLE G.L. NOT<100 TOP OF
FDN.
TOP OF FDN. G.L. G.L.

FOUNDATION FOUNDATION
A A
BLOCK BLOCK
C C

TROWEL FINISH
B

TO 1:2:4
CONCRETE MUFF
D
B

STYLE-02
STYLE-01
TOP OF FOUNDATION IS BELOW TOP OF FOUNDATION IS ABOVE
GROUND LEVEL GROUND LEVEL

MAST DIMENSIONS IN MTS.


REFERENCE. A B C D NOTE:-
6"X6"BFB 350 175 150 150
1. ALL DIMENSIONS ARE IN mm UNLESS STATED
8"X6"RSJ 400 175 200 150
OTHERWISE.
B-100 500 150 300 100
2.M-15 CONCRETE MIXTURE TO BE USED FOR
B-125 500 162.50 300 125 ALL MUFF
B-150 500 175 300 150 3.TO PREVENT THE ACCUMULATION OF WATER
AT THE BOTTOM OF OHE STRUCTURE, THE
B-175 500 187.50 300 175 MUFF SHOWN IN THIS DRAWING IS TO BE
B-200 500 200 300 200 ADOPTED
B-225 500 212.50 300 225 4. IN CASE THE BWA MUFF OVERHANGS FROM
B-250 THE FOUNDATION TO DIMENSION THE
500 225 300 250
ARRANGEMENT AS SHOWN MAY BE ADOPTED
TWOTRACK
CANT. 500 212.50 300 225
STRUCT
200x200mm C
L OF MAST
49.40Kg/m 400 200 200 200
B.F.B
'N' TYPE E
650 325 450 450
PORTAL TOP OF MUFF
'O' TYPE FOUNDATION LEVEL
750 375 550 550
PORTAL
'P' TYPE 505 250 305 300 300
PORTAL
'G'TYPE
450 290 250 380 MONOLITHIC
PORTAL
CONCRETE
BFB PORTAL
350 250 150 305
307X152
'R' TYPE
800 400 600 600
PORTAL
DRAWING No. ETI/C/0007/68 MOD 'E'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 25

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

DETAIL OF MUFF FOR STRUCTURES WITH B.W ANCHOR


C
L C
L
OF MAST OF MAST
FINAL TRACK
FINAL TRACK LEVEL LEVEL
200

200
TOP OF MUFF
50

50
TOP OF
FDN.
VARIABLE VARIABLE
G.L. G.L. G.L. G.L.

FOUNDATION F
F
BLOCK B E
B E D
C
A

C
A
C
D TROWEL FINISH
OF TRACK TO 1:2:4 CONCRETE MUFF TROWEL FINISH
C
L
TO 1:2:4 CONCRETE MUFF
MUFF FOR RSJ, BFB,B-SERIES FABRICATED MASTS & OF TRACK
C
L
TWO TRACK CANTILEVER STRUCTURES
STYLE 04
STYLE 03

MAST DIMENSIONS IN MTS.


REFERENCE. A B C D E F NOTE:-
6"X6"BFB 350 175 150 150 465 640
1. ALL DIMENSIONS ARE IN mm UNLESS STATED
8"X6"RSJ 400 175 200 150 465 640
OTHERWISE.
B-100 500 150 300 100 ---- ---- 2.M-15 CONCRETE MIXTURE TO BE USED FOR
B-125 500 162.50 300 125 ---- ---- ALL MUFF
B-150 500 175 300 150 535 710 3.TO PREVENT THE ACCUMULATION OF WATER
AT THE BOTTOM OF OHE STRUCTURE, THE
B-175 500 187.50 300 175 547.50 735 MUFF SHOWN IN THIS DRAWING IS TO BE
B-200 500 200 300 200 560 760 ADOPTED
B-225 500 212.50 300 225 572.50 785 4. IN CASE THE BWA MUFF OVERHANGS FROM
B-250 500 225 300 250 810 THE FOUNDATION TO DIMENSION THE
585
ARRANGEMENT AS SHOWN MAY BE ADOPTED
TWOTRACK
CANT. 500 212.50 300 225 572.50 785
STRUCT
200x200mm
49.40Kg/m 400 200 200 200 465 665
B.F.B
'N' TYPE
650 325 450 450 685 1010 C
PORTAL L OF MAST
'O' TYPE 735
750 375 550 550 1110
PORTAL
E
'P' TYPE 505 250 305 300 610 860
PORTAL TOP OF MUFF
FOUNDATION LEVEL
'G'TYPE
450 290 250 380 650 940
PORTAL
300
BFB PORTAL
350 250 150 305 610 860
307X152
'R' TYPE 760 MONOLITHIC
800 400 600 600 1160
PORTAL CONCRETE

