How does an NPTEL 1) A single axis galvanometer with a range of ± 20° is used in a SLA process. The laser beam deflected form galvanometer passes through a flat – field
online course work? () lens to keep the focal point at distance of 500 mm on the top of the resin surface. What will be difference between the maximum and minimum angular velocity
of the galvanometer in order keep the constant velocity of the laser beam spot to 5 m/sec.
Week 0 ()
Quiz: Assignment-05
(assessment?name=162)
5) Select the correct statement/s, in the context of AM machines using galvanometer based laser scanning system: 1 point
The build area is limited due to the small size of the telecentric lenses
The build area is limited due to the small size of the deflecting mirrors
Increasing the distance between the galvanometer and resin surface will increase the build area
Increasing the distance between the galvanometer and resin surface will decrease the build area
6) The figure shows cross sections of two elliptical cylinders to be manufactured separately by a 3D system’s SLA. In recoating cycle, if the time 1 point
required for Deep Dipping in any layer the object (i) and (ii) are Ti and Tii respectively then which of the following statement is correct:
Ti = Tii
Ti = Tii /4
Ti = Tii/2
Ti = 2Tii/3
No, the answer is incorrect.
Score: 0
Accepted Answers:
Ti = Tii
7) In the context of the recoating cycle in 3D system’s SLA process, put the following steps in right order: 1 point
· Z-wait
· Obtaining Build Position
· Deep dipping
· Levelling
· Elevating
· Sweeping
8) Which of the following graphs represents the relationship between recoating time and deep dipping height? 1 point
9) In the context of a 3D system’s SLA process. What should be the gap between the doctor – blade (or sweeping blade) and the prebuild layer in 1 point
order to obtain 6 μm thickness of the layer ?
5 μm
25 μm
12 μm
125 μm
N h i i
No, the answer is incorrect.
Score: 0
Accepted Answers:
12 μm
10) In the context of re-coating cycle of a 3D system’s SLA process, the waiting period required to fade away the visible crease at the solid to liquid 1 point
interface is known as _____ .
G-wait
CG-wait
Z-wait
ZG-wait
11) In the context of 3D System’s SLA, the following statement/s______________ is/are correct. 1 point
Curtain method (Zephyr) can provide thinner layers as compare to deep dipping method
Curtain method (Zephyr) is a faster recoating method compare to deep dipping method
Curtain method (Zephyr) can provide thicker layers as compare to deep dipping method
Curtain method (Zephyr) is a slower recoating method compare to deep dipping method
12) Two objects shown in Figure 1a and 1b are manufactured by 3D system’s SLA. In the recoating cycle, if the time required for Deep 1 point
Dipping in the layers at same Z-height in object ‘a’ and ‘b’ are ta and tb respectively then find out the ratio ta /tb
1
0.04
25
0.4
13) Two objects shown in Figure 1a and 1b are manufactured by Envisiontec’s Perfactory. What will be the ratio of build time for both the objects TBa /TBb? 1 point
1
0.04
25
0.4
14) In the context of the photo-polymerization based liquid AM system of Envisiontec’s Perfactory, put the following steps in right order: 1 point
· Waiting
· Peeling
· Exposure
· Levelling
15) Which of the following photo-polymerization based liquid AM system is found to be efficient in manufacturing a hollow spherical object? 1 point
16) In the Envisiontec’s Perfactory a DMD of resolution 2,048×1024. If the working area (build area) is 300×200 mm2. Find out the resolution of the machine 1 point
(in mm) at maximum work area setting.
1.4648
0.169
146.48
1464.8
17) In the Envisiontec’s Perfactory like AM system, a thin layer of ___________ is maintained above silicon window to avoid its direct physical contact with 1 point
the cured layer.
Oxygen
Hydrogen
Argon
Helium
18) Which AM process uses the water-soluble gel as support material? 1 point
Envisiontec’s Perfactory
Objet’s Polyjet
Autostrade’s E-Dart
3D System’s SLA
No, the answer is incorrect.
Score: 0
Accepted Answers:
Objet’s Polyjet
19) Select the correct option in the context of Autostrade’s E – Dart: 1 point
20) In the context of the Solid Ground Curing (SGC), put the following steps in right order (1 to 8): 1 point
1. UV lamp turned on
2. Creation of Photomask
3. Final Curing through high power UV lamp
4. Removal of uncured liquid
5. Photo- mask placed
6. Face Milling
7. Wax recoating
8. Resin Coating
2à8à5à1à4à7à6à3
2à8à1à5à7à4à6à3
1à8à5à4à3à7à6à2
1à8à5à2à4à6à7à3
No, the answer is incorrect.
Score: 0
Accepted Answers:
2à8à5à1à4à7à6à3