JOB SAFETY ANALYSIS (JSA)

TANK MODIFICATION AND REPAIR WORK

JSA Number:  DES‐PRL‐K.K ‐JSA‐001  JSA Title:  Coating and Raping activity   


Area:  Korangi and Keamari PRL Tanks  Activity:  Coating and raping activity in side and out side tank  Date  5/12/2012 

Task Description  Coating and raping activity in side and out side tank 
      Uncontrolled    Residual Risk 
Risk 
Step  Activity  Hazard  H  M  L  Control Measures  H  M  L 
1.  Site preparation  • Poor communication between    M    • DESCON employees shall have mandatory training.      L 
  work parties.   • Work permit from the client, with all concurring parties signatures 
  approval must be obtained prior to start of work and display at site 
    • Safety requirements stated on the work permit must be available on site 
  and strictly followed 
• Inexperience persons / lack of  • Toolbox talk shall be conducted to all personnel on site & documented 
safety awareness  before start of work. 
  • Appropriate PPE shall be worn by all personnel at site.  
  • Assigned trained dedicated Banks man for job with reflective jacket. 
  • No water no work policy shall be followed. 
  • Work Schedule according to heat Index 
• Heat stress  • Ear protection shall be worn where required.  
  • Noise meter will be made available at site. 
• Noise   • Maintenance of equipment on regular basis. 
  • Use of Approved/Trained license  drivers. 
• Vehicles Movement  • Vehicle movements on site shall be controlled by banks man 
• Appropriate signage to be provided. 
2. Confined space  • Lake of Communication  H      • All personnel working in confined space must have      L 
entry.    confined space training. 
    • PRL confined space procedure shall be followed.  
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR WORK

JSA Number:  DES‐PRL‐K.K ‐JSA‐001  JSA Title:  Coating and Raping activity   


Area:  Korangi and Keamari PRL Tanks  Activity:  Coating and raping activity in side and out side tank  Date  5/12/2012 

Task Description  Coating and raping activity in side and out side tank 
      Uncontrolled    Residual Risk 
Risk 
Step  Activity  Hazard  H  M  L  Control Measures  H  M  L 
  • Hole watcher is attentive all the time during confined 
• Ventilation.  space activity. Lighting provided in CSE to be 24V. 
  • Easy communication between hole watcher and supervisor 
• Damage material   is established all the time. 
  • Ensure that passage and transport rout is clear during 
• Oxygen deficiency  confined space activities. Proper access/agrees should be 
accumulation of toxic  maintained. 
gases   • Gas test to be done by AGT prior to entering into the 
  confined space.
  • A trained and qualified individual should outside the tank 
  with the responsibility of ensuring the safety of authorized 
  entrants (Fabricator, Fitter, Welder e.tc) through the 
  performance pre‐entry briefing, checking and inspecting 
• Physical hazards   PPE, equipment and tools and performing regular 
  monitoring in ensuring person working inside pipe remains 
  safe for entry and occupation. 
  • A written rescue plan that has provision for conducting a 
  timely rescue of individuals working inside the pipe 
  (Confined Space) should be kept on site. Raising the alarm 
in the event of an emergency using the radio/mobile 
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR WORK

JSA Number:  DES‐PRL‐K.K ‐JSA‐001  JSA Title:  Coating and Raping activity   


Area:  Korangi and Keamari PRL Tanks  Activity:  Coating and raping activity in side and out side tank  Date  5/12/2012 

Task Description  Coating and raping activity in side and out side tank 
      Uncontrolled    Residual Risk 
Risk 
Step  Activity  Hazard  H  M  L  Control Measures  H  M  L 
  phones provided to them.
  • Ensure effective communication systems for the entry are 
  tested. 
• Improper stacking of  • Proper light should be provided less than 25v. 
material   • All material stack proper and category wise. 
• Rescue arrangement shall be made while working more 
 
than five meter inside large bore size. 
 
