You are on page 1of 16

Save Your Answer

© wthly
hat is the monthly capacity of the unit producing C if the company doesn 1
the nearest integer)?
Save Your Answer
Save Your Answe
ng the cumulative approach in estimating the
= forec
forecaste
demand value to the next integer) in min naam d
3 The company scored a new location in a 10 point rating scale and the scores are as follows:

Availability of proficient labor - 7


Availability of electricity - 8
Proximity of the plant from mother plant - 6
Road condition near the entrance - 9
Availability of water - 5

What is the overall factor score of that new location (answer n two decimals) out of 10?

7.15

Save Your Answer


What is the Average WIP for Product D? Write your answer in two decimals.

3.93
Save Your Answer
(25.72

WE mest meleis
if the company is following the cumulative approach in estimating the forecasted value, what is the utilization of the

unit producing D (Take the forecasted demand value to the next integer) in percentage (answer up to 2 decimals)
considering the full overtime available?

80,15

Di Ft)

22-01-2021
7 The worker involved in cutting process of unit used for product A works very fast and has a performance rating of 1.8.
Moreover, the allowance in such job is generally 10% of the job time which this worker does not take at all. What is
the standard time for cutting process for product A (answer with a precision of 2 decimals) in hrs?

35.64

Save Your Answer


ONo | Question

6 The company went for a line balancing for the product B and to avoid the precedence related constraint, they are
even ready for U type line balancing if required. What will be the maximum LB ratio or LB efficiency of such line (if U
is NOT required, you may go for straight line balancing also but if required you can go for U as well) in percentage
(answer up to the 2nd decimal)?

84

Save Your Answer


otart Time: 11:17:51 Current Time: 11:33:45 Time Left
ae . :
— FRER ER
ER R
rR Ree
What is the monthly capacity of the unit producing A if
the company does not use the overtime a
answer in two decimals because p artial production of A is allow
ed during any month)?

5.40
SP delle telat
LOR EF Part & The case
x wy (AR fithe fie tile) Cheneghet Gime x " rf

ibiscus xub eduin/ Hil

Quiz: OM 1 ET Part B
Start Time: 11:19:25 Current Time: 11:41:10 Time Left: 33:1

Pace ERERER
ERTRERT
CRR CRE
OR Oe ose)
y
the company ts Smite ne
following the
the cumulative
cumulative j ipproach ine stimating the forecasted value, what AKT
is the Ti TIME or

@ ee rast jemand value to the next inte ger) in min considering the full overtime
ng the cumulative approach in estimating the
= forec
forecaste
demand value to the next integer) in min naam d

You might also like