Professional Documents
Culture Documents
ESR is the largest Asia-Pacific focused logistics real estate platform by gross floor area (GFA)
and by value of the assets owned directly and by the funds and investment vehicles it manages.
ESR and its funds and investment vehicles are backed by some of the world’s preeminent
investors including APG, SK Holdings, JD.com, Goldman Sachs, CPPIB, OMERS and Ping An.
The ESR platform spans across the People’s Republic of China, Japan, South Korea, Singapore,
Vietnam, Indonesia, Australia and India.
ESR has been listed on the Main Board of The Stock Exchange of Hong Kong Limited since
1 November 2019.
ACCESS DELIVERY
Proximity to key BTS buildings to be delivered as
consumption bases of per design.
Delhi, NCR, UP & Haryana. Standard buildings can be
delivered between 10-12 months.
CONNECTIVITY QUALITY
ADVANTAGE Grade 'A' rated green buildings.
Excellent connectivity IGBC Gold rated building.
to National & State Highways.
PEOPLE POWER
Availability of Labour
& Proximity to Urbanisation
cluster of Gurugram & Faridabad.
NH-8 NH-2
Delhi International
Gurugram Airport
Faridabad
CENTRALLY LOCATED
Sohn
a-G
IMT Manesar Sohna Chowk : 12 kms
ur ug
Gurugram : 28 kms
ad
ram
Ro
na
Faridabad : 38 kms
Ro
oh
ad
-S
Panchgaon Pa Noida : 52 kms
rh
Mo nch Ballabhgarh
ga
ha ga
bh
m on Connaught Place : 53 kms
Bilaspur m
lla
ad -
Ba
pu
KM
rR Greater Noida : 72 kms
oa Sohna
PE
d
Ta
Chowk
xp
u
Dharuhera
ss
Ro
Prithla
wa
ad
National Highways
KMP Expressway
Google Coordinates
District Roads
Toll Plaza
NH NH
9 34
NH
9
75 KM Ghaziabad
60 KM Karol Bagh
Chandni Chowk 60 KM
Connaught
Place
53 KM LOCATION ADVANTAGE
Janakpuri 62.5 KM NH
34
Khan Market 50 KM
Poised to be one of the largest in the region, this park will support last-mile delivery for
Dwarka 50 KM
Noida City 50 KM national and global businesses with access to quality housing, retail malls, medical,
48.9 KM Lajpat Nagar Centre UTTAR
NH
PRADESH
educational facilities and a large talent pool.
44
Hauz Khas 54 KM
Okhla 48 KM
SERVICES WORKFORCE
NH
236 HP Petrol Pump - 1.5 kms Casual labour 3-10 kms from the site,
Service Station - 12 kms Executives can be Deployed from Gurugram,
DLF Cyber City 38 KM
NH
48
Gurugram Faridabad, Noida and Delhi region.
Nimot Mod Bus Station - 1 km
Greater Noida 70 KM
Huda City 32 KM
Center,
Market HOSPITALS SCHOOLS
Vardhaan Hospital & Trauma Centre - 50 beds Asian Public School Gurugram
GURUGRAM
Civil Hospital - Reburnishing to 200 beds Vedas School
Faridabad 30 KM 10-12 kms World Institute of Technology
NH
19
NH
248
Ballabgarh 22 KM
Main Market
HARYANA
SOHNA
NH-
Western Peripheral Eastern Peripheral
CONNECTIVITY ADVANTAGE
1
Expressway Sonipat Expressway
The Single Loop (KMP Western Peripheral & KGP Eastern Peripheral) connects all major highways
NH
Narela - NH-8, NH-1, NH-24, NH-10, NH-1.
-10
ESR location is ideally located in the center between NH-8 & NH-1.
DELHI
NH-8 connects the western corridor connecting Delhi to the financial capital Mumbai, through
NH-24
Gurgaon, Jaipur, Ajmer, Udaipur, Gandhinagar, Ahmedabad, Vadodara and Surat.
NH-2 Stretches 1,465 kms from Delhi to the eastedrn corridor to Kolkata, passes through
Dwarka important cities like Faridabad, Mathura, Agra, Kanpur, Allahabad, Varanasi, Dhanbadand, Asansol.
Najafagarh
Saket NOIDA
Upcoming Gurugram Mumbai Expressway is 10 kms distance away from ESR Sohna.
The route for this expressway will be Delhi - Gurugram - Mewat - Kota - Ratlam - Godhra -
NH-2
Vadodara - Surat - Dahisar - Mumbai.
GURGAON
Travel distance from Delhi to Mumbai will be reduced from 1450 kms to 1250 km and
travel time from 24 hours to 12 hours.
Manesar FARIDABAD
This expressway is scheduled to be completed by 2023.
-8
NH ay
i g hw
H
p ur
Jai
Palwal
5
Building Features Description Building Features Description
Design Code Standard Design, fabrication & erection of structural steel to comply with AISC (American Institute of Internal Sprinkler System Roof sprinkler system of K115 std as per local norms/ NBC 2016.
Steel Construction)/ IS code. All welding work shall be as per AWS (American Welding Society).
Fire Water Tank And Pump Fire water tank of required capacity to be considered in the central UG tank. Fire tank capacity
Roof Collateral Load 30 ggs/ sq. mt collateral load considered on the roof to install sprinklers, electrical system & and fire pump shall be as per NBC norms.
other utility services/ additional 20kg/ sq mt design load on the roof for solar panel installation.
Building Aspect Ratio Provision of wet block at both the end of building. Male to female toilet ratio to be as per
Building Aspect Ratio Building length to the width ratio to be 2:1. building norms. Tap off in the Mezzanine/ Office area for Toilets.