DRAWING No. ETI/C/0007/68 MOD 'E'

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 26

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

DRY BLACK COTTON SOIL A.T. FOUNDATION


(SOIL PRESSURE IN 16,500 Kgf/m²)

b2

H=3.00
h3

IM
P.
OF TRACK
h2

CL
h1
CL b1
ACROSS TRACK
ALONG TRACK
a1
a2
b2
b1

C
L
OF TRACK

AC K
PLAN RO AC
SS TR
TR
AC O NG
K AL

FOUNDATION FOR DRY BLACK COTTON SOIL

DIMMENSIONS IN METRES VOLUME


FDN. SOIL PRESSURE IMPLANTATION
IN Cu.m
(Kg/M2) (Mts.)
a1 a2 b1 b2 h1 h2 h3

ATBC-1 1.20 0.80 1.60 0.80 0.15 0.40 2.35 2.345 16500 3.50
+0.10m (NORMAL)

DRAWING No. CR/74/DK-RE/AT-01

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 27

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

NORMAL, LOOSE SOIL & HARD SOIL A.T. FOUNDATION


(SOIL PRESSURE IN (8000, 11,000), (5,500), (21,500) Kgf/m²)

OF TRACK
CL CL
OF TRACK
G.L G.L
P.
IM
H

B
CL ALONG TRACK VIEW

B
C
SS
AL RO K
O AC RAC
HEIGHT

TR NG T
AC
K
A

PLAN ACROSS TRACK VIEW

DIMMENSIONS IN METRES
FDN. VOLUME SOIL PRESSURE IMPLANTATION
a b c h IN Cu.m (Mts.)

ATF 1 11000 3.50


1.20 1.50 0.8 1.60 2.208
(NORMAL SOIL)

8000
ATF-2 1.50 1.50 0.8 1.60 2.760 3.50
(NORMAL SOIL)

1.70 2.10 0.8 3.944 5500


ATF-3 1.60 3.50
(LOOSE SOIL)

21500
ATF-4 1.20 1.50 0.8 1.60 2.208 3.50
(HARD SOIL)

DRAWING No. CR/74/DK-RE/AT-01

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 28

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

RO IA
SCROLL BOX FOR FOUNDATION

D
D
1"
DIA=P
40 R
DIA=P
RO IA
D
D

150
1"

40R
50
50 50

WELDED AND RIVETTED

560
OR WITH O 8 mm RIVETS

4 No s. OF RINGS 1"X1/8"
FLAT WELDED TO RIBS

1"
1700

1"X1 /8" FLAT


WELDED - TO RIBS

4 NOs. OF RINGS 1"X1 /8"


FLAT WELDED TO SHELL 1/8"
1"/16 HOLES DRILLED

560
500
SHELL 1"/8 M.S.PLATE

Q DIA Q DIA
ELEVATION
SECTION END VIEW 'A-A'

RIBS
DIMMENSIONS OF SCROLL
1"X1 /8" TYPE
FLAT OF TYPE OF MAST. 'P' 'Q' SCROLL
WELDED TO SCROLL IN mm IN mm VOLUME IN
SHELL Cum.

A 6X6 BFB 450 400 0.241

PLAN 8X6 RSJ


B 450 400 0.241

C B SERIES 500 450 0.302


NOTE:

1. ALL DIMENSIONS IN mm UNLESS STATED OTHER WISE SPECIFIED.

2. DIMENSIONS P & Q SHOWN IN TABLE ARE OUTER DIAMETERS.

3. THE HANDLE WILL BE PAINTED RED.


4. OTHER TYPE OF MAST (EXCEPT THE MAST SHOWN IN TABLE)
SUITABLE WOODEN BOXES MAY BE USED

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 29

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

VOLUME OF CORE HOLE ON MAST & TTU

)
IN
(M BFB & RSJ MAST
40
EMBEDDED CORE VOLUME
CORE DEPTH (m)
LENGTH (m) (m3)

