You are on page 1of 4

EXAMINE VARIABLES=PRETEST BY POSTEST

/PLOT BOXPLOT STEMLEAF NPPLOT


/COMPARE GROUPS
/STATISTICS DESCRIPTIVES
/CINTERVAL 95
/MISSING LISTWISE
/NOTOTAL.

Explore
[DataSet0]
Warnings

Pre Test Produksi ASI is constant when Post Test Produksi ASI = 310. It will be included in
any boxplots produced but other output will be omitted.
Pre Test Produksi ASI is constant when Post Test Produksi ASI = 320. It will be included in
any boxplots produced but other output will be omitted.
Pre Test Produksi ASI is constant when Post Test Produksi ASI = 420. It will be included in
any boxplots produced but other output will be omitted.
Pre Test Produksi ASI is constant when Post Test Produksi ASI = 470. It will be included in
any boxplots produced but other output will be omitted.

Post Test Produksi ASI

Case Processing Summary

Cases

Valid Missing Total

Post Test Produksi ASI N Percent N Percent N Percent

Pre Test Produksi ASI 300 5 100.0% 0 0.0% 5 100.0%

310 1 100.0% 0 0.0% 1 100.0%

320 1 100.0% 0 0.0% 1 100.0%

350 4 100.0% 0 0.0% 4 100.0%

400 3 100.0% 0 0.0% 3 100.0%

410 2 100.0% 0 0.0% 2 100.0%

420 1 100.0% 0 0.0% 1 100.0%

450 2 100.0% 0 0.0% 2 100.0%

470 1 100.0% 0 0.0% 1 100.0%

Descriptivesa,b,c,d

Post Test Produksi ASI Statistic Std. Error


Pre Test Produksi ASI 300 Mean 101.40 3.311

95% Confidence Interval for Lower Bound 92.21


Mean Upper Bound 110.59

5% Trimmed Mean 101.56

Median 102.00

Variance 54.800

Std. Deviation 7.403

Minimum 90

Maximum 110

Range 20

Interquartile Range 13

Skewness -.823 .913

Kurtosis 1.379 2.000

350 Mean 103.50 2.062

95% Confidence Interval for Lower Bound 96.94


Mean Upper Bound 110.06

5% Trimmed Mean 103.44

Median 103.00

Variance 17.000

Std. Deviation 4.123

Minimum 100

Maximum 108

Range 8

Interquartile Range 8

Skewness .200 1.014

Kurtosis -4.858 2.619

400 Mean 126.67 14.530

95% Confidence Interval for Lower Bound 64.15


Mean Upper Bound 189.18

5% Trimmed Mean .

Median 130.00

Variance 633.333

Std. Deviation 25.166

Minimum 100

Maximum 150
Range 50

Interquartile Range .

Skewness -.586 1.225

Kurtosis . .

410 Mean 114.50 5.500

95% Confidence Interval for Lower Bound 44.62


Mean Upper Bound 184.38

5% Trimmed Mean .

Median 114.50

Variance 60.500

Std. Deviation 7.778

Minimum 109

Maximum 120

Range 11

Interquartile Range .

Skewness . .

Kurtosis . .

450 Mean 103.50 .500

95% Confidence Interval for Lower Bound 97.15


Mean Upper Bound 109.85

5% Trimmed Mean .

Median 103.50

Variance .500

Std. Deviation .707

Minimum 103

Maximum 104

Range 1

Interquartile Range .

Skewness . .

Kurtosis . .

a. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 310. It has been omitted.
b. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 320. It has been omitted.
c. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 420. It has been omitted.
d. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 470. It has been omitted.
Tests of Normalityc,d,e,f

Kolmogorov-Smirnova Shapiro-Wilk

Post Test Produksi ASI Statistic df Sig. Statistic df Sig.

Pre Test Produksi ASI 300 .225 5 .200* .959 5 .802

350 .302 4 . .827 4 .161

400 .219 3 . .987 3 .780

410 .260 2 .

450 .260 2 .

*. This is a lower bound of the true significance.


a. Lilliefors Significance Correction
c. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 310. It has been omitted.
d. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 320. It has been omitted.
e. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 420. It has been omitted.
f. Pre Test Produksi ASI is constant when Post Test Produksi ASI = 470. It has been omitted.

You might also like