The YA Type Round Vibratory Screen
1. Uses
The YA type round vibratory screen is mainly applicable to those
industries such as coal, metallurgy, mines, thermal power plants, building
materials, quarry, light industry, chemical engineering and others, which
is a high efficiency screening machinery for grain size classification for
those materials in bulk such as coal, ore, coke and others.
2. Operating principle and design features
This vibratory screen is driven by a vibrator of eccentric mass via a
triangle rubber belt of the motor, to cause the screen box vibrate, the
moving locus of which is round.
This vibratory screen consists of a screen box, a vibrator, a damper
of springs and a supporting frame. As shown in Figure 1, the screen box
is of frame-type configuration, which is connected by rivets in groove
rings and which is of advanced design, solid and durable. The vibrator
consists of an eccentric shaft plus an eccentric block, with adjustable
amplitude of vibration. For the damper of springs it consists of the
steel-made spiral springs.
-2-
3. Explanation for the meanings of type numbers
2 Double decks (No type No. for the single deck)
Y Round moving locus
A Shaft eccentricity
H Heavy duty (No type No. for the light duty)
g Improved design
XX Width of screen face (dm)
XX Length of screen face (dm)
4. Erection, adjustment and running
4.1 Before erection ,check the fittings with the packing list to see if they
are complete and in good order or damaged, of which the vibrator
must be dismantled and reassembled with clean lubrication oil (after
removing the dirty lubrication oil ) if the vibrator has exceeded six
months since the day it was shipped from the factory.
4.2 Erection is carried out according to the erection diagram. The
supporting frame must be installed horizontally on the foundation,
which should have sufficient rigidity and strength to bear the whole
dynamic load and the whole static load of the vibratory screen.
4.3 At the four corners of the screen box there are 4 ears, one at each
corner. At the four corners of the support frame there are 4 hoist holes,
also one at each corner. As shown in Fig.1 the whole screen is not
permitted to be hoisted by directly hooking the ears.
4.4 Ensure there is 75 mm minimal clearance between the screen box and
the non-moving parts such as the hopper and bin.
4.5 Ensure that there is 10 mm clearance between the spring seat and the
friction damping board on the screen box according to Fig.2.
4.6 The damping springs can be chosen and installed as per the free
height to cause the springs at the left and right sides of the frontal end
or the rear end to get even as per free height, with error less than 5
mm. After the screen box is placed thereon, the surface of screen
must be kept horizontally between both the right and left sides.
Otherwise, the thin iron shims can be inserted between the spring seat
and the support.
-3-
Fig.2 Spring damper
301. Damping spring 302. Positioning 304.End cover 305. Damping block
306.Damping spring 307. Upper sub-seat of springs 308. Bolt
309. Trunnion of the screen box
4.7 The springs must be kept in verticality and the upper sub-seat of springs
must be kept in horizontality with the contact face of the springs. After
adjustment, the upper sub-seat of springs is fixed with bolts on the
trunnion of the screen box, which will become one by spot welding.
4.8 For the driving direction you stand at the feeding end, facing the flowing
direction of the materials and watching the position of the motor so that
you can drive it leftwards or rightwards. In changing the driving direction,
you can dismantle the rubber belt pulley of the vibrator from the balance
wheel and fix it again on the balance wheel at the other side.
4.9 Ensure that there is sufficient amount of adjustment for the tension of the
triangle rubber belt and ensure that the corresponding grooves of both the
rubber belt pulleys are corresponding with each other on their room own
plane.
4.10 After installation and adjustment an idle trial running should be carried
out for not less than two hours to reach stable running, without abnormal
noises and to meet the requirements for the amplitude of vibration and
the moving locus, with the maximal temperature not above 75℃for the
bearings.
4.11 Before trial running you must turn the vibrator by hand or in other ways.
You can start up the machine formally only when it is turning smoothly
-4-
without any hindrance.
5. Lubrication
5.1 For the lubrication of the bearings of the vibrator the diluted oil is used.
The oil will be changed after it works for 40 hours for first time in
operation. And thereafter the normal operating cycle is 800 hours
approximately.
5.2 For the quantity of oil injected into the vibrator, it depends on the size of
the vibrator. As shown in Table 2, if there are small quantities of oil drops
that drop out consecutively after taking out the oil-level inspection rod as
per Fig.7 then it indicates the oil quantity is correct. And in case there is a
large quantity of oil that overflows, then it indicates the oil level is too
high.