200
1.35 1.45 0.202
1.45 1.55 0.218
BFB 1.55 1.65 0.234
152 RSJ
400

SCROLL FOR BFB & RSJ MAST

203 ) BFB & RSJ MAST


IN
(M
EMBEDDED CORE VOLUME
40 CORE DEPTH (m)
LENGTH (m) (m3)
1.35 1.45 0.208
200

1.45 1.55 0.218


1.55 1.65 0.234
8"X8" BFB

400

SCROLL FOR "8x8"BFB

250 )
(MAX) IN
(M
40 K&B SERIES,BFB & TTU UP RIGHT
EMBEDDED CORE VOLUME
CORE DEPTH (m)
300

LENGTH (m) (m3)


1.35 1.45 0.253
1.45 1.55 0.272
1.55 1.65 0.292

450

SCROLL FOR K/B SERIES


BFB UPRIGHT & TTC MAST

NOTE : 1. ALL DIMENSIONS ARE IN mm. UN LESS OTHERWISE STATED.

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 30

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

VOLUME OF CORE HOLE PORTAL


SCROLL FOR 'N' TYPE PORTAL

SCROLL FOR 'N' TYPE PORTAL

EMBEDDED CORE DEPTH (m) CORE VOLUME


LENGTH (m) (m3)
550

450

1.35 1.45 0.439


1.45 1.55 0.469
1.55 1.65 0.499

550

SCROLL FOR 'O' TYPE PORTAL

SCROLL FOR 'O' TYPE PORTAL

EMBEDDED CORE DEPTH (m) CORE VOLUME


650

LENGTH (m) (m3)


1.35 1.45 0.613
550

1.45 1.55 0.655


1.55 1.65 0.697

650

SCROLL FOR 'R' TYPE PORTAL


700
600

SCROLL FOR 'R' TYPE PORTAL

EMBEDDED CORE VOLUME


LENGTH (m) CORE DEPTH (m) (m3)
1.35 1.45 0.711
700
600

1.45 1.55 0.760


1.55 1.65 0.809

SCROLL FOR 'G' TYPE PORTAL

SCROLL FOR 'G' TYPE PORTAL


EMBEDDED CORE DEPTH (m) CORE VOLUME
LENGTH (m) (m3)
250
550

1.35 1.45 0.439


1.45 1.55 0.469
1.55 1.65 0.499

400
550

NOTE : 1. ALL DIMENSIONS ARE IN mm. UN LESS OTHERWISE STATED.


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 31

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

STANDARD SETTING OF STRUCTURES IN THE VICINITY OF SIGNALS (BG)


FOR COLOUR LIGHT SIGNALS WITH HORIZONTAL ROUTE
INDICATOR FOR VISIBILITY AT 600 METERS
3.05 3.20 3.35 3.55 3.80 4.02 SETTING DISTANCE
60 35 45 45 65 60 OF MAST (METRES)
125
170 DISTANCE FROM
SIGNAL POST
215 (METRES)
250
310

DIRECTION OF TRACK
CL
OF TRACK

3.05 3.20 3.35 3.55 3.80


SETTING DISTANCE
OF MAST (METERS)
65 45 40 60 70
130
170 DISTANCE FROM
215 SIGNAL POST
280 (METERS)

FOR COLOUR LIGHT SIGNALS WITH ROUTE INDICATOR WITHOUT


HORIZONTAL ARM FOR VISIBILITY AT 600 m

FOR COLOUR LIGHT SIGNALS WITHOUT ROUTE INDICATOR


FOR VISIBILITY AT 600 METERS
2.80 (NORMAL)
3.05 3.20 3.35 3.40 3.55 SETTING DISTANCE
80 45 45 20 50 OF MAST (METRES)

70
DISTANCE FROM
115
SIGNAL POST
160 (METRES)

240

DIRECTION OF TRACK
CL
OF TRACK

3.20 3.35 3.40 3.55 SETTING DISTANCE


3.05 OF MAST (METRES)

130 80 80 30 80
110
DISTANCE FROM
190 SIGNAL POST
270 (METRES)
400
2.80 (NORMAL)
FOR COLOR LIGHT SIGNALS WITH ROUTE INDICATOR
FOR VISIBILITY AT 1000 METERS
DRAWING No. ETI/OHE/G/00112
APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 32

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

STANDARD SETTING OF STRUCTURES IN THE VICINITY OF SIGNALS


(BROAD GUAGE)

NOTES:-

1. THE DISTANCE BETWEEN OHE STRUCTURES AND SIGNAL POST MAY BE REDUCED TO 3m
PROVIDED THE OHE STRUCTURE IS NOT GUYED TOWARDS THE SIGNAL

