PROPOSED TERMS OF REFERENCE

FOR

PROPOSED RESIDENTIAL DEVELOPMENT


AT

SY. NOS. 97, 98, 99/2, 100/1, 100/2, 100/3, 101/1, 101/2,
101/3, 104, 105/1, 106, 108, 109/2, 129/1, 130/1, 130/2,
124, 141/1, 141/2, 142/1, 142/2A1, 142/2A2, 142/2B,
GATTAHALLI VILLAGE,
SARJAPURA HOBLI, ANEKAL TALUK, BENGALURU.

PROMOTER
M/s. AKARSHAK REALTY PVT LTD,
BENGALURU

PREPARED BY
M. D. SANJAY KUMAR
C/o. M/s. A&N TECHNOLOGIES
# 855, 3RD FLOOR, 6TH MAIN,
BEHIND RAGI GUDDA, J P NAGAR 2ND PHASE,
BENGALURU-560 078
PH: (080) 41209283
~~~~~*****~~~~~

1
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

1. INTRODUCTION
1.1 PREAMBLE
Environmental protection and sustainable development have been the cornerstones of
the policies and procedures governing the industrial and other developmental activities in
India. Ministry of Environment, Forests & Climate Change has taken several policy initiatives
and enacted environmental and pollution control legislations to prevent indiscriminate
exploitation of natural resources and to promote integration of environmental concerns in
developmental projects; one such initiative is the Notification on Environmental Impact
Assessment (EIA) of developmental projects issued on 27.1.1994 under the provisions of
Environment (Protection) Act, 1986, amended on 07.07.2004 & included for certain criteria’s of
construction projects including new townships, settlement colonies, commercial complexes,
hospitals and office complexes to obtain environmental clearance. Further this notification was
amended as Environmental Impact Assessment Notification S.O.1533 (E) of 14th September
2006 and as amended Notification S.O.3067 (E) dated 1st December 2009 and further amended
Notification No. SO.3999 (E) dated 9th December 2016 making mandatory for specified
categories of developmental projects to obtain Environmental Clearance.
TOR has been prepared as per EIA GUIDANCE MANUAL for Building, Construction,
Township and Area Developmental Projects prepared by Administrative Staff College of India,
Hyderabad dated February 2010 and Standard Terms of Reference (TOR) for EIA & EMP report
for projects/activities requiring Environmental Clearance under EIA notification 2006 released
by Ministry of Environment, Forests & Climate Change, April 2015.

Page 2
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

TABLE: DETAILS OF PROJECT PROPONENT


SL. NO. DESCRIPTION DETAILS
1. Name & contact address M/s. Akarshak Realty Pvt Ltd,
No. 10, Vittal Mallya Road,
Bengaluru – 560 001.
Tel: +91 80 4134 3340
Fax No.: +91 80 4134 3777
e-mail: p.krishnamurthy12@gmail.com
Implementing
2. M/s. Akarshak Realty Pvt Ltd
Organization
3. Project Consultants Enclosed as Annexure - 1

ANNEXURE - 1
PROJECT CONSULTANTS
SL. NO. DESCRIPTION DETAILS
M/s. A & N Technologies,
1. Environmental
Bengaluru
M/s. Adarsh Developers,
2. Architect
Bengaluru
M/s. Adarsh Developers,
3. PHE & Fire
Bengaluru
M/s. Adarsh Developers,
4. Electrical
Bengaluru
M/s. Adarsh Developers,
5. Structural
Bengaluru
M/s. Adarsh Developers,
6. Landscape
Bengaluru
M/s. Consortia of Infrastructure Engineers,
7. Traffic
Bengaluru

Page 3
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

1.2 LAND DESCRIPTION


As per Bengaluru Development Authority (BDA), Revised Master Plan – 2015, the
proposed project site is designated as Residential Main Zone and Sensitive Zone. The land has
been converted from agricultural to Residential purpose and sensitive zone clearance has been
obtained.

APPLICABLE REGULATIONS AND STANDARDS


The proposed project site comes under Bengaluru Development Authority (BDA). With
respect to prevention and control of environmental pollution, the proposed project is governed
by the following Acts and Rules of MoEFCC.
