You are on page 1of 2

OFFICIAL COPY - HI39490 - DJT52602A1 - OQ CDP 2016-013 - - PDF Generated on 21-Jun-2016 1:54P

M
CLIENT:

PROJECT:

FPSO CIDADE DE PARATY

HI39490 DJ T 52 602 A 1
DOCUMENT DESCRIPTION:

TOPSIDES

PROCESS SAFETY CAUSE & EFFECT

DIAGRAM

Status / Date Approved by Approved by


No of Pages Prepared by Checked by
Revision (dd-MMM-yy) LE EPM

V1 3-May-16 8 A.Oliveira D. Morita G. Suehiro G. Suehiro

A1 20-Jun-16 8 A.Oliveira D. Morita G. Suehiro G. Suehiro

FOR INFORMATION:

P Preliminary Issue PD Project Director


I Inter Discipline Checking ME&P Manager Engineering & Procurement
C For Comments and/or Approval CIC Construction Interface Coordinator
V Valid for Construction PCM Project Controls Manager
A Approved for Construction PQM Project Quality Manager
D Deleted EPM Engineering Project Manager
X "As Built" PPM Project Procurement Manager
LE Lead Engineer

© Copyright SBM Offshore N.V. 2012


Copyright by SBM Offshore N.V. or any of its subsidiaries. This document is the property of SBM Offshore N.V. or any of
its subsidiaries. This document or any part thereof is CONFIDENTIAL and may not be made known, copied, multiplied, or
Ex SB No. : 81891
used in any other way without the permission of SBM Offshore N.V. or any of its subsidiaries
OFFICIAL COPY - HI39490 - DJT52602A1 - OQ CDP 2016-013 - - PDF Generated on 21-Jun-2016 1:54P
M
TOPSIDES
PROCESS SAFETY CAUSE & EFFECT
DIAGRAM
HI39490 DJ T 52 602 A1 Page 2

REVISION STATUS / SUMMARY OF CHANGES

REVISION REVISED CHAPTERS REVISION DESCRIPTION REASON FOR REVISION


V1 Changes are indicated in yellow Valid for construction OQ CDP 2016-013
Approved for construction
A1 Changes are indicated in yellow OQ CDP 2016-013
(ABS ref. T1532613)

You might also like