2. FOR COLOR LIGHT REFER FIG. Nos. 2 TO 9 AND FOR SEMAPHORE SIGNALS REFER FIG.1.

3. THE DOTTED LINES IN FIG. 6 TO 9 REPRESENT RECOMMENDED SETTING FOR OHE STRUCTURES
FOR SIGNALS OTHER THAN DISTANT SIGNAL, THE SETTING SHALL BE AS PER FIG.NO.2,3,4,5,6,7
AND 8 IN CASE OF DISTANT SIGNAL WHERE NO APPROACH SIGNAL IS PROVIDED
SIMULTANEOUSLY THE SETTING SHALL BE AS PER FIG. 5<9. IN CASE THE APPROACH SIGNAL
IS PROVIDED SIMULTANEOUSLY THE SETTING SHALL BE AS PER FIG.No.4<8. IF STANDARD
SETTING FOR COLOR LIGHT SIGNAL CAN NOT BE ADOPTED DUE TO SITE CONDITIONS, SETTING
NOT LESS THAN THE MINIMUM SETTING REPRESENTED BY THE FULL LINES IN FIG.No. 6 TO 9
MAY BE ADOPTED.

4. THE EXTRA SETTING OF OHE MASTS INDICATED HERE IN ARE APPLICABLE FOR SIGNAL POST
HAVING ITS CENTER LINE AT 20844m FROM CENTER LINE OF ADJACENT TANGENT TRACK IN
ACCORDANCE WITH DRG.RDSO/S-30015. IN CASE THE CENTER LINE OF SIGNAL POST IS MORE
THAN 20844 m ON TANGENT TRACK OR THE SIGNAL IS ON THE CURVES,SETTING OF OHE MASTS
SHOULD BE DECIDED TAKING SITE CONDITIONS INTO CONSIDERATIONS WITHOUT IMPAIRING
SIGNAL VISIBILITY.

5. AS PER ADVANCE CORRECTION SLIP No.17 TO BG SCHEDULE OF DIMENSION (1973) ISSUED


VIDE RAILWAY BOARD RS LETTER 80/WDO/SD/10 DATED 03.06.2003 THE MINIMUM
SETTING DISTANCE, (IMPLANTATION) FOR TANGENT TRACK SHALL BE 2800 mm

DRAWING No. ETI/OHE/G/00112


APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 33

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 34

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

EXTRA ALLOWANCE FOR SETTING OF STRUCTURE ON CURVES


NOTES:
1. (a) THE STANDARD SETTING FOR MAST SUPPORTING SINGLE OHE:

(i) ON TANGENT TRACK --------------------------------------- 2900 mm

(ii) ON OUTSIDE CURVE OF RADIUS > 875 m --------------- 2900 mm

(iii) ON OUTSIDE CURVE OF RADIUS < 875 m --------------- 3050 mm

(b) THE STANDARD SETTING FOR MAST SUPPORTING SINGLE OHE ON INSIDE OF
CURVED TRACK:

(i) RADIUS > 3500 m --------------------------- 3200 mm

(ii) 3500 m > RADIUS > 2350 m --------------------------- 3350 mm

(iii) 2350 m > RADIUS > 1150 m --------------------------- 3550 mm

(iv) 1150 m > RADIUS > 300 m --------------------------- 3600 mm

(c) IN CASE OF PORTAL UPRIGHT, HEAD SPAN MAST, AND MAST CARRYING MORE THAN
ONE OHE, THE SETTING SHOULD NOT PREFERABLY BE LESS THAN 3000 mm ON
TANGENT TRACK (VIDE RLY. BOARD'S LETTER No. 80/ELEC.I/148/6 DATED : 28-4-81,
AS A GUIDE LINE ). WHILE ON CURVES, THE PREFERABLE SETTING SHOULD BE
INCREASED BY ADDING 500 mm WITH THE SETTING SPECIFIED
IN NOTE : 1(a) AND (b) ABOVE.