 Water (Prevention and control of Pollution) Act, 1974 as amended in 1988.
 Air (Prevention and control of Pollution) Act, 1981 as amended in 1987.
 Environmental (Protection) Act, 1986 amended 1991 and Environmental (Protection)
Rules, 1986 and amendments thereafter;
 Hazardous Waste (Management & Handling) Rules 1989 (latest amendment 2008 and
2016).
 The Noise Pollution (Regulation & Control) Rules, 2000 and as amended in 2002, 2006
and 2010.
 Municipal Solid Waste (Management and Handling) Rules, 2000 and as amended in 2016.
 The EIA notification, dated 07.07.2004 as amend in 14.09.2006, 19.01.2009, 01.12.2009,
22.12.2014.

Stating that for any project or activity specified in category ‘B’ in the item 8(b) of schedule
i.e. building/construction projects/area development projects and townships crossing the built
up area of 1, 50,000 Sqmt, TOR should be conveyed to SEIAA, based on the approved TOR, EIA
studies should be conducted which also includes an Environmental Management Plan for the
mitigation of these impacts.

Page 4
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

1.3 LITIGATION PENDING AGAINST THE PROPOSED PROJECT


There are no litigations, directions or orders passed by any court of law for the project.

2. PROJECT DESCRIPTION
2.1 GOAL AND OBJECTIVES
 Providing a broad spectrum of integrated solutions.
 Meeting and exceeding customer needs and expectations.
 Adopting the latest technologies to deliver state-of-the-art developments with great
care and detailing.
 Ensuring conservation and development of eco-friendly projects.
 Making continuous improvement in all areas of activity based on customer inputs in
order to improve customer satisfaction.
 Contributing to the welfare of society.

2.2 DESCRIPTION OF THE PROPOSED PROJECT


In an effort to fulfill the increasing demand for dwelling units, the promoter “Akarshak
Realty Pvt Ltd” came into being with the sole aim of providing quality residential apartments
for the people of different strata. One of such projects, envisioned by M/s. Akarshak Realty Pvt
Ltd is being proposed to develop residential apartments at Sy. Nos. 97, 98, 99/2, 100/1, 100/2,
100/3, 101/1, 101/2, 101/3, 104, 105/1, 106, 108, 109/2, 129/1, 130/1, 130/2, 124, 141/1,
141/2, 142/1, 142/2A1, 142/2A2, 142/2B, Gattahalli Village, Sarjapura Hobli, Anekal Taluk,
Bengaluru encompassing an area of 1,28,082 Sqmt (31 Acres 26 Guntas).
The project comprises of 2,777 Nos. of apartments and 278 Nos. of EWS units in 25
Towers. Hence the total numbers of units are 3,055 Nos. The project is sprawled across
2B+G+29UF for Towers 1-16 with a maximum height of 93.60m & 2B+G+30UF for Towers 17-
25 with a maximum height of 96.70m.

Page 5
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

2.2.1 BASIC INFORMATION


1. Project Type Residential Development
2. Total Site Area 1,28,082 Sqmt (31 Acres 26 Guntas)
3. Total Built up Area 5,67,998.20 Sqmt
4. Total Ground coverage Area 14,333.00 Sqmt (12.07%)
5. Total Landscape Area 72,847.91 Sqmt (61.36%)
6. Max. Height of the Building 96.70 m
7. Total No. of units 2,777 Nos. of apartments and 278 Nos. of EWS
units in 25 Towers. Hence the total numbers of
units are 3,055 Nos.
8. Total Number of contributing 17,451 Nos. of occupants from the residential
population apartments and EWS Units.
9. Source of water & requirement Source: Borewells
Total water requirement: 2,382 KLD
For Domestic Purposes: 1,588 KLD
For Flushing: 794 KLD
10. Source of power & requirement Source: BESCOM
Power requirement – 20,000 kVA
Transformers capacity – 990 kVA X 20 Nos.
DG sets capacity – 1,010 kVA X 10 Nos.
