Professional Documents
Culture Documents
H124 CONTENT OF FINISHED DRAWINGS (Sysematic)
H124 CONTENT OF FINISHED DRAWINGS (Sysematic)
(H124)
COMPILED BY _________________
CHECKED BY___________________
APPROVED BY__________________
2002.11
__________________________EDW506-050-00TM 1/1
GENERAL
NO. DWG. NO TITLE
1
EDW506-100-01C GENERAL ARRANGEMENT
2 EDW506-100-03 LINES PLAN
HULL
NO. DWG. NO TITLE
__________EDW506-050-00TM 2/2
NO. DWG. NO TITLE
OUTFIT
NO. DWG. NO TITLE
MACHINERY
NO. DWG. NO TITLE
_______EDW506-050-00TM 2/4
NO. DWG. NO TITLE
51 EDW506-526-06 CO2 CYL. FIX PLAN (CO2 SYS. FOR T/O BOILERS)
63 EDW506-541-08 VENT. ARR. FOR FIRE STATION, WASTE ROOM, LIFE JACKET ROOM
78 EDW506-580-01 HEAT
PLAN EXCHANGE ROOM, PIPE TUNNEL AND CARGO DECK
ARR.DRAWING
ELECTRIC
NO. DWG. NO TITLE
15 EDW506-610-016 TYFON
39 EDW506-610-040 U V -STERILIZER
41 EDW506-610-042 SEPARATORS
NO DWG. NO TITLE
52 EDW506-610-053 BOX COOLER
54 EDW506-610-055 PUMPS
55 EDW506-610-056 FANS