2. (a) FOR SETTING DISTANCE OF MASTS ON TRACK WHERE SPEEDS ARE NOT EXPECTED
TO BE MORE THAN 105 Km/Hr., MAY BE CALCULATED WITH THE HELP OF TABLE.:1

(b) MORE OVER IN EXCEPTIONAL SITUATION, SETTING DISTANCE OF MAST REDUCED


BY CURVE ALLOWANCE, CAN BE ADOPTED UP TO A MINIMUM OF 2.36 METERS. BUT
WHILE ADOPTING THE LOWER SETTING DISTANCE THAN THE STANDARD, AS SPECIFIED
IN NOTE:1 ABOVE, SPECIFIC APPROVAL OF THE CHIEF ELECTRICAL ENGINEER OF THE
RAILWAY CONCERNED SHALL BE OBTAINED.

(c) THE REDUCED SETTING DISTANCE THAN THE SPECIFIED STANDARDS SHALL
BE CALCULATED BY ADDING THE VALUES OF EXTRA ALLOWANCE SPECIFIED IN
COLUMN 4 & 5 OF THE TABLES 1 OR 2 (AS THE CASE MAY BE) WITH SLEWING
ALLOWANCE OF 150 mm

(d) AS PER AN ADVANCE CORRECTION SLIP No.17 TO B.G SCHEDULE OF DIMENSION


ISSUED VIDE RAILWAY BOARD'S LETTER No. 80/WDO/SD/10 DATED 03-06-2003,
THE MINIMUM STANDARD SETTING DISTANCE, (IMPLANTATION) FOR TANGENT TRACK
SHALL BE 2800 mm.

(e) WHERE THE STANDARD SETTING DISTANCE IS MORE THAN 3500 mm FOR MAST
(NOT PORTAL) THE ADOPTOR SHALL BE USED AS PER DRG No. ETI/OHE/D/3131

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 35

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CLEAR SPAN FOR ''N'' TYPE PORTAL

NE-1 NE-2 NB SPAN RANGE SPLICING GAP

SL. NO. 5.38 5.88 CENTRAL 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
(m) (m) PIECE (m) MAX MIN
STANDARD CLEAR SPANS OBTAINABLE

N-1 2 NIL NIL 10.11 9.86 9.91 9.96 10.01 10.06 10.11 NIL NIL NIL NIL

N-2 1 1 NIL 10.61 10.36 10.41 10.46 10.51 10.56 10.61 NIL NIL NIL NIL

N-3 NIL 2 NIL 11.11 10.86 10.91 10.96 11.01 11.06 11.11 NIL NIL NIL NIL

N-4 2 NIL 1.50 11.86 11.36 11.41 11.46 11.51 11.56 11.61 11.66 11.71 11.76 11.81

N-5 1 1 1.50 12.36 11.86 11.91 11.96 12.01 12.06 12.11 12.16 12.21 12.26 12.31

N-6 NIL 2 1.50 12.86 12.46 12.41 12.46 12.51 12.56 12.61 12.66 12.71 12.76 12.81

N-7 2 NIL 3.00 13.36 12.36 12.91 12.96 13.01 13.06 13.11 13.16 13.21 13.26 13.31

N-8 1 1 3.00 13.86 12.86 13.41 13.46 13.51 13.56 13.61 13.66 13.71 13.76 13.81

N-9 NIL 2 3.00 14.36 13.36 13.91 13.96 14.01 14.06 14.11 14.16 14.21 14.26 14.31

N-10 2 NIL 4.50 14.86 13.86 14.41 14.46 14.51 14.56 14.61 14.66 14.71 14.76 14.81

N-11 1 1 4.50 15.36 14.36 14.91 14.96 15.01 15.06 15.11 15.16 15.21 15.26 15.31

N-12 NIL 2 4.50 15.86 14.86 15.41 15.46 15.51 15.56 15.61 15.66 15.71 15.76 15.81

N-13 2 NIL 6.00 16.36 15.36 15.91 15.96 16.01 16.06 16.11 16.16 16.21 16.26 16.31

N-14 1 1 6.00 16.86 15.86 16.41 16.46 16.51 16.56 16.61 16.66 16.71 16.76 16.81

N-15 NIL 2 6.00 17.36 16.36 16.91 16.96 17.01 17.06 17.11 17.16 17.21 17.26 17.31

N-16 2 NIL 7.50 17.86 16.86 17.41 17.46 17.51 17.56 17.61 17.66 17.71 17.76 17.81

N-17 1 1 7.50 18.36 17.36 17.91 17.96 18.01 18.06 18.11 18.16 18.21 18.26 18.31

N-18 NIL 2 7.50 18.86 17.86 18.41 18.46 18.51 18.56 18.61 18.66 18.71 18.76 18.81

N-19 2 NIL 9.00 19.36 18.36 18.91 18.96 19.01 19.06 19.11 19.16 19.21 19.26 19.31

N-20 1 1 9.00 19.86 19.36 19.41 19.46 19.51 19.56 19.61 19.66 19.71 19.76 19.81

N-21 NIL 2 9.00 20.36 19.86 19.91 19.96 20.01 20.06 20.11 20.16 20.21 20.26 20.31

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 36

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CLEAR SPAN FOR ''O'' TYPE PORTAL