Water Supply One water tap-off point shall be provided; Flushing water shall be supplied from the STP
Building Height at Eave Standard building clear height of 10 m. recycle water.
Roofing Type Standing seam roof system (Screw less roof system), Bare Galvalume (no paint). Power Load 1 KVA per 1000 sq. ft.
Skylight 3%-4% roof area shall be provided with skylight for natural daylight. Approx. one skylight at each DG and Transformer Yard Provision of area allocation for DG and Transformer, equipment and MEP in tenants scope.
bay on either side. Skylight panel will be of polycarbonate sheet fixed to avoid water leakage. Parking Provision of 5 car parking spaces & 10 two wheeler parking spaces will be provided for
1.0 lac sqft built up area. No dedicated space for truck parking except dock area.
Air Changes 3-6 Air changes/ 8 air changes for Industrial buildings with windows.
Canopy Height Canopy at 5.2 m height from the corresponding road level. External Infra at Park Level
Lightening Arrestor Lightening arrestor at the roof ridge to be installed as per NBC 2016. STP Park level central STP shall be provided as per NBC norms.
Arrangement
Water Supply Local source for domestic water for flushing treated water from STP shall be recycled.
Docking Apron Size 16.5 m wide docking apron provided for the 40ft vehicular movement. Concrete WTP, if required to be considered as tenants scope.
road shall be provided at the docking area with reversed slope towards the building.
Boundary Wall 7' height boundary to be provided at park level. Boundary wall shall be masonry/ precast
Dock Door Size 2.4m (W) x 3m (H), numbers shall be one rolling shutter per 12000 sq. ft. of wall up to 5' height from ground level and 2' height concertina wire.
building area/ one in each bay. one knockout panel in each bay shall be provided.
Gate House/ Security Cabin Gate house shall be provided with sliding gate for entry and exit. Width of the sliding gate
to be of 4.5m/ 6m wide.
RCC & Civil Structure Area Allocation Space/ Location to be marked out for Scrap yard, LT, DG, Compressor, Utility area etc for
each Building on Master plan.
Building Plinth Height 1.2m plinth height from the finish docking road level.
Signages Park Level signages like Emergency, Directional etc. will be provided only for fire exit.
Flooring Type Industrial FM-2 compliant floor, racking compliant, floor thickness as per the design load,
M30 grade concrete floor. Drivers Rest Area/ Toilets Driver's toilet shall be provided at park level and as per layout.
Truck Parking Area Truck holding area can be provided at park level and would be available as per layout.
Floor Load 5 Ton UDL floor design load to withstand racking load and MHE movement.
Fire Door Size 1.2m (W) x 2.1m (H) fire door shall be provided with panic bar as per NBC fire norms.
FACILITY MANAGEMENT
SERVICES HIGHLIGHT
WORLD-CLASS FACILITY
MANAGEMENT SERVICE
ESR parks are managed by a specialized facility management team Incident Management Park Security
experienced in global standards. We take utmost care to upkeep and maintain One click incident management 24x7 security with frequent patrolling and
common park infrastructure, amenities, plant and machinery and to assist system through ESR Smart App. surveillance through AI based cameras.
you with incident management, improvements, modifications and fit outs.
Facility Manager
Dedicated facility manager for overall
park management and client queries.
SMART, SUSTAINABLE AND ESR APP
HUMAN-CENTRIC DESIGN
The first Indian developer to introduce Smart Industrial & Logistics Park.
intuitive.
SOP's & FAQ's for safer parks.
Manage social distancing.
human-centric. Digital tracking & management of service requests.
sustainable.
Smart Security Polls
Amenities
Way Finding
Booking
#1 #1
SOUTH Ecommerce landlord Owner of logistics stock
KOREA
PRC in China in South Korea
JAPAN
INDIA
#1 #1
Development pipeline Non Temasek affiliated REIT
SINGAPORE in Seoul Metropolitan area in Singapore
#1
Development pipeline
AUSTRALIA in Greater Tokyo
and Osaka region
INDIA SNAPSHOT MUMBAI
ESR Bhiwandi 1 ESR Bhiwandi 2 ESR Lodha
43 Acres 49 Acres 88 Acres
1.3 MN SQ. FT. 1 MN SQ. FT. 1.9 MN SQ. FT.
Asia Pacific’s Industrial Real Estate Leader,
now empowering India’s Industrial & Logistics Ecosystem.
PUNE
ESR India at a glance ESR Chakan 1 ESR Chakan 2 ESR Global ESR Global
53 Acres 36 Acres Ranjangaon 1 Ranjangaon 2
1.3 MN SQ. FT. 1 MN SQ. FT. 25 Acres 18 Acres
0.6 MN SQ. FT. 0.4 MN SQ. FT.
Kolkata
CHENNAI BENGALURU
ESR Oragadam ESR Hoskote 1
80 Acres Coming Soon
1.7 MN SQ. FT.
HYDERABAD AHMEDABAD
ESR-GMR Shamshabad ESR Jalisana
Portfolio 66 Acres 37 Acres
18 MN SQ. FT. 1.6 MN SQ. FT. 1 MN SQ. FT.
GLOBAL PORTFOLIO INDIA PORTFOLIO
China Singapore
23 major cities 3 major cities
8.4 m sqm GFA 1.8 m sqm GFA
Australia
5 major cities
1.4 m sqm GFA
Gaurav Sharma Aakriti Shankar
gsharma@in.esr.com ashankar@in.esr.com
+91 9953 170 455 +91 9999 499 450
www.esr.com