You are on page 1of 8
SAUDI ARABIAN OLL COMPANY aw gz sot (SAUDI ARAMCO) YANBU-JEDDAH PIPELINES & BULK PLANTS PROJECTS DIVISION DOCUMENT TRANSMITTAL To: SHAHID BASHIR CHAUDHRY Date: November 10, 2018 Contractor Representative ‘Transmittal No: “NJBP/CN/SSEM/T-1703/18 ‘Saudi Services for Electro Mech. Works Co. Project Title: “BI-10-0239/Contract #6600030526 P.O. Box 20458, AL-Khobar 31952 North Jeddah Bulk Plant Expansion ‘Kingdom of Saudi Arabia Subject Proposed WPS # SSEM-SA-STR- Tel. (013) 847-6314 Ext. 3412 001, Rev-A, Fax: (013) 847-6310 DOCUMENT TRANSMITTAL NO.: _SSEM-NJBP-T-1692 DATED 08 OCT 2018 DOCUMENT ISSUE PURPOSE Review Status Transmittal with Od Perens LL Reviewed, No comments | [-] co-RoM TE Approved with condition [=] Review Not Required LX] 0c TE Rovse and Resubmit — [EX] Reviowedwith Comments | [] owe 21 Reiectea [1 otter Action / For Approval | [—] BNOR /-Review of this docurnent does not relieve the contractor from its Contractual requirements and should not be lconsidered as a waiver to Saudi Aramco Standards. The Contractor shall not use any comment as a basis of |change Order. DOCUMENT LIST SL Rev, nae Document No. im Description 1 NJP-BPE-OA.058-0007 0 [Comments / Remarks [Attached is reviewed Proposed WPS (SSEM-SA-STR-001. Rev-A). Refer to attached PID documents. Y ‘SHAHZAD Al YAZDANI, Sr. Project Engineer S ‘Yanbu-Jeddah P/L & Bulk Plants Projects Div. SASIAAK:psm Received Details Receiver Name Signature Received Date Saudi raimco: Company General Use naasam, Jorommeous i Document Review. esporise Sheet. 2] noes ray rt20/p038 Yarden, Shahzad A | SanorPrjed Engese 1 Mua, Naf Shot, Showkath A YanbJedaoh Plpotro() Proj nit ‘ae 49621-4005 BINdO# PROJEOT TITLE ‘3-4002300-0008 i ‘WRDPIDveeqved Whe CONTRACTOR — SE a ee el ‘AWS D1.:7015, Seton 03 pre qualifeation of WPS gulelnes Contactor nied to flow the heow rqutemants: 1. Cntr shal bain the apo fon SAPMT in attache of iat fo wel zedire appro form: {Contracior to ensue rit to start of welding wots) ‘WPS qualified to filet weld only elo quienes of SAS. 11/12, Pra 3 6.5 for le jrogen consume aplston fined as less than o¢ equa to 8 mi of hydrogen per 100 gm of deposited wid metal) WAS thickness qualification ranges 03 ~38 rt Follow AWSDI, Tobe 3. gules for Wan thkois pe usof ut weld its [ea cis Sas es cas ear eee | celine cic ton rt ea eee Revewet cap af ‘Satire & Date a a ‘Muhamed Umar Ansari Op, a pai eee 2. rk Taira erica ‘Signature. |:Supervigor ae + ait ccc Aaa |PEE mn ie Sen rece: Copy Ges Use ow Request for Welding Procedure on | en Approval ‘Saudi Aramco tis requested that the following Wolding Procedure Specification (WPS) be reviewed and approved. ‘The listed WPS has been qualification tested In accordance with SAES-W.011/ SAES-W.012. Ithas been edited for clerical completeness and technical content. Companye Project TOTBIPOIConiract sem NovthJedldsh Buk Pant Expansion Project | 6600030826 /10-02300-0003 ‘Welding Procadare Spec. Woz Procedure Gualfcation Record (PORT: SGEMSASTR-OO1 Rev. A Prequalifled (As per AWS D1.1 Chaptor 8) CodelSpee Design Conditions: eats colar Temp nA ‘Sevice Funk Seo Mlachmont 8314 (CO) Min Temp: WA ‘Sour Services? CT Yesil No B318 (CJ CVN impacts Required? LI Yes [ll No | Hardness Tests? Li Yes) No ‘Guallication | SANS (Where Applicabloy ine Crass (os) ASMESECIX Oy ‘2.8AMSs.07 ‘Spucural and Pipe Support Weng apisTD 1104 awsDi4 ‘Subang Saudi Aramco, am Tyerrnt ve one Signature: (A Department: Telephone: Addross: Fax Tnspestion Dopartment Approval Ramer FOMUo & DAO

You might also like