OE-1 OE-2 OB SPAN RANGE SPLICING GAP

SL. NO. 10.55 11.05 CENTRAL 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
(m) (m) PIECE (m) MAX MIN
STANDARD CLEAR SPANS OBTAINABLE

O-1 2 NIL NIL 20.25 20.00 20.05 20.10 20.15 20.20 20.25 NIL NIL NIL NIL

O-2 1 1 NIL 20.75 20.50 20.55 20.60 20.65 20.70 20.75 NIL NIL NIL NIL

O-3 NIL 2 NIL 21.25 21.00 21.05 21.10 21.15 21.20 21.25 NIL NIL NIL NIL

O-4 2 NIL 1.50 22.00 21.50 21.55 21.60 21.65 21.70 21.75 21.80 21.85 21.90 21.95

O-5 1 1 1.50 22.50 22.00 22.05 22.10 22.15 22.20 22.25 22.30 22.35 22.40 22.45

O-6 NIL 2 1.50 23.00 22.50 22.55 22.60 22.65 22.70 22.75 22.80 22.85 22.90 22.95

O-7 2 NIL 3.00 23.50 23.00 23.05 23.10 23.15 23.20 23.25 23.30 23.35 23.40 23.45

O-8 1 1 3.00 24.00 23.50 23.55 23.60 23.65 23.70 23.75 23.80 23.85 23.90 23.95

O-9 NIL 2 3.00 24.50 24.00 24.05 24.10 24.15 24.20 24.25 24.30 24.35 24.40 24.45

O-10 2 NIL 4.50 25.00 24.50 24.55 24.60 24.65 24.70 24.75 24.80 24.85 24.90 24.95

O-11 1 1 4.50 25.50 25.00 25.05 25.10 25.15 25.20 25.25 25.30 25.35 25.40 25.45

O-12 NIL 2 4.50 26.00 25.50 25.55 25.60 25.65 25.70 25.75 25.80 25.85 25.90 25.95

O-13 2 NIL 6.00 26.50 26.00 26.05 26.10 26.15 26.20 26.25 26.30 26.35 26.40 26.45

O-14 1 1 6.00 27.00 26.50 26.55 26.60 26.65 26.70 26.75 26.80 26.85 26.90 26.95

O-15 NIL 2 6.00 27.50 27.00 27.05 27.10 27.15 27.20 27.25 27.30 27.35 27.40 27.45

O-16 2 NIL 7.50 28.00 27.50 27.55 27.60 27.65 27.70 27.75 27.80 27.85 27.90 27.95

O-17 1 1 7.50 28.50 28.00 28.05 28.10 28.15 28.20 28.25 28.30 28.35 28.40 28.45

O-18 NIL 2 7.50 29.00 28.50 28.55 28.60 28.65 28.70 28.75 28.80 28.85 28.90 28.95

O-19 2 NIL 9.00 29.50 29.00 29.05 29.10 29.15 29.20 29.25 29.30 29.35 29.40 29.45

O-20 1 1 9.00 30.00 29.50 29.55 29.60 29.65 29.70 29.75 29.80 29.85 29.90 29.95

O-21 NIL 2 9.00 30.50 30.00 30.05 30.10 30.15 30.20 30.25 30.30 30.35 30.40 30.45

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 37

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CLEAR SPAN FOR ''R'' TYPE PORTAL

RE-1 RE-2 RB SPAN RANGE SPLICING GAP

SL. NO. 11.60 12.10 CENTRAL 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
(m) (m) PIECE (m) MAX MIN
STANDARD CLEAR SPANS OBTAINABLE

