AMP Schedule for the month of October Month

Sl No Division PSS Name Date Work Description


1 KED-I Aul 9/28/2021 AB Switch installation & AMP
2 KED-I Adhajori 10/1/2021 AB Switch installation

04-10-2021 Station Transformer


3 KED-I Chhata
20-10-2021 Charge,AMP & PT installation.

4 KED-I Danpur 10/5/2021 AMP


5 KED-I Rajnagar 10/7/2021 AB Switch installation & AMP
6 KED-I Chagharia 10/8/2021 AMP
7 KED-I Kendrapara 10/9/2021 AMP
8 KED-I Indupur 10/11/2021 AB Switch installation & AMP
9 KED-I Rajkanika 10/16/2021 AMP