Item
No Description Unit Qty Unit price Total price
1 Earth work
1.1 Administration room
Trench Excavation for foundation and footing pad to the levels and
axis ( depth not exceeding 1.5 m) and Cart away surplus excavated
material to a distance 0.5km m3 928.00 180.00 167,040.00
1.2 Library
Trench Excavation for foundation and footing pad to the levels and
axis ( depth not exceeding 1.5 m) and Cart away surplus excavated
material to a distance 0.5km m3 443.52 180.00 79,833.60
1.3 Laboratory
Trench Excavation for foundation and footing pad to the levels and
axis ( depth not exceeding 1.5 m) and Cart away surplus excavated
material to a distance 0.5km m3 549.05 180.00 98,829.00
1.4 Class Room
Trench Excavation for foundation and footing pad to the levels and
axis ( depth not exceeding 1.5 m) and Cart away surplus excavated
material to a distance 0.5km m3 876.40 180.00 157,752.00
1.5 Work Shop
Trench Excavation for foundation and footing pad to the levels and
axis ( depth not exceeding 1.5 m) and Cart away surplus excavated
material to a distance 0.5km m3 216.75 180.00 39,015.00
1.6 Toilet
Trench Excavation for foundation and footing pad to the levels and
axis ( depth not exceeding 1.5 m) and Cart away surplus excavated
material to a distance 0.5km m3 552.00 180.00 99,360.00
Total 641,829.60
Vat 96,274.44
Total hour (hr) = 48:00:00 0:00:00 0:00:00 0:00:00 0:00:00 48:00:00 48:00:00
Maintenanc
Effective Intersite Total Payable Hourly Rental
Machenery Type/ Operator Down Force Payable Payable e & Oil Net Amount
No Description Model
Plate No.
Name
working Idle Time Mobilizat
Time majoures
contact
Time
Time
Time (hr)
Cost [Birr/hr]
Consumed [Birr]
hour ion hour (day) + Fuel
Price (Birr)
1 Loader Keder 48:00:00 0:00:00 0:00:00 0:00:00 0:00:00 48:00:00 48:00:00 2.00 48.00 1,650.00 79,200.00