You are on page 1of 5

Mabar Power Station

General Affair Document


Tricycle Check & Maintenance

Document No.

Mabar Power Station General Affair Document


Tricycle Check & Maintenance
This instruction will be reviewed and re-issue every 2-year or whenever necessary. If
there is no amendment in the content, only the cover page will be re-issued and sent to
the document controllers. New version of the instructions will be uploaded to the
Integrated Information Platform. The cover page will list out the newest version number,
the date of issue and signed by Originator, Checked By, Consented By, Approver and
Executer.

Version Revised Portion

0 Original

Version Issue Date


0

Originator Checked By Approved By

Yana Manalu Edi Susanto Zhang Wei


Nashru Imaruzi
Wang Qi
Nova

Effective Date:09/10/2018
Meals Pick-up & Tricycle Check/ Maintenance

Due to the condition of work location and meeting management result, that ways this regulation is
prepared to provide guidance “Meals Pick-up & Tricycle Check/ Maintenance”.

1. Person In Charge
Leader : Zhang Wei
Report to : Edi Susanto/Nashru Imaruzi/ Yana Manalu
Tools & Spare Part : Nova/Wang qi
Members : Operation technician & Maintenance technician

2. Meals Pick-up
For Meals Pick-up due by Operation technician & Maintenance technician, switch every week, 3
time/day.
Schedule:
Breakfast : 06:45 WIB
Lunch : 11:00 WIB
Dinner : 17:30 WIB

3. Tricycle Check/ Maintenance


The company provide Tool & Spare Part PIC Nova/Wang qi, For Tricycle Check/ Maintenance due
by Operation technician & Maintenance technician in charge of the day, must fill the log sheet every
evening (Dinner meals pick up), Annex 1.
If any damage and repair need tool or spare part can ask to Nova/Wang qi.

Note: every hand over to another team, please make sure the tricycle in good condition if something
damage must repair by last team used.
Annex : 1

1. Tricycle Daily Check Form


2. Maintenance Technician In Charge List Triycle Daily Check
Day / Date : Mon / ................
NO. Part Name Condition Action Part Used Remarks Check by
1
Tricycle O&M Maintenance team
Spokes
No. 2 Velg Name Day
3 Tire
4 Chain and Sprocket System
5 Steering System
6 Brake System
7 Saddle
1 8 Cart BOP Monday
9 Paddle

Day / Date : Tue / ................


NO. Part Name Condition Action Part Used Remarks Check by
1 Spokes
2 2 Velg Boiler Tuesday
3 Tire
4 Chain and Sprocket System
5 Steering System
6 Brake System
7 Saddle
8 Cart
9 Paddle

3 Electrical Wednesday

Day / Date : Wed / ................


NO. Part Name Condition Action Part Used Remarks Check by
1 Spokes
2 Velg
3 Tire
4 4 Chain and Sprocket System C&I Thursday
5 Steering System
6 Brake System
7 Saddle
8 Cart
9 Paddle

5 Turbine Friday

Day / Date : Thu / ................


NO. Part Name Condition Action Part Used Remarks Check by
1 Spokes
2 Velg
3 Tire
4 Chain and Sprocket System
5 Steering System
6 Brake System
7 Saddle
8 Cart
9 Paddle

Day / Date : Fri / ................


NO. Part Name Condition Action Part Used Remarks Check by
1 Spokes
2 Velg
3 Tire
4 Chain and Sprocket System
5 Steering System
6 Brake System
7 Saddle
8 Cart
9 Paddle

SEPC/FMT/DC01
3. Operation Technician In Charge List

Tricycle O&M Operation Team


No. Group Name Day
1 Khoirunnas
2 Zulpriadi Pandiangan
3 A Muammar Saputra Monday
4 Budi Pranata Ritonga
5 Dian Ade Sitopu
6 Syarifuddin Siregar
7 Andry Septian Sirait
8 B Julius Alfrado Pakpahan Tuesday
9 Muhammad Rizqi Baskoro
10 Parningotan Nainggolan
11 Bevin Simanjuntak
12 Wahyu Nur Ilmi
13 Gunardi Sihombing
C Wednesday
14 Reindhat Siboro
15 Riduan Chair
16 Affrin Hot Pardamean Simatupang
17 Prawiro Sumantri
18 Toba Halasan Manalu
19 D Ardianto Thursday
20 M. Wahyu Kuntoro
21 Supriadi Deningrat
22 Krissandarta Tarigan
23 Danny Yandatsa Sinuraya
E Friday
24 Denny Fernando Sitorus
25 Muhammad Taufik Zulhairi

You might also like