You are on page 1of 41





Source: http://mwss.gov.ph/
As of 2nd Qtr of
2017

1.34M
water service
connections
10 million
service area people
540 sq km
UMIRAY RIVER (

ANGAT RIVER
1 2 3

5 4 3 2 1

• NORTH QUEZON CITY


• NORTH CALOOCAN
• VALENZUELA
• MALABON 2,400 MLD 4,000 MLD

1,600 MLD

• SOUTH
CALOOCAN
• MANILA
• PASAY
• MAKATI LA MESA DAM &
• PARANAQUE RESERVOIR
•CAVITE

BALARA
TREATMENT
PLANTS 1 &2
• LAS PINAS
• MUNTINLUPA
• CAVITE


8

Source: Administration –Logistics Records (November 2014)


Source: Administration –Logistics Records (November 2014)



±
Building Type MWSI C1 MWSI C2 MWSI S1

Basic Score 1.2 2.2 1.8


Vertical Irregularity -0.8 -1.2 -1.0
Plan Irregularity -0.5 -1.0 -0.7
Near-Source -0.3 -0.7 -0.4
Cracks/Deterioration -0.6 -1.2 -0.9
Essential Occupancy -0.2 -0.5 -0.3
Pre-Code -0.2 -1.2 -0.5
Post-Benchmark 1.9 3.4 1.3
Soil Type A or B 0.4 0.8 0.4
Soil Type E -0.3 -0.8 -0.5
Building Type MWSI C1 FEMA C1 MWSI C2 FEMA C2 MWSI S1 FEMA S1

Basic Score 1.2 1.5 2.2 2.0 1.8 2.1


Vertical Irregularity -0.8 -0.9 -1.2 -1.0 -1.0 -1.0
Plan Irregularity -0.5 -0.6 -1.0 -0.8 -0.7 -0.8
Near-Source -0.3 - -0.7 - -0.4 -
Cracks/Deterioration -0.6 - -1.2 - -0.9 -
Essential Occupancy -0.2 - -0.5 - -0.3 -
Pre-Code -0.2 -0.4 -1.2 -0.7 -0.5 -0.6
Post-Benchmark 1.9 1.9 3.4 2.1 1.3 1.4
Soil Type A or B 0.4 0.4 0.8 0.5 0.4 0.4
Soil Type E -0.3 0.0 -0.8 0.0 -0.5 -0.2
Distribution of Structural Scores (All Buildings)
25

20

15 48th Percentile
at Score of 2.0

10

Structural Score, S
Structural Score vs Year Built
6
Start of
MPIC-DMCI
5 Acquisition
Structural Score, S

3
Cut-off Score, S = 2.0

0
1970 1980 1990 2000 2010 2020
Year Built
Occupancy Type Data Total Passed Failed
Business Areas 10 3 7
Central Offices 0 0 0
Pump Station and Booster 36 5 31
Warehouse/Storage 10 7 3
Water Treatment Plant 13 8 5
Wastewater Treatment Plant 45 37 8

Occupancy Type Data % of Failed Buildings


Business Areas 70%
Central Offices N/A
Pump Station and Booster 86%
Warehouse/Storage 30%
Water Treatment Plant 38%
Wastewater Treatment Plant 18%

• 
Identify the Existing Facilities to be
Evaluated

Basic, Enhanced, or
Limited Performance
Objective

Obtain As-built
Information

Perform Condition Assessment Tier 2 Deficiency-based Retrofit


Procedure

Defects Mapping Retrofit Measures for Structural


and Non-structural Deficiencies

Rehabilitation Solution

Modify
Y Compliance
with
N Retrofit
Performance Scheme
Objectives
Determine Rehabilitation and Retrofit Project
Feasibility

Prepare Bid and Construction Documents for Retrofit


Screening
Pre- chlorination (Raw Water
Inlet)

Aluminum
La Mesa
Sulfate
WTP 2
General
Layout

Polymer
Post Chlorination



Demand Capacity Ratio (DCR)
Member Remarks
M V T
Main Canal
Foundation Slab 0.90 0.39 - Not at risk
Wall 0.78 0.56 - Not at risk
Beam - - 0.26 Not at risk
North and South Inlets
Foundation Slab 0.89 0.30 - Not at risk
Wall 0.95 0.45 - Not at risk
Beam - - 0.71 Not at risk
Demand Capacity Ratio (DCR)
Member Remarks
M V T
Main Canal
Foundation Slab 1.91 0.54 - At risk
Wall 3.13 1.55 - At risk
Beam - - 1.53 At risk
North and South Inlets
Foundation Slab 1.59 0.63 - At risk
Wall 1.23 0.32 - At risk
Beam - - 1.00 Not at risk