PROJECT NO. :
COMPANY NO. : POSCO ENGINEERING & CONSTRUCTION CO., LTD.
CLIENT : ENERGIA NATURAL DOMINICANA ENADOM, S. R. L.,
PROJECT NAME : DR Andres LNG Terminal Expansion Project
DISCIPLINE : Commissioning (Truck Loading Station) Date 2022.03.25
1st Issue 2nd Issue Reviewer
S/N Document No. Title Discipline Class
Rev. Submit Rev. Submit Contractor Owner
1 ELT-01-ER-RPT-0030 Operation Manual for Truck Loading Station (Spanish) Process 1 A 2022.03.07
2 ELT-01-KR-PC-0006 Pre-Commissioning and Commissioning Procedure for Truck Loading Station Process 2 A 2021.12.09 B 2022.02.10
3 ELT-01-KR-PC-0007 Pre-Startup Safety Review (PSSR) Procedure for Truck Loading Station Process 2 A 2022.02.02
4 ELT-01-KR-PC-0008 Capability Test Procedure for Truck Loading Station Process 2 A 2022.03.08
5 ELT-01-KR-PC-0009 Performance Test Procedure for Truck Loading Station Process 2 A 2022.03.08
6 ELT-01-KR-RPT-0001 Pre-commissioning (PDO and Leak Test) Report for Truck Loading Station Process 2 A 2022.03.04
7 ELT-01-KR-RPT-0002 Pre-Startup Safety Review (PSSR) Report for Truck Loading Station Process 2 A 2022.03.04
8 ELT-01-KR-RPT-0003 Commossioning Test Report (Cool-down) for Truck Loading Station Process 2 A 2022.03.17
9 ELT-01-KR-RPT-0004 Capability Test Report for Truck Loading Station Process 2 A 2022.03.17
10 ELT-01-KR-RPT-0005 Performance Test Report for Truck Loading Station Process 2 A 2022.03.17
11 ELT-01-KR-RPT-0006 Operation and Maintenance Training Material for Truck Loading Station (Spanish) Process 2 A 2022.03.04
Operation and Maintenance Training Material for Truck Loading Station (English) Process 2 A 2022.03.08
12 ELT-01-KI-RPT-0001 Pre-commissioning (Loop, Fire&Gas and Function test) Report for Truck Loading Station I&E 2 A 2022.03.21