R-1 NIL 2 7.5 31.00 30.50 30.55 30.60 30.65 30.70 30.75 30.80 30.85 30.90 30.95

R-2 2 NIL 9.0 31.50 31.00 31.05 31.10 31.15 31.20 31.25 31.30 31.35 31.40 31.45

R-3 1 1 9.0 32.00 31.50 31.55 31.60 31.65 31.70 31.75 31.80 31.85 31.90 31.95

R-4 NIL 2 9.0 32.50 32.00 32.05 32.10 32.15 32.20 32.25 32.30 32.35 32.40 32.45

R-5 2 NIL 10.50 33.00 32.50 32.55 32.60 32.65 32.70 32.75 32.80 32.85 32.90 32.95

R-6 1 1 10.50 33.50 33.00 33.05 33.10 33.15 33.20 33.25 33.30 33.35 33.40 33.45

R-7 NIL 2 10.50 34.00 33.50 33.55 3360 33.65 33.70 33.75 33.80 33.85 33.90 33.95

R-8 2 NIL 12.00 34.50 34.00 34.05 34.10 34.15 34.20 34.25 34.30 34.35 34.40 34.45

R-9 1 1 12.00 35.00 34.50 34.55 34.60 34.65 34.70 34.75 34.80 34.85 34.90 34.95

R-10 NIL 2 12.00 35.50 35.00 35.05 35.10 35.15 35.20 35.25 35.30 35.35 35.40 35.45

R-11 1 1 13.00 36.00 35.50 35.55 35.60 35.65 35.70 35.75 35.80 35.85 35.90 35.95

NOTE:
1. THIS TYPE OF PORTAL SHOULD NOT BE USED FOR MORE THAN 8 TRACKS & CLEAR SPAN NOT EXCEEDING 36.0m.
2. THE POTAL HAS BEEN DESIGNED TO CARRY MULTIPLE OHE'S OF 8 TRACKS ALONG WITH THEIR RETURN CONDUCTOR & ANCHORGE ON
UPRIGHT WITH SUITABLE GUYS.

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP


SHEET No.: 38

GUPTA POWER SECTION: TAR-KAV

DATE : 05-07-2021

CLEAR SPAN FOR ''B'' TYPE PORTAL

BFBE-1 BFBE-2 SPAN RANGE SPLICING GAP

SL. NO. 8.50 9.00 CENTRAL 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
(m) (m) PIECE (m) MAX MIN
STANDARD CLEAR SPANS OBTAINABLE

BFB-1 2 NIL NIL 17.25 17.00 17.05 17.10 17.15 17.20 17.25 NIL NIL NIL NIL

BFB-2 1 1 NIL 17.75 17.50 17.55 17.60 17.65 17.70 17.75 NIL NIL NIL NIL

BFB-3 NIL 2 NIL 18.25 18.00 18.05 18.10 18.15 18.20 18.25 NIL NIL NIL NIL

BFB-4 2 NIL 1.50 19.00 18.50 18.55 18.60 18.65 18.70 18.75 18.80 18.85 18.90 18.95

BFB-5 1 1 1.50 19.50 19.00 19.05 19.10 19.15 19.20 19.25 19.30 19.35 19.40 19.45

BFB-6 NIL 2 1.50 20.00 19.50 19.55 19.60 19.65 19.70 19.75 19.80 19.85 19.90 19.95

BFB-7 2 NIL 3.00 20.50 20.00 20.05 20.10 20.15 20.20 20.25 20.30 20.35 20.40 20.45

BFB-8 1 1 3.00 21.00 20.50 20.55 20.60 20.65 20.70 20.75 20.80 20.85 20.90 20.95

BFB-9 NIL 2 3.00 21.50 21.00 21.05 21.10 21.15 21.20 21.25 21.30 21.35 21.40 21.45

BFB-10 2 NIL 4.50 22.00 21.50 21.55 21.60 21.65 21.70 21.75 21.80 21.85 21.90 21.95

BFB-11 1 1 4.50 22.50 22.00 22.05 22.10 22.15 22.20 22.25 22.30 22.35 22.40 22.45

BFB-12 NIL 2 4.50 23.00 22.50 22.55 22.60 22.65 22.70 22.75 22.80 22.85 22.90 22.95

BFB-13 2 NIL 6.00 23.50 23.00 23.05 23.10 23.15 23.20 23.25 23.30 23.35 23.40 23.45

BFB-14 1 1 6.00 24.00 23.50 23.55 23.60 23.65 23.70 23.75 23.80 23.85 23.90 23.95

BFB-15 NIL 2 6.00 24.50 24.00 24.05 24.10 24.15 24.20 24.25 24.30 24.35 24.40 24.45

APPROVED IN PRINCIPLE

FOR GUPTA POWER DY.CEE/CON/SECR/NGP