You are on page 1of 1

NDE REQUEST FOR WQT

TO: ITIS FROM: WAPSTECH WPS/PROCESS: WAPS-11-20/ GTAW/SMAW DATE: 2/1/2022


CONTACT: CLIENT: SAUDI ARAMCO PROJECT: STEAM TURBINE REPLACEMENT AT SOUTH STABILIZER

METHOD: PT MT UT RT ACCPT STD: ASME IX AWS D1.1 API 1104 B31.3

Welder No
Sr. Dia
WELDER NAME CONTRACTOR NAME WQT# POSITION Thk.(mm) Process Material Segment/Remarks
No. Inch

1 TAHIR HUSEN WAPSTECH WAPS-WQT-1 6G 10" 10.97 GTAW+SMAW ASTM A106 GR.B WAPS-15

PREPARED BY:

NAME ABDUL HAFEEZ

SIGN.:

This document is intellectual property of SINSINA CORNER COMPANY Any unauthorized use, including modification and reproduction of the content is strictly prohibited.

You might also like