11. Transportation Connectivity Carmelaram Railway Station, which is around 6.0
km from the project site.
Bengaluru City Railway Station, which is around
22.5 km from the project site.
Nearest Airport:
Kempegowda International Airport is around
53 km from project site.
12. Parking Requirements Required number of car parks: 3,208 Nos.
Provided number of car parks: 3,500 Nos.
13. Type of building material to be Energy efficient/alternative building materials will
used be used.
14. Environmental Liability of the site There are no such environmental liabilities
towards the proposed project.
15. Existing structure / Type of There is no any existing structure.
material – Demolition debris etc

Page 6
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

2.3 SITE SELECTION


Environmental impacts of construction and operation are established during the early
phases of site selection and planning. Site selection, planning and design form an important
stage in the development of the project and will determine their environmental impacts
throughout the construction & operation stage of the proposed project.
Following procedures are considered during site selection:
 From the project there should not be any negative impact to the existing bio
diversity & ecosystems of the site.
 From the project there should not be any disturbance to the heritage & cultural
values such as protected monuments.
 Geographical latitude and microclimatic factors such as wind loads & solar access
will be assessed.
 Natural topography & landscape will be given clearly.
 Based on the infrastructure & utilities available the site is selected.
 Site is selected in light of a holistic perspective of land use, development intensity,
social well-being and preservation of the environment.
 Proposed land use will conform to the approved Master Plan/ Development plan
of the area. If there is no approved plan, consent from appropriate authority will
be taken & will be submitted for Environmental Clearance.

2.4 MAN POWER REQUIREMENT


The list of manpower requirements for the proposed project is given in the below table
format.

Page 7
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

TABLE: MAN POWER REQUIREMENT


SL. NO. MAN POWER NOS.
1. Project Manager 5
2. Safety Officer 8
3. Senior Engineer (Planning/ QS) 8
4. Senior Engineer (Execution) 10
5. Engineer / AE / JE (Execution) 15
6. Supervisor 18
7. Stores Officer 10
8. Stores Assistant 12
9. Asst Admin & Accounts 4
10. Masons 15
11. Labors 2,200
12. Electricians 18
13. Electrician Helpers 25
14. Plumber 18
15. Plumber Helpers 15
16. Carpenters 15
17. Carpenter Helpers 20
18. Tile Fitters 40
19. Tile Fitting Helpers 60
20. Miscellaneous 25
21. Painters 15
22. Painting Helpers 20

2.5 PROJECT IMPLEMENTATION SCHEDULE


The details of project implementation schedule will be included in the EIA report.

Page 8
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

AERIAL VIEW COVERING 500 m RADIUS

Towards
Choodasandra

Project Site

Avalahalli

Gattahalli

Towards
Huskur
Latitude: 12°52’33.45” N

Longitude: 77°42’10.52” E

Page 9
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

TOPO MAP COVERING 10 km RADIUS

Project Site

10 km

Scale:
1cm: 0.5km Topo Map No:
20cm: 10km 57H/9, 57H/13

Page 10
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

3. ENVIRONMENTAL DATA
3.1 INTRODUCTION
This section includes the following subsections for each environmental parameter.
a) Anticipated impacts
b) Relevant mitigation measures
This study will be carried out for the following different Environmental facets in relation
to building construction:
a) Land
b) Water (Ground & Surface)
c) Air
d) Noise
e) Biological
f) Socio-Economic

3.1.1 STUDY AREA & PERIOD


The study area considered for the proposed project is an area covering 10 km radius,
with project site as center.
Primary data i.e., baseline data will be monitored for one season excluding rainy season.
Secondary data will be collected for three months. Monitoring of the parameters will be carried
out as per CPCB guidelines within the study area.
3.1.2 BASELINE STUDY
The existing environmental setting will be considered to establish the baseline
conditions which are described with respect to climatic conditions, air quality, water quality,
soil characteristics, ecology, socio-economic profile, land use and noise. Baseline data describes
the existing environmental status of the identified study area with reference to the prominent
environmental attributes. Hence baseline environmental status is the most important study

Page 11
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

based on which probable impacts from the proposed project can be predicted. Hence, it is
necessary to ascertain the baseline data of the above mentioned environmental facets.

