Professional Documents
Culture Documents
32535
North
TOC+852.48 TOC+852.48
21
00
02 02
00
21
TOC+852.48 TOC+852.48
2100
Steel reinforcement
Tank
Welding between steel
reinforcement rods (at
DN100
bottom
TOC +852.48m
Exothermic connection
between copper cables "T".
450
600
Slab
Client: P. Engineer (if applicable):
1220
Stamp: Signature: P.Eng.No:
450
450
TOC +852.48m 1 1 1 1 TOC +852.48m
100 100 100 100
GL +851.90m Gravel
900
900
BOC +851.58m
BOC +851.58m 800 Structural fill Structural fill Structural fill Structural fill 800
HDPE layer 2mm HDPE layer 2mm
See note 7 See note 7 Blinding concrete laver See note 7 See note 7 Blinding concrete laver
10cm/(TYp) 10cm/(TYp)
Section AA'
Scale 1:100 32535
Compacted
Survey point clean sand filling
1
100
TOC+852.48 TOC +852.48
450
900
GL +851.90
50
Stirrups
00
R 109
HDPE layer 2mm
100 800 Structural fill HDPE layer 2mm
B' (Typ) Blinding concrete See note 7
0
010
R1 Section BB'
Scale 1:20
B
20
06
R1
356
ASTM A36 M36
Grade 55
500
ASTM A563 Grade A
TOC+852.48
800 Perimeter area
84
55
EPC Contractor: EPC Subcontractor:
Consultant:
ABENER
Part foundation plan view Detail 2. Anchor bolt detail (2x24un)
Scale 1:50 [according to supplier with the steel tank] Project: Supplier:
Scale 1:10 CONSTRUCTION OF
Waad Al-Shamal ISCCPP
Scale: Water Storage Area Drawing No.:
TOC+852.48
1
24
2
23
3
22 Drain pipe
4
21
5
20
R106
20
Stakeout point
6
19 7 of tank
TOC+852.48 TOC+852.48
18 8
17 9
Gravel at drain
00
10
16 10
C'
15 11
14 12
13
TOC+852.48
Points East (m) North (m) Points East (m) North (m)
468.622 1022.330 501.157 1022.330 Compacted HDPE
1 1
clean sand filling layer 2mm
2 471.371 1021.968 2 503.906 1021.968
1
3 473.932 1020.907 3 506.467 1020.907 100
4 476.131 1019.219 4 508.666 1019.219 TOC +852.48
5 477.819 1017.020 5 510.354 1017.020
6 478.880 1014.459 6 511.415 1014.459 PVC Drain pipe 3"
430
450
7 479.242 1011.710 7 511.777 1011.710
8 478.880 1008.961 8 511.415 1008.961 100 100
0.3%
9 477.819 1006.400 9 510.354 1006.400
GL +851.90
10 476.131 1004.201 10 508.666 1004.201
295
11 473.932 1002.513 11 506.467 1002.513
12 471.371 1001.452 12 503.906 1001.452
50
468.622 1001.090 501.157 1001.090 100 295
13 13
14 465.873 1001.452 14 498.408 1001.452
15 463.312 1002.513 15 495.847 1002.513
100
of tank
North
75
675
Detail 3
Scale 1:20
Stakeout point
See Detail 4
E'
See Detail 4
400
200
See Detail 4
D
This provision will be for tanks
T1
D'
E
See Detail 3
Detail 4
Scale 1:20
Plan view. Cathodic Protection.
Scale 1:100
Compacted
Compacted HDPE clean sand filling HDPE
clean sand filling layer 2mm layer 2mm
1 1
100 100
TOC +852.48 TOC +852.48
80
120
450
450
100
GL +851.90 GL +851.90
100
50
50
100