Well-wise Daily Geological Report for Drilling Wells (Status at 5:00 AM)

Rig Loc. Type THD (P/A) Well No. TD (m) Days (P/A) DOS Area/Plinth
S-1 * HZR Dev S 115.3/133 Hapjan-74 2900/ 2901 90 77 20.12.2021 Hapjan, HJN-16P
Rigging down. High voltage electrical line shifting require. (Security deployed at forward location HZW on 25.03.2022. Rig down declared at 1 pm on 07.03.2022).
[Fwd. Loc. HZW (Makum), MKM-8P→ LAF-3 issued on 18.12.2021. Civil work completed. Recce carried-out on 14.03.2022]
S-2 * NLY Inj J 1094.5 NHK- 660 3560 90 37 19.02.2022 Nahorkatiya, NHK-452/612P
Depth: 2451 m (KOP: 798 m), Prog: Nil, P/Ops: P/out bit (M/Wt.: 72 lbs/cft)
WLD recorded ACRT-SDL-DSN-IDT-SP-GR-CAL-BSAT logs (Logger’s depth: 2376 m, BHT: 50°C, logging tool held-up at 2376 m). R/in bit with stabilizers (at 1, 10
& 19 m) to 2171 m where it got held-up, while attempted to reaming observed IRD malfunction. P/out bit upto 311 m to attend the same. {THD at 2451.0 m MD
(2317.1 m TVD) is 627.7 m (626.5 m) towards N67.0°W (N67.1°W); D/A: 24.6° (24.9°) (M/s. Baker Hughes)}.
[Fwd. Loc. HZS (Hapjan); Common plinth of HZS-HZT→ Civil work in progress]
S-3 * HZQ Inj J 737.98/684.1 Hapjan-75/MMC 2988/ 2994 90 64 23.01.2022 Hapjan, HJN-19,20,22P
Depth: 2994 m (Final) (KOP: 1000 m), P/Ops: Production testing
Y’day morning SITP & SICP: Nil. Opened the well & observed no displacement. Unloaded 27 bbls (cumm.: 87 bbls, initial unloading: 60 bbls) by applying 5 nos of
N2 shots & observed floating oil. Shut-in well with SITP:Nil & SICP: 700 psi (N2). T’day morning SITP: Nil & SICP: 700 psi (N2). {Sample analysis collected on
28.03.2022 at 10:20 am showed oil: 33% & water: 67% (salinity: 200 ppm, bi-carbonate: 183 ppm) and at 4:30 pm showed oil: 3% & water: 97% (salinity: 200
ppm, bi-carbonate: 61 ppm)}.
[Fwd. Loc. DIV (Dholiya); Loc. DBQ Plinth→ Civil work completed. Carried-out final recce on 28.02.2022]
S-4 * DJA Dev S 546.7/ 554.2 S. Tinali-10 3390/ 3399 90 112 06.12.2021 S. Tinali, STL-5/6/7/9P
Depth: 3399 m (Final) (KOP: 1405 m), P/Ops: CH survey (M/Wt.: 71 lbs/cft)
C&C mud. POOH rotovert. WLD made a junk-basket-GR-CCL trip to 3316 m & recording CBL-VDL-GR-CCL-CAST-DSN logs.
[Fwd. Loc. MGM (Lakwagaon); Common plinth of MGM-MGU→ LAF-3 issued on 12.05.2021. Civil work in progress]
S-5 * DJB Dev J 997.2 S. Tinali-11 3500 90 24 05.03.2022 South Tinali, TNL-9P
Depth: 2052 m (KOP: 1000 m), Prog: 70 m, P/Ops: Circulation (M/Wt.: 69 lbs/cft)
Drilled 1982-2052 m. Observed poor ROP. Circulating prior to P/out for bit change. {THD at 2028.1 m MD (1949.9 m TVD) is 374.4 m (367.7 m) towards S2.4°E
(S3.0°E); D/A: 25.9° (25.3°) (M/s. NEWSCO)}.
[Fwd Loc. TAQ (East Khagorijan); TAQ-TBE-TBD Plinth → Rev LAF-3 issued on 26.10.2021. Under Land acquisition-ROE]
S-6 * MGP Dev J 987.1/ LKG-/ MMC 3640/ 90 Lakwagaon, IP
Rig package painting in progress. (R/up: 20%). (ILM completed on 23.03.2022).
[Fwd. Loc. MGO (Lakwagaon); MGP-MGO-MGQ-MGR-MGT-MGS Plinth→ Civil work completed. Final recce carried-out on 09.03.2022]
S-7 (E-2000) DYE Exp J 1168/ Dholiya-2/ MMC 4042/ 120 81 06.01.2022 Dholiya, Dholiya-1P
Depth: 3514 m (KOP: 1000 m), Prog: 16 m, P/Ops: P/out bit (M/Wt.: 75 lbs/cft)
Drilled 3498-3514 m. Observed poor ROP. C&C mud. P/out upto 211 m for bit change. {THD at 3487.1 m MD (3288.9 m TVD) is 950.1 m (943.3 m) towards
S59.2°W (S59.3°W); D/A: 23.6° (23.9°) (M/s BH services)}.