3.2 LAND ENVIRONMENT


The first feature which influence the development of a project is the existing land use
pattern of the neighborhood of the project, whether the proposed development conforms to the
development for that area or not.
The detail study of the land environment will include the following study areas.

 Study of land use pattern, habitation, cropping pattern, forest cover, environmental
sensitive places etc, employing remote sensing techniques (if available) and ground
truth and also secondary data sources.
 Study about trend of change in land use pattern, if any, with reasons thereof for the last
10 years based on remote sensing techniques data and its extrapolation to future 10
years with and without the project.

3.2.1 LAND USE PATTERN


The use of land is determined both by physical factors such as topography, climate, and
soil types as well as human factors such as population density, technological capability, culture &
tradition etc. Land use has a major impact on natural resources including ware, soil, nutrients,
plants and animals.
“Land Use” in the urban planning context means the use to which zones of land are put to.
It could be residential, commercial, industrial, parks and open space, playground, traffic and
transportation etc. The use to which land should be put to must be optional. This can be done
only if the existing land use is estimated.

Page 12
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

Existing Land use:


The proposed land use designated in the Revised Master Plan (RMP) – 2015 of BDA
(Bengaluru Development Authority) for Sarjapura Hobli, Anekal Taluk, is shown in the Fig - 3.
It is observed from the Revised Master Plan (RMP) - 2015 of BDA, {3.19 Electronic City}
the proposed project site is designated as Residential Main Zone and Sensitive Zone. The land
has been converted from agricultural to Residential purpose and sensitive zone clearance has
been obtained. The overall land use pattern planned for the Planning District 3.19 Electronic City
for the planning year 2015 is as enumerated in the following table.
Proposed Land Use Analysis as per RMP -2015
Area in % of Total
Land Use Hectare
408.47 16.52
Residential(Main)
21.60 0.87
Residential(Mixed)
-- --
Commercial (Central)
-- --
Commercial (Business)
17.09 0.69
Mutation Corridor
-- --
Commercial Axes
132.14 5.34
Industrial
1,461.28 59.08
High Tech
24.52 0.99
Public and Semi Public
160.12 6.47
Green (Parks & open Spaces)
242.30 9.80
Traffic & Transportation
5.75 0.23
Public utilities
-- --
Unclassified

Total 2,473.27 100.00

Page 13
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

FIG- 3: REVISED MASTER PLAN – 2015


(PROPOSED LANDUSE MAP 3.19 ELECTRONIC CITY)

Project
Site

Page 14
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

3.2.2. GEOLOGICAL SETTINGS


The geological settings of the entire Anekal Taluk will be described under this section in
the EIA report.

3.2.3 PHYSICO- CHEMICAL CHARACTERISTICS OF THE SOIL


The soil sample from the proposed project site will be collected and analyzed; it will be
detailed out in the EIA report.

3.2.4 GROUND WATER TABLE


The detail study of the ground water table will be carried out for the study area and it
will be detailed out in the EIA report. This includes the study of depth of the ground water table,
yield of the open wells as well as bore wells, details of surface run off, evapo-transpiration and
the ground water recharge through rain fall.

3.2.5 ANTICIPATED IMPACTS


The expected impacts on the land environment during construction & operation phase
are as follows which will be studied in detail in the EIA report.
 Disturbance to soil substrata during site preparation.
 Anticipated impacts on the surrounding land use pattern.
 Impact on fertility status of the soil.
 Impact on the natural drainage system.

3.2.6 MITIGATION MEASURES


Following mitigation measures will be undertaken in order to avoid the anticipated
impacts on the land environment.
 Proper management of excavated soil.
 Landscape development within the project site.
 Natural drainage system will not be disturbed and it will be maintained in proper
manner.

Page 15
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

3.3 WATER ENVIRONMENT


Information on both ground and surface water resources will be collected and assessed
during the study period. These water resources will be analyzed for Physico-chemical quality,
nutrients, Heavy metals and for micro-biological parameters. Information on total water
requirement and sources of wastewater has been collected. The data on quantity and
anticipated characteristics of wastewater for the proposed project has also been collected.