• PRL SHE&S Procedure shall be followed. 
• Unauthorized entrant  • Close supervision required while working inside. 
  • Execute the work under close supervision and presence of 
• Lack of oxygen  hole watcher.  
/oxygen/ air   • Proper air supply to be provided or air mover will be 
deficiency   provided. 
• Proper ventilation shall be there. 
• Working crew shell be trained for confined space working. 
11.  Coating Works • Health hazards.  M • Correct PPE should be worn  L
• Respiration Hazards.  • MSDS should be kept at site for PPE compliances 
  • Appropriate mask should be worn 
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR WORK

JSA Number:  DES‐PRL‐K.K ‐JSA‐001  JSA Title:  Coating and Raping activity   


Area:  Korangi and Keamari PRL Tanks  Activity:  Coating and raping activity in side and out side tank  Date  5/12/2012 

Task Description  Coating and raping activity in side and out side tank 
      Uncontrolled    Residual Risk 
Risk 
Step  Activity  Hazard  H  M  L  Control Measures  H  M  L 
• Manual Handling & storage  • Hands should be cleaned with soap solution before eating 
paint.  • Storage of paint as per MSDS 
  • Waste Paint tins to be removed from the work site and 
  dispose to designated area (as per JGC Procedure) 
• Environmental pollution  • Provide secondary containment 110% of largest cane. 
  • Keep proper type of fire extinguisher at site. 
  • Keep minimum stock level at site.   
• Chemical Spillage  • Spills to be reported immediately 
  • Portable Eye wash bottle shall be provided 
  • Explain the expected hazards and remedies to the working 
• Inhalation of toxic fumes   crew’s chemicals that they are dealing with. Hazardous 
  Or irritating eyes.  material training to be done. 
  • Care to be taken by all persons handling chemicals not to 
• Splatter from brush.  spill, splash nor have contact with the substances. 
  • Safety harness/fall arrestor to be worn for work at height 
• Slips, Trips, and Falls.  • 100% tie off of safety harness all times during 
Fire erection/dismantling 
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR WORK

JSA Number:  DES‐PRL‐K.K ‐JSA‐001  JSA Title:  Coating and Raping activity   


Area:  Korangi and Keamari PRL Tanks  Activity:  Coating and raping activity in side and out side tank  Date  5/12/2012 

Task Description  Coating and raping activity in side and out side tank 
      Uncontrolled    Residual Risk 
Risk 
Step  Activity  Hazard  H  M  L  Control Measures  H  M  L 
• Supervisor to be on site at all times during work activity. 
13  Extended  • Inadequate lighting in and    M    • Adequate lighting at work area and Access/Egress area.      L 
hour/night Works  around work areas,  Emergency route to muster point to be clearly illuminated. 
(Actual works will  causing shadows or poorly  •  Proper cable management 
be the same as day  lit work areas that could 
•  Use clear safety glass for night work for good visibility. 
work)  result in unsafe  acts and 
injuries taking place   • Warning Lights and sign boards. 
 
  •  Trained Flag man for equipment movement provided with 
signal torch. 
• Close  supervision required while working in night shift. 
14  Emergency  • Poor Communication     M    • Educate the workforce about Emergency Procedure.      L 
Procedure /    • All safety sign board shall be displayed properly at site. 
Response    
• In case of any Emergency all work will be stopped, Shut 
   
down all running equipment & Machineries and reported to 
 
Muster Point  
 
• Improper Access/ Egress   • Proper Access & Egress shall be available.  
  • All Workforces shall know the Muster Point location.  
•  PRL Emergency Procedure to be followed. 
JOB SAFETY ANALYSIS (JSA)
TANK MODIFICATION AND REPAIR WORK

JSA Number:  DES‐PRL‐K.K ‐JSA‐001  JSA Title:  Coating and Raping activity   


Area:  Korangi and Keamari PRL Tanks  Activity:  Coating and raping activity in side and out side tank  Date  5/12/2012 

Task Description  Coating and raping activity in side and out side tank 
      Uncontrolled    Residual Risk 
Risk 
Step  Activity  Hazard  H  M  L  Control Measures  H  M  L 
• Emergency  #       00000000 
• PRL Medical        #   00000000 
• •
 

15.  House keeping  Trips and fall    M    All waste generated shall be contained and disposed off in      L 


  designated waste skips.   
• Sharp Objects  • Do not store materials/equipments inside the plant area. 
 
  • Use Proper Personal protective equipment for handling of 
• Equipment damage   
waste. 
  • All materials shall be removed from the site to a safe 
storage location immediately after the work. 
 
Approved                                                   ______________________                   ______________________                      _________________ 
                                                                                   Signature                                                   Print                                                              Date 
 
 
 
Performing Party                                       ______________________                   ______________________                       ________________ 