Professional Documents
Culture Documents
0 MW
Innovating for reliability
G128-4.5 MW
G128-5.0 MW
G132-5.0 MW
G128-5.0 MW Offshore
G132-5.0 MW Offshore
Innovation
& Reliability
Once again, Gamesa has demonstrated that it
has the knowledge, experience and resources
INDEX needed to develop wind turbines capable of
extracting maximum power from the wind.
CHINA INDIA
Offers superior reliability: Optimizes cost of energy (CoE): Nacelles, generators and convertors. Nacelles, blades and towers.
More than 3,500 MW installed by Gamesa. More than 1,100 MW installed by Gamesa.
4
Nacelle and blades modular design focused on Higher production for projects with limited space.
minimizing inactive time.
Versatile platform
Gamesa has applied design and validation product reliability must be assured from
concepts to its new wind turbine the first day in operation.
development that are only comparable to
6 7
those used in such demanding industries Gamesa 5.0 MW is the result of the
as the aeronautical industry, where evolution of Gamesa technology.
Model G128-4.5 MW G128-5.0 MW(1) G132-5.0 MW(1) G128-5.0 MW Offshore G132-5.0 MW Offshore
Tower Heights 81, 95, 120, 140 m 81(2), 95, 120, 140 m 95, 120, 140 m 80-94 m + project specific Project specific
Type Certificate IEC and DiBT Certificates In process In process IEC Certificate In process
(3)
Env. / Opt.
50 Hz/60 Hz
Track Record 16 (4) (5) 1 -
Gamesa 5.0 MW: (installed units as of end 2013)
Greater size
for greater production 5000
Power
4500
4000
3500
2500
Maximum production 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
68 storeys
8 9
G132
G128
140 m
G114
G97
G90
G87
G80
G58
G52
First prototype
Gamesa Offshore wind turbines have been designed to Gamesa Offshore wind turbines are designed to increase the time Gamesa has installed more than 28 GW in all types of Gamesa own wind expertise has been complemented
adapt perfectly to the conditions of any offshore site. These intervals between planned maintenance visits and to minimize environments all over the world and leverages a unique specifically for the harsh marine environment through
conditions can be highly variable and sometimes extreme the instances of unplanned maintenance. Gamesa ensures this knowledge base in its activities. Gamesa has integrated its cross-sector collaboration: the Gamesa Offshore wind
due to adverse weather and the harsh marine environment, through manifold proven means, including comprehensive testing more than two decades of experience in the development, turbines have been developed with experienced, renowned
which makes access to the wind farm difficult. and validation of mechanical and electrical systems, the modular manufacture, installation and maintenance of wind turbines leaders from the naval industry meeting defense-level
design and the use of advanced predictive/diagnostic systems. in its latest generation of state-of-the-art offshore wind standards of reliability.
The advanced technology utilized in the Gamesa Offshore technology.
wind turbines assures high reliability, boosts energy In addition, the Gamesa FlexiFit® self mount add-on crane, makes This collaboration addresses some of the market’s
production, reduces maintenance, minimizes downtime, the logistics and maintenance at offshore sites easier, faster and G128-5.0 MW Offshore and G132-5.0 MW Offshore combine main concerns, such as cost-efficient civil engineering
and ultimately maximizes the profitability of each project. less costly by avoiding the need for specialty vessels and high breakthrough innovation with validated and reliable infrastructures, wind turbine reliability, low maintenance
tonnage cranes. technologies to deliver competitive energy costs and optimal needs and reduced energy costs.
profitability throughout the entire lifecycle of the wind farm.
Gamesa 5.0 MW > Discovering Gamesa 5.0 MW
The innovative sectioned blade is manufactured The electrical system for the Gamesa 5.0 MW
using a combination of materials in a pioneering is based on a permanent magnet synchronous
structure that reduces weight. Current tooling and generator and a full converter. Gamesa GridMate®
equipment used to transport 2-MW models to the is comprised of four modules that operate in
site are also suitable for the Gamesa Innoblade®. parallel which allows partial-load operation in the
Gamesa’s new aerodynamic profiles reduce noise event of individual failure, and complies with the
and maximize production. most demanding grid connection requirements.
Gamesa MultiSmart®
Advantages of the
control system incorporates the most advanced
technologies to reduce noise, based on optimizing
aerodynamics and control.
Gamesa
Individual pitch and multivariable control minimize weight, loads and noise. 13
12
Sectional blade for easy transport and installation.
odular design of the nacelle and blades for maximum reliability and easy
M
assembly and maintenance.
