SAUDI ARABIAN OLL COMPANY aw
gz sot
(SAUDI ARAMCO)
YANBU-JEDDAH PIPELINES & BULK PLANTS PROJECTS DIVISION
DOCUMENT TRANSMITTAL
To: SHAHID BASHIR CHAUDHRY Date: November 10, 2018
Contractor Representative ‘Transmittal No: “NJBP/CN/SSEM/T-1703/18
‘Saudi Services for Electro Mech. Works Co. Project Title: “BI-10-0239/Contract #6600030526
P.O. Box 20458, AL-Khobar 31952 North Jeddah Bulk Plant Expansion
‘Kingdom of Saudi Arabia Subject Proposed WPS # SSEM-SA-STR-
Tel. (013) 847-6314 Ext. 3412 001, Rev-A,
Fax: (013) 847-6310
DOCUMENT TRANSMITTAL NO.: _SSEM-NJBP-T-1692 DATED 08 OCT 2018
DOCUMENT ISSUE PURPOSE
Review Status Transmittal with
Od Perens LL Reviewed, No comments | [-] co-RoM
TE Approved with condition [=] Review Not Required LX] 0c
TE Rovse and Resubmit — [EX] Reviowedwith Comments | [] owe
21 Reiectea [1 otter Action / For Approval | [—] BNOR
/-Review of this docurnent does not relieve the contractor from its Contractual requirements and should not be
lconsidered as a waiver to Saudi Aramco Standards. The Contractor shall not use any comment as a basis of
|change Order.
DOCUMENT LIST
SL Rev,
nae Document No. im Description
1 NJP-BPE-OA.058-0007 0
[Comments / Remarks
[Attached is reviewed Proposed WPS (SSEM-SA-STR-001. Rev-A). Refer to attached PID documents.
Y ‘SHAHZAD Al YAZDANI, Sr. Project Engineer
S ‘Yanbu-Jeddah P/L & Bulk Plants Projects Div.
SASIAAK:psm
Received Details
Receiver Name Signature Received Date
Saudi
raimco: Company General Use naasam,Jorommeous
i Document Review. esporise Sheet.
2] noes ray rt20/p038
Yarden, Shahzad A
| SanorPrjed Engese
1 Mua, Naf Shot, Showkath A
YanbJedaoh Plpotro() Proj nit
‘ae 49621-4005
BINdO# PROJEOT TITLE
‘3-4002300-0008 i
‘WRDPIDveeqved Whe CONTRACTOR — SE a ee el
‘AWS D1.:7015, Seton 03 pre qualifeation of WPS gulelnes Contactor nied to flow the heow rqutemants:
1. Cntr shal bain the apo fon SAPMT in attache of iat fo wel zedire appro
form: {Contracior to ensue rit to start of welding wots)
‘WPS qualified to filet weld only
elo quienes of SAS. 11/12, Pra 3 6.5 for le jrogen consume aplston fined as
less than o¢ equa to 8 mi of hydrogen per 100 gm of deposited wid metal)
WAS thickness qualification ranges 03 ~38 rt
Follow AWSDI, Tobe 3. gules for Wan thkois pe usof ut weld its
[ea cis Sas es cas ear eee
| celine cic ton rt ea
eee
Revewet cap af ‘Satire & Date a a
‘Muhamed Umar Ansari Op, a pai eee
2. rk Taira
erica ‘Signature.
|:Supervigor ae + ait
ccc Aaa |PEE mn ie
Sen rece: Copy Ges Useow Request for Welding Procedure on |
en Approval ‘Saudi Aramco
tis requested that the following Wolding Procedure Specification (WPS) be reviewed and approved.
‘The listed WPS has been qualification tested In accordance with SAES-W.011/ SAES-W.012.
Ithas been edited for clerical completeness and technical content.
Companye Project TOTBIPOIConiract
sem NovthJedldsh Buk Pant Expansion Project | 6600030826 /10-02300-0003
‘Welding Procadare Spec. Woz Procedure Gualfcation Record (PORT:
SGEMSASTR-OO1 Rev. A Prequalifled (As per AWS D1.1 Chaptor 8)
CodelSpee Design Conditions:
eats colar Temp nA ‘Sevice Funk Seo Mlachmont
8314 (CO) Min Temp: WA ‘Sour Services? CT Yesil No
B318 (CJ CVN impacts Required? LI Yes [ll No | Hardness Tests? Li Yes) No
‘Guallication | SANS (Where Applicabloy ine Crass (os)
ASMESECIX Oy ‘2.8AMSs.07 ‘Spucural and Pipe Support Weng
apisTD 1104
awsDi4
‘Subang Saudi Aramco,
am Tyerrnt ve one
Signature: (A Department:
Telephone: Addross:
Fax
Tnspestion Dopartment Approval
Ramer FOMUo & DAO