You are on page 1of 4

of tank 1 of tank 2

32535
North

TOC+852.48 TOC+852.48

Survey point T2:


Survey point T1:
E: 501.157
E: 468.622
N: 1011.710
N: 1011.710
850.73 850.73
02 02

A TOC+852.48 TOC+852.48 TOC+852.48 TOC+852.48 A' (See sheet 2)

Drawoff sump. Drawoff sump.


See detail 1 See detail 1

21
00
02 02
00
21

TOC+852.48 TOC+852.48

Plan view. Foundation


Scale 1:100
02 2017/01/18 New revision IFC MTB/JMCR JLH VMB VTM
01 2016/12/05 Revision as per comments IFC MTB/JMCR JLH VMB VTM
00 2016/11/03 First edition IFC MTB/JMCR JLH VMB VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Location:

2100
Steel reinforcement
Tank
Welding between steel
reinforcement rods (at
DN100

Exothermic connection "T"


between copper cable and
Drawoff sump reinforcement steel rod.
Tank
500

bottom
TOC +852.48m
Exothermic connection
between copper cables "T".
450
600

Slab
Client: P. Engineer (if applicable):
1220
Stamp: Signature: P.Eng.No:

Stranded bare copper cable EPC Contractor: EPC Subcontractor:


Consultant:
ABENER
Clean sand filling
Project: Supplier:
CONSTRUCTION OF
Tank foundation
Structural filling Main grounding grid. Waad Al-Shamal ISCCPP
Grounding. Stranded bare copper
Scale: Drawing No.:
For grounding connections, Water Storage Area

Title & Subtitles:


Detail 1. Drawoff sump detail (section) 1:100/1:25
4011-DRA-ABE-005-320-0004
see drawing 4011-DRA-ABE-075-424-0015 Civil works Sheets: Sheet No.:
(for more information see supplier information) No scale Foundations 04 01
Scale 1:25 Size:
Desalinated Water Tank foundations drawing Int. Drawing No.
A1 Plan view Desalinated Water Tank
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No
Perimeter beam defined in Section BB' of tank 1 of tank 2

Tank Compacted Tank Tank Compacted Tank


356

clean sand filling clean sand filling

450
450
TOC +852.48m 1 1 1 1 TOC +852.48m
100 100 100 100
GL +851.90m Gravel
900

900
BOC +851.58m

BOC +851.58m 800 Structural fill Structural fill Structural fill Structural fill 800
HDPE layer 2mm HDPE layer 2mm
See note 7 See note 7 Blinding concrete laver See note 7 See note 7 Blinding concrete laver
10cm/(TYp) 10cm/(TYp)
Section AA'
Scale 1:100 32535

North Galvanized anchor bolt


See detail 2
280 R=10624 (Anchor location)

Compacted
Survey point clean sand filling

1
100
TOC+852.48 TOC +852.48

450
900
GL +851.90

50
Stirrups
00
R 109
HDPE layer 2mm
100 800 Structural fill HDPE layer 2mm
B' (Typ) Blinding concrete See note 7

0
010
R1 Section BB'
Scale 1:20
B
20
06
R1

02 2017/01/18 New revision IFC MTB/JMCR JLH VMB VTM


01 2016/12/05 Revision as per comments IFC MTB/JMCR JLH VMB VTM
00 2016/11/03 First edition IFC MTB/JMCR JLH VMB VTM
ASTM A563 Grade A Rev. Edition Description: Issue Signature Signature Signature Signature
Double Hex nuts M36 No.: Date: for: Drawn: Checked: Reviewed: Approved:
Stirrups ASTM F436 Location:
Washer M36

356
ASTM A36 M36
Grade 55

500
ASTM A563 Grade A
TOC+852.48
800 Perimeter area

Hex nuts M36


Client: P. Engineer (if applicable):
Stamp: Signature: P.Eng.No:

84
55
EPC Contractor: EPC Subcontractor:
Consultant:
ABENER
Part foundation plan view Detail 2. Anchor bolt detail (2x24un)
Scale 1:50 [according to supplier with the steel tank] Project: Supplier:
Scale 1:10 CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: Water Storage Area Drawing No.:

Title & Subtitles:


4011-DRA-ABE-005-320-0004
Various Civil works Sheets: Sheet No.:
Foundations 04 02
Size:
Desalinated Water Tank foundations drawing Int. Drawing No.
A1 Section and details tanks foundation
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No
of tank of tank
North North