Oil Quantity List
Table 2
Width of screen area(mm) 1225 1530 1835 2140 2445
Oil quantity (Metric Liter)
Type No. of Vibrator
YA110 4、8 5、7 6、6
YA140 7、8 9、5
YA170 19 22
Direction of Direction of
the moving ore the moving ore
-8-
Fig.4 Tightened Device for the screen mesh
201 Damping rubber rods 202 Support for the screen face 203 lateral board of the screen box
204 Tightening bolt 205 Guiding angle steel bolt 206 Double-hole cushioning board
207 Guiding angle steel 208 Tightening board 209 Screen mesh
7.12 In changing the woven net and the screen mesh an equal clearance
should be ensured between the two lateral boards of the screen box and
the hooks of the screen mesh. In the first place, tighten the intermediate
pressurized flat steel and tighten the tightened boards at the two sides
simultaneously to keep the surface tension of the screen mesh evenly.
And knock at it lightly with hand hammer along the whole length to
check up the tightening conditions. In case the contact is not good or the
tension is not enough or uneven, it will cause the screen mesh to get
damaged too earlier.
7.13 The guide angle steel of the tightening board is adjustable. In installing
the screen mesh the guiding angle steel bolt should be loosened in the
first place to cause it to move upwards and downwards. After the screen
mesh is placed appropriately, give the tightening board a slight pressure
by the tightening bolt and then turn the guiding angle steel until the
screen mesh rests tightly against the support frame of the screen face and
then screw up the guiding angle steel bolt.
7.14 In order to tighten the screen mesh appropriately, the length of the hook
bar of the screen mesh must have the same length as the tightening
board.
7.15 In case the diameter of the mesh is less than 16 mm, the screen mesh
requires 20 mm more in length for lapping at one end, as shown in Fig.5.
-9-
(For each screen face there is a piece of screen face without outside lap in
length at the discharge end).
7.17 For the dismantled fittings you must wash them clean one by one and
check up them carefully. In case of finding out any damages, you should
repair them timely or change them.
7.18 Assemble the vibrator according to Fig.7 .
7.18.1 It must be carried out under clean and tidy operating environment
- 10 -
whilst all the fittings for assembling must be washed clean , removing
all the burrs, without any damages that will affect the performance of
the whole machine.
7.18.2 It is not permitted to knock directly at the fittings with big hammer or
to assemble the fittings by compulsory means.
7.18.3 It is only after all the bolt holes are aligned correctly that they can be
screwed up tightly.
7.18.4 In case one bearing is damaged , then usually it will affect another
bearing and cause it to get damaged. Therefore, all of them should be
changed simultaneously.
7.18.5 In assembling the bearings , there is a” sill” on the inner surface of the
spring seat hole for the type YA110 or YA 170 bearing seat. The
bearing should lie against the lateral face of the sill, whilst the seat
hole is a thorough hole for YA110 type bearing seat and bearing
should be 6 mm distant from the outer surface.
7.18.6 The correct method for installing the “O” type sealing ring is to let the
sealing ring roll into the circular form.
7.18.7 In installing the bearing seat you must ensure that the oil plug is at the
bottom of the bearing. For convenient installation you may use two
long bolts to pull the bearing seat into the hole of the bearing sleeve.
7.18.8 A sealing cushion is installed at the sealing board to ensure this
cushion will not cover the groove of the returned oil for checking up
the oil level.
7.18.9 The oil in the labyrinth groove between the sealing board and the
isolating ring should be made become grease as much as possible.
7.18.10 In installing the sealing board on the bearing seat you should ensure
the hole for checking up the oil level is at the bottom of it.
7.18.11 After fixing the shaft in the vibrator you must check up the axial
moving distance, which should be between 2 and 4 mm.
7.18.12 Ensure the correct quantity of oil and tightening of the bolts.
- 11 -
Table 4
Series No. Series No.
Name Qty. Name Qty.
No. of part No. of part
1 103 bearing 2 9 Triangle rubber belt 1
2 114 Bearing seat 2 10 201 Damping rubber rod 1
3 115 High-strength bolt 1 11 204 Tightening bolts 1
4 118 O type sealing ring 2 12 208 Tightening board 1
5 119 O type sealing ring 2 13 209 Screen mesh
6 120 Vent plug 2 14 301 Damping spring 1
7 121 Vent cap 2 15 305 Damping block 4
8 124 Oil sealing 2 16 306 Damping spring 4