[Fwd. Loc. MFT (Safrai); IP→ Civil work completed for Sindhu Rig. Modification for S-7 rig in progress]
S-8 (E-3000) DIP Exp S 107/ Balimara-12/ MMC 4440/ 121 70 17.01.2022 Balimara/ IP (combo-pad)
Depth: 3103 m (KOP: 1038 m), Prog: 61 m, P/Ops: Drilling (M/Wt.: 73 lbs/cft)
Drilled 3042-3103 m. {THD at 1463.5 m MD (1455.0 m TVD) is 76.3 m (90.2 m) towards N44.4°W (N46.8°W); D/A: 12.4° (9.4°) (M/s NEWSCO)}.
[Fwd. Loc. HZU (Singhibil); SGB-1→ Civil work completed]
VFD-1 (E-2000) HZM Exp J 1119.5/ North Balijan-5 4059/ 125 108 10.12.2021 North Balijan/ IP
Depth: 3275 m (B-hole) (A-hole: 2749 m, KOP: 1214 m) (KOP for side-track B-hole: 2591 m), Prog: 36, P/Ops: Drilling (M/Wt.: 75 lbs/cft)
Drilled 3239-3275 m. {THD at 3248.6 m MD (3084.2 m TVD) is 779.6 m (781.5 m) towards N82.9°W (N82.8°W); D/A: 25.6° (24.5°) M/s Baker Hughes) (B-
hole)}.
[Fwd. Loc. DJD (Balimara); BMR-11P→ LAF-3 issued on 07.02.2022. Civil work in progress]
VFD-2 (E-2000) DIQ Dev S 507.9/ Balimara- 4377/ 120 Balimara, BMR-6/8P
Waiting for man-power. (R/up: 88%).
[Fwd. Loc. BI (Balimara), Balimara-6/8-DIQ-BI-BJ Plinth→ LAF-3 issued on 21.03.2022]
CH-1 (JB) # TBT Exp J 1651/ Dinjan-2 4190/ 120 97 21.12.2021 Dinjan, Dinjan-1P
Depth: 3674 m (KOP: 600 m), Prog: Nil, P/Ops: Working on stuck string {M/Wt.: 78 lbs/cft (HPM)}
Worked on stuck string in the range 60-210 T. WLD attempted to severe drill-string at 3461.8 m by using 2” DCST tool, without success. Tried to establish
circulation without success. Working on stuck-string. {THD at 3646.7 m MD (3298.5 m TVD) is 1342.5 m (1344.6 m) towards N70.8°W (N70.8°W); D/A: 34.6°
(34.3°) (M/s Baker Hughes)}.
[Fwd. Loc.HXR (Sesabil); IP→ Civil work completed as per VFD rig, foundation to be modified for CH-1. 3rd Rev. LAF-3 issued]
CH-2 (Quippo-1)
KUBB Dev S 634/655.5 Kumchai-19 3726/3736 149 183 17.09.2021 Kumchai, Kumchai-7P
New#
Transferred loads: 15 nos (cumm: 67) to fwd. Loc. BJN. ILM started on 20.03.2022. (Rig released at 9 am of 17.03.2022).
[Fwd. Loc. BJN (Baghjan); BGN-25/26/27-BJN-BJO-BJQ→ Civil work completed]
CH-3 (Quippo-2) SDYA
Exp V - Sadiya-1 4500/ 124 53 03.02.2022 Sadiya,IP
New# (Phase-I)
Depth: 2603 m, Prog: Nil, P/Ops: R/in casing (M/Wt.: 73 lbs/cft)
POOH bit from 35 m. R/in 13.3/8” casing to 1242 m.
[Fwd. Loc. KUBF (Kumchai); Common plinth of KMC-11-KUBF-KUBG→ LAF-3 issued on 16.06.2021. Civil work in progress]
CH-4 (SINDHU)# BJC Exp J 943.8/ South Baghjan-5 4155(R)/ 120 150 29.10.2021 BJC-BJB Plinth
Depth: 3945 m (B-hole) (A-hole: 2425 m, KOP: 1000 m) (KOP for side-track B-hole: 2212 m), Prog: 17 m, P/Ops: A/for R/in bit (M/Wt.: 78 lbs/cft)
Drilled 3928-3945 m. Observed poor ROP. C&C mud. POOH bit. A/for R/in new bit. {THD at 3919.2 m MD (3768.7 m TVD) is 885.5 m (883.5 m) towards
N75.5°W (N75.5°W); D/A: 14.5° (14.7°) (M/s. Halliburton) (B-Hole)}.