3.3.1 ANTICIPATED IMPACTS


There will be anticipated impacts on the surrounding water environment during both
the construction and operation stage of the proposed project. Following are the some of the
anticipated impacts on the surrounding water environment due to the proposed project.
 Impacts on nearby water sources.
 Impact on exploitation of surface/ ground water.
 Wastewater generation.

3.3.2 MITIGATION MEASURES


Following are the some of the mitigating measures to minimize the pollution level.
 Proper measures to avoid the runoff from the construction activities.
 Water conservation within the buildings.
 Rainwater harvesting to maintain the water level - Construction of water
harvesting structures.
 Reuse of STP treated water for flushing, gardening, etc.
 Water conservation in landscape.
 Measures for mitigation of wastewater generation.

Page 16
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

3.4 AIR ENVIRONMENT


The ambient air quality analysis for the study area will be conducted for all the
parameters specified in the National Ambient Air Quality Standards, Central Pollution Control
Board Notification, New Delhi dated 18th November, 2009.

3.4.1 AMBIENT AIR QUALITY STATUS


The prime objective of the base line air quality survey is to assess the existing air quality
of the study area, which has been compared with the NAAQS.
The ambient air quality analysis for the study area will be conducted for all the
parameters specified in the National Ambient Air Quality Standards, Central Pollution Control
Board Notification, New Delhi, and 18th November, 2009.

3.4.2 ANTICIPATED IMPACTS


There will be anticipated impacts on the surrounding air environment during both the
construction and operation stage of the project. The immediate surroundings will have a
greater impact.
The anticipated impacts on air environment will be mainly due to
 Point source emissions.
 Dust emissions during site preparation.
 Air emissions from the construction vehicles.
 Air emissions from the increase in traffic during the operation stage of the project.

3.4.3 MITIGATION MEASURES


Mitigation measures are to be proposed during the construction stage as well as the
operational stage of the project. Some of the proposed measures will include;
 Mitigation measures to lower the emissions during loading, un-loading,
transportation and storage of construction materials.

Page 17
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

 Mitigation measures to lower the point source emissions.


 Mitigation measures to lower the emissions from automobile.
 Use of public mode of transportation should be promoted.
 Landscape development.

3.5 NOISE ENVIRONMENT


Noise levels will be monitored for the study area in order to establish base line status.
The anticipated noise sources from the proposed project are mainly due to generators,
construction equipments, pumps and due to vehicular movement. Sound pressure levels of
these identified sources will be collected and their cumulative impact on the noise environment
will be determined and proper mitigation measures will be adopted.

3.5.1 ANTICIPATED IMPACTS


There will be anticipated impacts on the surrounding Noise environment during both
the construction and operation stage of the proposed project. Following are the some of the
predicted impacts on the Noise environment, which will be discussed in detail in the EIA report.
 Impacts due to construction equipments.
 Impacts due to vehicular movements.
 Impacts due to the usage of DG sets.

3.5.2 MITIGATION MEASURES


 Use of noise absorbing materials in the design of building.
 Use of noise barriers for point sources.
 Proper maintenance of construction equipments and machinery.
 Proper maintenance of automobiles.
 Control over vibrations.
 Landscape development.

Page 18
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

3.6 BIOLOGICAL ENVIRONMENT


This section mainly includes the detail study of the existing Flora and Fauna of the study
area. This part mainly comprises of the study of existing types of species, densities of species &
their distributions, rare and endangered species, commercially valued species etc. With the help
of this detail study, the impact of the proposed project on the biological environment will be
predicted and the proper mitigation measures will be adopted.

3.6.1 ANTICIPATED IMPACTS


The proposed project site consists of eucalyptus trees which will be cleared during site
formation. However a beautiful landscape will be developed where native species of trees will be
planted.

