GREENFIELD DEVELOPMENT CORPORATION

CONSTRUCTION MANAGEMENT DEPARTMENT


Ref. BONA # 005

TRANSMITTAL FORM

TO: DATE:

Engr. RENATO E. RAFON 16 January 2006


TSD - Head

CC:
Arch. ADELAIDA COBRES
PDG – Project In-charge

THRU: NOTED BY:

Engr. EMMANUEL R. ASEOCHE Engr. JUANITO PANGILINAN


CMD – Project In-charge CMD - Manager

FROM:

Engr. ERICKSON D. MALICSI


CMD – Project Inspector

SUBJECT:

“ REQUEST FOR APPROVAL ( RFA ) ”

ENCLOSURE:

1. Approval for the design of Glass blocks for skylight @ Garden Level ( RFA # 029 )
2. Approval for the Railings for Ledges ( RFA # 030 )
3. Removal of Ramp & construction of new stairs @ main entrance ( RFA # 031 )
4. Cost breakdown for the repair of ducting ( RFA # 032 )
5. Cost breakdown for the stainless railing @ main entrance ( RFA # 033 )
6. Cost breakdown for the adjustment of Glass Façade @ Samsung area ( RFA # 034 )

Note:
Kindly resolve as soon as possible….

Received By:

__________________________________
Signature over Printed Name