[Fwd. Loc. BJB (South Baghjan); Common plinth of Loc. SBJ-5-BJB→ Civil work completed]
CH-5 (FORESIGHT)
TBP Exp J 930.7 South Baghjan-6 4324/ 120 84 03.01.2022 S. Baghjan, SBJ-3/4P
#
Depth: 3950 m (KOP: 2152 m), Prog: 36 m, P/Ops: Circulation (M/Wt.: 77 lbs/cft)
Drilled 3914-3950 m. Observed poor ROP. Circulating prior to P/out for bit change. {THD at 3934.3 m MD (3755.2 m TVD) is 749.8 m (747.8 m) towards N69.
2°W (N70.9°W); D/A: 27.8° (27.9°) (M/s Baker Hughes)}.
[Fwd. Loc. TBL (S. Baghjan); SBJ-3/4/6-TBL-TBO common plinth→ Civil work completed]
CH-6(Quippo)
BJK Dev J 1017/ Baghjan-28 4200/ 114 93 25.12.2021 Baghjan, BGN-3/20P
New #
Depth: 4094 m (KOP: 1500 m), Prog: Nil, P/Ops: Attending engine malfunction (M/Wt.: 77 lbs/cft)
Attending engine malfunction. {THD at 4077 m MD (3880.5 m TVD) is 965.1 m (967.9 m) towards N28.4°W (N28.5°W); D/A: 22.8° (23.6°) (M/s Baker
Hughes)}.
[Fwd. Loc. KUBC (Kumchai); Kumchai-6/16 plinth→ Civil work completed, foundation modification in progress]
DM-5** WDW-202 S 150/ /MMC 1435/ 25 22 06.03.2022 Nahorkotiya, NHK-175P
Depth: 1436 m (KOP: 560 m), Prog: Nil, P/Ops: A/for R/in bit (M/Wt.: 68 lbs/cft)
R/in bit with stabilizers (at 9 & 18 m) from 135 m to bottom. C&C mud. P/out bit upto 135 m (9.5/8” casing shoe at 153 m). Operation suspended from 6 pm of
28.03.2022 to 6 am of 29.03.2022. A/for R/in bit. {THD at 1283.8 m MD (1266.5 m TVD) is 147.6 m (146.9 m) towards N44.9°E (N45.0°W); D/A: 4.5° (3.8°)
(M/s NEWSCO)}.
[Fwd. Loc. WDW-210 (NDM-1P)→ Civil work completed]

Exp: Exploratory, Dev: Development, Apr: Appraisal, (R): Revised, R/up: Rig-up, EDS: Expected Date of Spudding, EDC: Expected Date of Completion; CHH: Casing Head Housing, IRD: Independent Rotary
Drive, TBR:Tie-Back Receptacle. VDS: Vertical Drilling System, RAL: Radial Analysis Bond Log, STAR: Simultaneous Acoustic Resistivity Image, SWPA: Swivel Wash Pipe Assembly,**E-750 HP rig.*E-1400 HP
rig. #E-2000 HP rig, SDMM: Steerable Downhole Mud Motor, PLC :Programmable Logic Controller, PCL: Pipe Conveyed Logging. LTSA: Locator Tubing Seal Assembly, CI: Corrosion Inhibitor, PHPA: Partially
Hydrolyzed Polyacrylamide; PCR: Power Control Room. ZREAC: Zonal Research & Extension Advisory Committee, HMI: Human Machine Interface, TAG: Throw Away Gun. SCR: Silicon Controlled Rectifier, HPU:
Hydraulic Power Unit. Ŵ: Window cutting wells, FB: Flat Bottom, RCJB: Reverse Circulation Junk Basket. LCP: Live Condition Perforation. CIT: Casing Integrity Test, RRV: Reset Relief Valve. NDDF- Non
Damaging Drilling Fluid; I-BOP: Internal Blow-out Preventor; CIT: Casing Integrity Test; MP-1: Mud Pump-1; DP: Drill Pipe; O/up: Open up; EC: Eddy Current; (R): revised; HLS: Halliburton Services; HWDP:
Heavy Weight Drill Pipe; RLA: Rotating Link Adapter; DCST: Dril Collar Severing Tool, SRV: Safety Relief Valve; FPI: Free Point Indicator, PTU: Pressure testing Unit, THP: Tubing Head Pressure, HSD: High
Speed Diesel, Inj: Injector; LCM: Loss Circulation Materials; MCC: Magnesia Cross-linked Cement; CP: casing pressure; RCI: Reservoir Characterization Instrument; IFX: Insitu Fluid Explorer, FDZ: Freshly
Drilled Zone; PCL: Pipe Conveyed Logging, ERPG: Electronic Reservoir Pressure Monitoring Gauge; F/C: Float Collar; S/C: Stage Collar; FOSV: Full Opening Safety Valve, NIFA: Non Invasive Fluid Additive.