3.7 SOCIO-ECONOMIC ENVIRONMENT


Data on the demographic pattern, population density, educational facilities, medical
facilities, agriculture income, fuel, health status, transport and recreational facilities will be
collected and it will be analyzed for all the villages of the study area which will be depicted in
detail in the EIA report.

3.7.1 ANTICIPATED IMPACTS


There will be anticipated impacts on the surrounding Socio-Economic Environment
during both the construction and operation stage of the proposed project. Following are the
some of the predicted impacts on the Socio-Economic Environment, which will be discussed in
detail in the EIA report.
 Impact on local employment.
 Impact on population.
 Impact on Archaeological heritage if any.
 Impact on health, educational and recreational facilities

Page 19
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

3.7.2 MITIGATION MEASURES


Proper mitigation measures and compensation will be given if there would be any
implication on the Socio-Economic environment due to the proposed project activities.

3.8 SOLID WASTE MANAGEMENT


Solid wastes from construction sector can be categorized into two phase i.e., during
construction & during operation, which includes construction & demolition wastes, municipal
wastes, Hazardous and E - wastes generated from the proposed project. The quantity of solid
wastes generated and their management is projected in detail in the Form 1 & 1A report.

3.8.1 ANTICIPATED IMPACTS


There would be anticipated impacts on the surrounding environment due to the solid
wastes generated from the proposed project. Following are the some of the expected impacts
due to the proposed project.
 Emissions from the wastes.
 Insufficient collection and segregation.
 Lack of onsite treatment.
 Difficult quantification.
 Top soil erosion.
 Impacts on human health.

3.8.2 MITIGATION MEASURES


 Good practices in construction & demolition waste management.
 Proper municipal waste management will be followed. Organic waste converter will
be proposed within the project site in order to process the generated organic waste.
 Proper Hazardous and E- waste management.

Page 20
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

STANDARDS:
The latest amended standards specified by CPCB for air, noise and water quality will be
considered for the study of environmental data within the study area, which are applicable for
this category of development. The proponents will consider these standards in order to ensure
that project activities are compliant to the standards.

4. SPECIFIC STUDIES
4.1 BUILDING MATERIAL AND TECHNOLOGIES
Energy efficient/ alternative Building materials and technologies will be used for the
proposed project, which will reduce the total embodied energy of the building materials
required for the construction. The details of the low embodied building materials and
technologies used in the project will be detailed in EIA report.

4.2 ENERGY CONSERVATION


Proponents will adopt energy conservation measures, which includes the following
methods.
 Use of non-conventional energy (Solar energy).
 Maximum use of local resources and skill.
 Reduce transportation.
 Use of Energy efficient devices.
TRAFFIC MANAGEMENT
A traffic survey will be conducted before construction, during construction & after
construction. In order to gather the information about the existing traffic load in the project
vicinity. This section will include the following traffic studies.
 Traffic volume during construction phase.
 Traffic volume during operation phase.
 Present & future traffic volume.
 General Traffic Management measures.

Page 21
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

ENVIRONMENTAL MONITORING PROGRAM


The Environmental monitoring for the proposed project will be taken up for the below
parameters and it will be scheduled as given in the below table. This monitoring program will
be conducted within the project site, which will be detail out in the EIA report.

TABLE: MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS


Important
Monitoring Duration of
Sl. No. Particulars parameters for
frequency monitoring
monitoring
I. Air Quality
1. Ambient Air monitoring
Project premises Once in 3 months 24 hourly PM2.5, PM10, SO2, NO2
sample
2. Stack Monitoring Once in 3 months Grab SO2 , SPM, NO2, HC, CO
II Water and Wastewater Quality
1. Water Quality
i. Ground water at project Once in 3 months Grab As per IS 10500 –
site/nearby project site 2012 Specification
2. Waste water quality
i. Inlet to STP Once in a month Composite --
ii. Treated effluent prior to Once in a month Composite As per KSPCB urban
discharge reuse standards
III Soil Quality
1. Within project premises at 1 Once in 3 months Composite --
location on effluent Sample
discharging area / land
2. Ecological preservation and Seasonal Visual Survival rate
up-gradation observations
IV Noise Monitoring
1. Project premises Once in 3 months Day and Ambient Noise
Night Standards.