TOC+852.48
1
24
2

23
3

22 Drain pipe
4

21
5

20
R106
20
Stakeout point
6

19 7 of tank
TOC+852.48 TOC+852.48

18 8

17 9

Gravel at drain

00
10
16 10

C'
15 11

14 12
13
TOC+852.48

Plan view. Anchor bolts definition Plan view. Draining


Scale 1:100
Scale 1:100

02 2017/01/18 New revision IFC MTB/JMCR JLH VMB VTM


01 2016/12/05 Revision as per comments IFC MTB/JMCR JLH VMB VTM
00 2016/11/03 First edition IFC MTB/JMCR JLH VMB VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Table 1. Coordinates Anchor bolts points T1 Table 2. Coordinates Anchor bolts points T2 Location:

Points East (m) North (m) Points East (m) North (m)
468.622 1022.330 501.157 1022.330 Compacted HDPE
1 1
clean sand filling layer 2mm
2 471.371 1021.968 2 503.906 1021.968
1
3 473.932 1020.907 3 506.467 1020.907 100
4 476.131 1019.219 4 508.666 1019.219 TOC +852.48
5 477.819 1017.020 5 510.354 1017.020
6 478.880 1014.459 6 511.415 1014.459 PVC Drain pipe 3"

430

450
7 479.242 1011.710 7 511.777 1011.710
8 478.880 1008.961 8 511.415 1008.961 100 100
0.3%
9 477.819 1006.400 9 510.354 1006.400
GL +851.90
10 476.131 1004.201 10 508.666 1004.201

295
11 473.932 1002.513 11 506.467 1002.513
12 471.371 1001.452 12 503.906 1001.452

50
468.622 1001.090 501.157 1001.090 100 295
13 13
14 465.873 1001.452 14 498.408 1001.452
15 463.312 1002.513 15 495.847 1002.513
100

16 461.113 1004.201 16 493.648 1004.201 HDPE


Blinding concrete layer 2mm Gravel at drain Structural filling Client: P. Engineer (if applicable):
17 459.425 1006.400 17 491.960 1006.400
Stamp: Signature: P.Eng.No:
18 458.364 1008.961 18 490.899 1008.961
19 458.002 1011.710 19 490.537 1011.710
20 458.364 1014.459 20 490.899 1014.459 EPC Contractor: EPC Subcontractor:
Section CC' Consultant:
21
22
459.425
461.113
1017.020
1019.219
21
22
491.960
493.648
1017.020
1019.219
Scale 1:20 ABENER
23 463.312 1020.907 23 495.847 1020.907
Project: Supplier:
465.873 1021.968 498.408 1021.968
24 24 CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: Water Storage Area Drawing No.:

Title & Subtitles:


4011-DRA-ABE-005-320-0004
1:100/1:20 Civil works Sheets: Sheet No.:
Foundations 04 03
Size:
Desalinated Water Tank foundations drawing Int. Drawing No.
A1 Plan view. Anchor bolts definition and tanks draining
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No
of tank

of tank
North

See Detail 3 Tank ring beam

75
675

Detail 3
Scale 1:20

Stakeout point

See Detail 4

See Detail 4 of tank

This provision will be for tanks


T2 Tank ring beam

E'
See Detail 4

400
200
See Detail 4

D
This provision will be for tanks
T1

D'

E
See Detail 3

Detail 4
Scale 1:20
Plan view. Cathodic Protection.
Scale 1:100

02 2017/01/18 New revision IFC MTB/JMCR JLH VMB VTM


01 2016/12/05 Revision as per comments IFC MTB/JMCR JLH VMB VTM
00 2016/11/03 First edition IFC MTB/JMCR JLH VMB VTM
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Location:

Compacted
Compacted HDPE clean sand filling HDPE
clean sand filling layer 2mm layer 2mm

1 1
100 100
TOC +852.48 TOC +852.48
80

120

100 0.4% 100


400

450
450

100

GL +851.90 GL +851.90

100
50
50

100

Client: P. Engineer (if applicable):


800 Stamp: Signature: P.Eng.No:
100
100

Blinding concrete HDPE HDPE


layer 2mm Structural filling layer 2mm Structural filling
Blinding concrete
EPC Contractor: EPC Subcontractor:
Consultant:
ABENER
Section DD' Section EE' Project: Supplier:
Scale 1:20 Scale 1:20
CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: Water Storage Area Drawing No.:

Title & Subtitles:


4011-DRA-ABE-005-320-0004
Various Civil works Sheets: Sheet No.:
Foundations 04 04
Size:
Desalinated Water Tank foundations drawing Int. Drawing No.
A1 Plan and sections tanks Cathodic Protection
This drawing and the design it covers are the property of Abener. They have been Project/Contract number: 4400006770
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abener gives
permission to the borrower for using it through a written consent . Critical: Yes X No