14 13 12 3a 4
11 4a 10 9 8 7 6 5 4a 4 3a 3 2 1
ground level
r.c staircase with galv. m.s. r.c staircase with galv. m.s.
railing railing
to engr's detail to engr's detail
riser : 175.00 @ 18 nos riser : 175.00 @ 18 nos
tread : 255 + nosing tiles tread : 255 + nosing tiles
ELEVATION A
scale 1:100
1 2 3 3a 4 4a 5 6 7 8 9 10 4a 4
11 3a 12 13 14
ground level
ELEVATION B
scale 1:100
A B C D D C B A A B C D
project :
FASA 2
150mm thk. brickwall with
provide 20mm wide upvc groove
line to minimize plaster crack W5
plastering on bothsides I) SEBUAH BANGUNAN PUSAT DATA 3 TINGKAT;
6000
6000
alum. frame top hung
alum. frame top hung
II) 2 UNIT RUMAH PAM;
600
5000
FD1
window to manuf'rs detail window to manuf'rs detail
W6 W6 W6 W6 W6 W6
150ø upvc r.w.d.p FD3 m.s. door to manuf's detail III) 2 UNIT PONDOK PENGAWAL;
2400
IV) 1 UNIT RUMAH SAMPAH;
2100
230mm thk. brickwall with FD3
plastering on bothsides CORRIDOR REMOTE SWITCHING ROOM AC LEDGE 900 mm ht. galv. m.s.
first floor level first floor level first floor level railing to detail V) 4 UNIT STRUKTUR PELETAKAN JANAKUASA
450mm r.c. copping to engr's
detail
alum. frame louvered window 150ø upvc r.w.d.p DI ATAS SEBAHAGIAN PTD 109033, MUKIM KULAI,
3600
3600
with anti-vermin alum. wire
3150
150
150
ground level ground level ground level UNTUK
25°
c/w door handle & lockset r.c staircase with galv. m.s.
railing
to engr's detail
SIPP POWER SDN BHD
riser : 175.00 @ 18 nos
tread : 255 + nosing tiles
developer :
ELEVATION D ELEVATION C ELEVATION Y-Y 'Saya / kami sebagai tuanpunya tanah bagi lot berkaitan telah bersetuju terhadap kesemua kompenen
dan susunan yang terkandung dalam pelan ini'
scale 1:100 scale 1:100 scale 1:100 'Saya / kami berjanji bahawa saya / kami akan mematuhi kehendak-kehendak Akta Keselamatan dan
Kesihatan pekerjaan 1994 sepanjang perlaksanaan projek ini dan saya / kami akan menerima
tanggugjawab penuh dengan sewajanya'
1 2 3 3a 4 4a 5 6 7 8 9 10 4a 4
11 3a 12 13 14
600
W6
LVAC ROOM W6
window to manuf'rs detail
4242
2100
W5 W5 W5 W5 W5 W5 W5 W5 W5 W5
FD3 D5 LEMBAGA
...............................................................................
W4 W4
2400
2400
ARKITEK
REMOTE COMM. MALAYSIA Ar . Neo Kim Cheng
CORRIDOR 275KV CONTROL ROOM 33kV GIS ROOM 1 SWITCHING 33kV GIS ROOM 2 33kV GIS ROOM 3 33kV GIS ROOM 4 CORRIDOR 150ø upvc r.w.d.p ARKITEK
ROOM
900
600
600
W1
SDN BHD
3600
D1 D1 D1 D1 D1 D1 D1 D1 D4
2100
1800
1800
1800
title :
CABLE CELLAR 1 m.s. door to manuf's detail
CABLE CELLAR 2 CABLE CELLAR 3 CABLE CELLAR 4 CABLE CELLAR 5
ground floor level TOILET ELEVATION A, B, C & D
150
ground level
SECTION X - X & SECTION Y - Y
ELEVATION X-X
scale 1:100
FOR BP SUBMISSION
date : December 2021 drawn : sf / pang
DCA / I / YNJDC BP / 03