NOTE:

- All measurements must be corrected and


restarted in place before starting any remodeling

PORT STBD
PROJECT:
20.0[17.5] 20.0[17.5]
ILB5 20.0[17.5]
20.0[17.5]
22.0[19.5] 22.0[19.5]
HULL SURVEY PROGRAMME
ILB4 21.0[18.5] 21.0[18.5] 22.0[19.5] THICKNESS MEASUREMENT
22.0[19.5] MT MAKSIM GORKY
18.0[15.5] HS1 22.0[17.5] HS2 20.0[17.5] HS3 HS4 21.0[18.5] 21.0[18.5] 20.0[17.5] 22.0[17.5] 18.0[15.5] IMO 9590008

ILB3 20.0[17.5]
21.0[18.5] 20.0[17.5] 20.0[17.5] 21.0[18.5]
20.0[17.5]

PLAN:
ILB2 21.0[18.5] 21.0[18.5] NO. 3 COT (CENTER)
21.0[18.5]
21.0[18.5] TRANSVERSE BULKHEAD
21.0[18.5] 21.0[18.5] 21.0[18.5] 21.0[18.5] AT FR. NO.84
ILB1
21.5[19.0] 21.0[18.5] PLACE OF SURVEY:
21.0[18.5] 21.5[19.0]

POZUELO BAY, VENEZUELA

OPERATORS:
MR. ORLANDO MEDINA
MR. PABLO SEQUERA
MR. DIMAS SMITH

ORG THK INNER LONGI BHD LONGI - 33 TO 35 - 12.0/28.0 [9.5/12.5] DRAW:


INNER LONGI BHD LONGI - 36 TO 39 - 12.0/24.0 [9.5/12.5]
INNER LONGI BHD LONGI - 40 - 12.0/14.0 [9.5/11.5] MR. DIMAS SMITH
INNER LONGI BHD LONGI - 41 TO 43 - 12.0/24.0 [9.5/21.5]
INNER LONGI BHD LONGI - 44 TO 48 - 12.0/22.0 [9.5/19.5] DATE:
BRACKET - 33 TO 46 - 13.0/13.0 [10.5/10.5] MAY 2021

SCALE: DRAWING:
N/A A5