Add-on crane, coupled
to nacelle, capable of
dd-on crane attaches to nacelle for assisting in the assembly and maintenance
A assembling the main
of the main modules.
modules.
erodynamic blade design and the Gamesa NRS® control system minimize
A
Gamesa CompacTrain®
noise emissions.
The 5.0 MW drive train designed Gamesa FlexiFit® is used for on-
amesa WindNet®: the advanced SCADA technology for online wind farm
G
by Gamesa consists of a semi- site assembly and servicing of large
control and monitoring.
integrated main shaft and a components. Its main advantage is that
2-stage gearbox with mid-speed it is coupled to the nacelle and requires
Gamesa SMP System: system for predictive maintenance.
Technology developed
Tower range output. This integrated no additional external structure. In many
design makes the unit more situations, it is an alternative to the use of
Several tower options compact, with fewer components. heavy cranes. It requires no special means
entirely by Gamesa
available, using the Furthermore, elimination of of transport to be moved and consists
appropriate materials high-speed rotating mechanical of several modules assembled at ground
and technologies to offer components and use of the level. Once Gamesa FlexiFit® is fixed to the
optimized solutions for mid-range speed output improves nacelle, the main components of the wind
State-of-the-art wind turbine design and development each project. the turbine reliability. turbine can be raised and lowered.
Gamesa 5.0 MW > Discovering Gamesa 5.0 MW
5.0 MW
the National Renewable Energy Centre (CENER, Spain), for additional resources other than those already used
one of the most highly qualified international technology for the Gamesa 2.0-2.5 MW wind turbine. The longest
centers specializing in applied research, development and module is no more than 35 meters long. Furthermore,
promotion of renewable energies. lifting the nacelle is the final step in the assembly
requiring a heavy-tonnage crane. The remaining
ore than 300,000 hours of validation and test
M modules only require the help of a small auxiliary crane
engineering. for assembly.
Gamesa 5.0 MW > Discovering Gamesa 5.0 MW
Predictive maintenance system Preventive maintenance The Gamesa GridMate® is the solution for the Gamesa 5.0 MW platform that assures
16 optimum grid connection. The system uses a permanent magnet synchronous 17
The Gamesa SMP-12, the predictive maintenance system RCM (Reliability Centered Maintenance): This reduces the generator with independent modules and a full frequency converter. This solution
is an essential tool for advanced detection of potential time spent on preventive maintenance tasks. allows the most demanding grid code connection requirements to be met.
deterioration or faults in the main wind-turbine components.
Automatic lubrication system.
Gamesa SMP-12 is the result of an analysis of a large Optimum performance at variable speed at any wind speed. Increased production.
number of wind turbines to identify the essential
requirements with which a predictive maintenance system Corrective maintenance: De-coupling between the mechanical part and the grid, thus preventing grid
disruptions from affecting the machine. Increased production.
must comply:
NLS (Nacelle Lower Structure): Nacelle lower structure
Active and reactive power control through conversion of all the
Continuous control of critical wind turbine components. allowing more space for servicing tasks to be performed. Greater adjustment capacity.
power generated.
Signal processing and alarm detection capacity.
Integration in Gamesa Windnet®. Easier replacement of large components: there is no Improves efficiency at partial loads by optimally using the individual power
Easy installation and maintenance. need to disassemble the rotor to change the Gamesa modules in the converter. Superior output.
Low cost. CompacTrain®.
Smooth connection and disconnection from the grid.
Compliance with grid connection
The system is designed to minimize corrective operations. requirements.
Gamesa SMP system consists of a device located in the NLS
BLADES
Number of blades 3 3
Material Organic matrix composite reinforced with fiber glass Organic matrix composite reinforced with fiber
or carbon fiber glass or carbon fiber
TOWER
GEAR BOX
GENERATOR
Type Permanent magnet synchronous generator with Permanent magnet synchronous generator with
independent modules in parallel independent modules in parallel
Frequency 50 Hz / 60 Hz 50 Hz / 60 Hz
Protection class IP 54 IP 54
Power factor 0.9 CAP - 0.9 IND * 0.9 CAP - 0.9 IND *
In order to minimize the environmental impact, this document has been printed on paper made from The present document, its content, its annexes and/or amendments has been drawn up by Gamesa
50% pure cellulose fiber (ECF), 40% selected pre-consumer recycled fiber, and 10% post-consumer Corporación Tecnológica, S.A. for information purposes only and could be modified without prior
deinked recycled fiber inks based exclusively on vegetable oils with a minimum volatile organic notice. All the content of the Document is protected by intellectual and industrial property rights
compound (VOC) content. Varnish based predominantly on natural and renewable raw materials. owned by Gamesa Corporación Tecnológica, S.A. The addressee shall not reproduce any of the
information, neither totally nor partially.