Page 22
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

5. ADDITIONAL STUDIES
5.1 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN (DMP)
The Risk Assessment and DMP planned for the proposed project is as given
below.

Risk and Disaster Management Plan


Disaster is an unexpected event due sudden failure of the system, external threats,
internal disturbances, earth quakes, fire and accidents. Thus an appropriate management plan
shall be incorporated.

Precautions
 Once the likelihood of the disaster is suspected, preventive actions should be
undertaken by the project in-charge.
 Conditional maintenance of equipments, materials and expertise for use during
emergency.
 The electrical systems shall be provided with automatic circuit breakers activated by
over current.
 Fire extinguishers are provided at pre-notified locations inside the buildings.
 Proper escape routes are planned and displayed in the public domain.
 Selected representatives are given proper training to guide others during fire
accidents.
 Periodic awareness programme is conducted for the occupants on their roles during
emergency situations.
Important telephone numbers like police authorities, fire department and hospitals etc.
of use during emergency situations will be made available.

Page 23
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

5.2 NATURAL RESOURCE CONSERVATION


Energy conservative materials will be used in the construction. The excavated earth will
be managed properly and also water conservative methods will be adopted during the
construction phase of the project. The detail of this will be given in the EIA report.
During operation stage of the project also many natural resource conservation
techniques will be followed such as rain water harvesting facilities, use of non- convention
energy sources, reuse of STP treated water etc. This will be discussed in detail in the EIA report.

6. PROJECT BENEFITS
The proposed project is a residential development project. Due to the development of
the proposed project, there will be improvement on both the existing physical and social
infrastructure of the project surroundings. These benefits will be highlighted in the EIA report.

7. ENVIRONMENTAL MANAGEMENT PLAN


The detailed EMP will be formulated to mitigate the residual impacts arises due to the
development of the proposed project. Budgeting of the EMP will be included in the EIA report.
In the EIA report, the planned EMP of the proposed project will include the following
aspects of discussion in detail.
 Sewage treatment Plant (STP) of appropriate capacity will be designed for the
wastewater generated from the proposed project and the wastewater will be treated
to the tertiary level and after the treatment it will be reused for flushing of toilets,
gardening etc.
 The treated sewage from the STP would be conforming to the stipulated standards.
 The spent oil from the DG sets will be stored in High Density Polyethylene (HDPE)
drums in isolated covered facility and disposed off as per the Hazardous Waste

Page 24
A & N Technologies, Bengaluru
M/s. AKARSHAK REALTY PVT LTD
PROPOSED RESIDENTIAL DEVELOPMENT PROPOSED
AT GATTAHALLI VILLAGE, TERMS OF
SARJAPURA HOBLI, REFERENCE
ANEKAL TALUK, BENGALURU.

(Management & Handling) Rules 1989 (latest amendment 2008 and 2016). Spent oil
from DG sets will be disposed off through registered recyclers only.
 Provision of effective controls and building management systems such as automatic
fire alarm and fire detection and suppression system etc.,

8. SUMMARY AND CONCLUSION


After the detailed EIA study of the proposed project, the summary of the EIA study will
be highlighted in this section. With the help of this summary, final conclusion of the proposed
EIA study will be given.
The summary of the EIA study will include the following topics if applicable,

 Potential interruption or limitation of accesses to dwellings, businesses or


productive resources either permanently or temporarily;
 Potential deterioration of urban quality and property and property value in the
immediate vicinity of the works;
 Over all implementation and impacts of the project on the surrounding environment
during both construction & operation phase;
 The mitigation measures those are adapted, in order to minimize the potential
impacts on the environment due to the proposed project.

DISCLOSURE OF CONSULTANT ENGAGED


The names and nature of consultancy teamed for the proposed project is mentioned in
the Annexure- 1.

ENCLOSURES:
CONCEPTUAL PLAN / QUESTIONNAIRE / PHOTOS
The necessary Conceptual plan / Questionnaire / Photos are enclosed in the preceding
section.