Letter No. AA/D-H/NHAI/2111/19-20/5179
Date: 7% October, 2019,
To,
The Project Director,
National Highways Authority of India,
Project Implementation Unit,
Near JMIT College Campus,
km.202, NH-4, Chitradurga-577 502.
Sub : Independent Engineer Services for Six laning of Davangere-Haveri from Km. 260.000
to Km, 338.923 of NH-48 (Old NH-4) in the State of Karnataka under NHDP Phase-V —
Reg: Payment during Construction Period-III (Third) Payment Milestone,
Ref: 1. Concessionaire's letter No. IDHHL/DHHP/IE-CORRESP/02/661, dated 27.09.2019.
2, Concessionaire’s letter No. IDHHL/DHHP/IE-CORRESP/02/643, dated 14.09.2019,
3. IE’s Letter No. AA/D-H/NHAI/2111/19-20/3466, dated 29.07.2019.
4, Authority's letter No. NHAI/PIU-CTA/6-L DVG-HVR/2018-19/07/729, 08.07.2019,
Dear Sir,
This has reference to the Concessionaire letter no, 661, 1% cited, wherein he has submitted
request for release of 3° (Third) installment (8%) of the Bid Project Cost upon achievement
of 3% Payment Milestone i.e., 50% achievement of Physical Progress.
{As per the provisions of Clause 23.3.1 read in conjunction with Clause 23.4 of the Concession
‘Agreement, the Concessionaire is entitled to receive the Third installment of the Bid Project
Cost during Construction Period amounting to 8% (eight percent) of the Bid Project Cost
adjusted for the Price Index Multiple upon Independent Engineer's certification of achievement
of 3 Payment Milestone i.e., achievement of 50% Physical Progress.
Based on the approved Schedule-G communicated by the Authority vide letter No. 729,
reference 4" cited, the Concessionaire, vide letter No. 661, dated 27.09.2019 has resubmitted
the invoice for Payment Milestone-IIT.
We have scrutinized the detailed calculation of Physical progress and adjustment of Bid Project
Cost submitted by the Concessionaire and our observations are as under:
1, In his letter, the Concessionaire submitted the detailed calculation of Physical
Progress, as per which he has achieved 50.51% of Physical progress by 26.09.2019.
2. We have verified that the Concessionaire has achieved the target of 50% of Physical
progress set forth for Third Payment Milestone before the date of invoice for Payment
Milestone-III. The detailed calculation is enclosed herewith as Annexure-I.
3. We have used CPI (IW) of Hubli Dharwar (Karnataka) center as published by Labour
Bureau, Govt. of India in calculating the Adjusted Bid Project Cost for the month of
‘August’19. The WPI values for the month of August’!9 are considered in accordance
with Clause 23.4 of the Concession Agreement. As the values of WPI for August’9 and
CPI (IW) for April, May, June, July & August’19 are yet to be published, we have
6
considered the provisional values. \
Ravula Residency, Srinagar Colony Main Rd., Hyderabad ~ 500 082, India,
Tel: +91-40-93737633, 48483456; Fax: +91-40-93736977; emall: aarvee@aarvee.net; web: www.aarvee.com
CIN: U74200TG2O05PICO454912
4. During the assessment of the 2" installment of payment, we had considered
provisional WPI value for June’19. The final values have fot’ been published by the
Office of Economic adviser for the aforesaid month. Hence, the Second installment of
Bid Project Cost will be reconciled after the publication of the same.
5. AS per Clause 23.1 of the Concession Agreement, the Bid Project Cost of the Project is
Rs, 1177 Crore and the adjusted Bid Project Cost for the Reference Index date
preceding the date of Invoice i.e August’19 works out to Rs.1280,65,03,823/- (Rupees
One Two Eight Zero Crores Sixty Five Lakhs Three Thousand Eight Hundred and
Twenty Three Only), as per the procedure prescribed in Clause 23.2.3 of the
Concession Agreement, (details enclosed as Annexure-II).
Accordingly, the 3* installment of the Bid Project Cost during Construction Period amounting
to 8% (Eight percent) of the Bid Project Cost adjusted for the Price Index Multiple works out
to Rs. 102,45,20,306/- (Rupees One Zero Two Crores Forty Five Lakhs Twenty
Thousand Three Hundred and Six Only). We hereby recommend for release of the same
after making statutory deductions from Authority's end.
We trust our recommendations are in order.
With best regards,
for Aapvee Associates Architects Engineers & Consultants Pvt. Ltd.,
rem
M. Ramaswamy Iyer %
Authorised Signatory pe
En
As stated above
Copy to:
1. Team Leader, Aarvee Associates Architects Engineers & Consultants Pvt. Ltd., Ranebennur.
2. Authorized Signatory, IRCON Davanagere Haveri Highway Limited., Ranebennur- 581115: = Lil
a are a ” user Burpepui) aumenas-sodns (2)
a 5 = a
[Hiren fe a :
mama | sco | sn ert set ou
[ests ‘pes Susy, wo saeeaana
Ssmecseun ‘spr ta “cae
ay
z
=
a
a aa
ee
| ee
steko
camauy | orto Pa 0 on ‘tov vm ose pun Bavao1n (2)
sanauw | coro | sor wo ua on
TERS 5 I
ENS ae a z
ae He oo
rama ae sa
ewe are —
a ee HE Se
[SESE a — et a
Frees Sots o Suumauers pue pnw
ow
is aa
cen asmamuay | Tren | revo na [5H ZEI | sy | yun | seotoa ojtuaye anunineeos 2} 2808 =
abet
SSBCTOEM Sd PEUSS
SS
t
- pm aUis
isles} &
ARDY
‘1 98eauSI0m,|
wanaun | awe a me
Teamaany—|— ser rE Te
aeamsun | — ee ie HED
wancuy | eco " Hee ow
arama —| ere 7 aE =a
itemeun | — ae aE ca a
“ew
“aH
vranauw | woo z “ero z "on
sraneow ta z a Z =
Sram] Sar = ae E a Te
eee Sessediopun VeTsopad SMe) (C)
a ow
co sumauuy | SSSI | pmnome asp | suzERIeD || cas | yun | sxnifoa eotsng so aouesnerou 0) wOmns =(une
"oH ‘i
< Boaenara) sesmisnaie
on
cc
HM
oe amavay
cov sect % on
ERE | 5 ar HT = co
veamouw | ros0 s ros 5 ou ‘onepunod rem /vonepuno 214 (2)
ead e ar wan x oe TEREST OSIOTT
onepanos (7
“oH
a
ot
ow
a SHR
ss0160s
“on ainxouuy Md prcose A wun | ssou6og eotshud so avouioanseou! 10} 96235
teorsAya6T02'60'97 UO Se ssaiBo1d je>1SkYd [eI0L
ovanaww uve vad
aH
a9
aaa
oe 5Er a
fia oae ae =
a TH ay
aanent iso “eH
aay ae 3
7 fee =
aa ae a
wanouw [ora me owes |
Teannon | era set cou [om
reanaw | crc | poms ors weet | wn
aT on r =
weanmuy | ose | sex 9st veowst | un “or sees ss
sa, . a (20 tc ent Swede ‘a
@ ald as ea aocest Slo sweonddy sapnu) emn que paREREY Ch)
seaitos
sen sineaviy | S084 | paso soy | won | sseiter stag soreeuameenuisa sing | mtAnnexure-IT
Six laning of Davanagere - Haver from km 2604+000 to km 338+923 of NH-4 in the state of Karnataka to be executed
: as Hybrid Annuity Project on DBOT-Annuity under NHDP Phase-V
IL (Third) Payment Milestone - Invoice-03
Calculation as per Price Index Multiple for Second Payment Milestone
1 | Bid date 17th March 2017|
2 | Reference index date February, 2017|
WPI as on February, 2017
3 | cwer- February-17 - Series 2004-05) ey
4 | cPlas on February, 2017 (Hubli Dharwar Centre) 294.00
5 | Project Index (Pt) as on February, 2017 (70% WPI + 30% CPI) 218.05
6 | Anvoice date 27th September, 2019
7 | Reference index date August, 2019
3 | Welas on August, 2019 (provisional) nel
(WPI - August-19 - Series 2011-12 x Linking Factor-1.641 as NHAI MOM) ’
9 | cPtas on August, 2019 (Hubli Dharwar Centre) (provisional) 326.00
10 | Price index (PI) as on August, 2019 (70% WPI + 30% CPI) (provisional) 237.25
11 | Project index Multiple PIM (i.e. Pl-August, 2019 / PI-February 2017 ) 1.0881
12. | Bid Project Cost 11,770,000,000
13 | Adjusted Bid Project Cost (PIM X Bid Project Cost) 12,806,503,823
“Amount due on Second Payment milestone (Rupees)
a (i.e. 8% of Adjusted Bid Project Cost) za auaoe
wrkat oy. sn ny Jones tr pape wD.
PRerosora | _wwot | ame a wate wm sare sta
swenvacer | _oserr | wearer mE career wa auras er
ascave | sear | _soasren oe saree Ba sar 3008 08 A
veeresatret | sot | etoreez me area oar ove eursots a. a0
wareaiaree | _soare | _eseroer mE Taser Ta ra sae 05 atten
erowvewe | voare | _etsssez me est95t Ea eat eens 0
craves [tsar | serve re st Ea Fat arco co
rrewver: | wear | vse ee em ust rat aari0%e ccchenee|
serous | wore | _eeswree ae avoat wet at ara suche
erssrever | wart | esse ae ee ws oe oeTF0e Raza
eserve | toart | verse aE zarooe ust zi marae sacar
woeose | _oare | suv Es caren us oor oo az oemeo
ersvowe | were | _avsrew as ust esr et nari acu
ornare | wart | swe as ssco6r ea sor mare rae
caceweve | wart | cowor ae ‘eersst ue rar ae 08 oa
ecasiare: | wart | veers ae ‘oatvet wat eam aursore a
sweet | eet | vee ae eomreat est ear ar7008 fen
nsietreer_| soot | wasn ue eowost ea eam nares a0
esoararee: | wart | _cavoroee oie rwxr0st us co nace soe
evoeseee | seri | eoreee ais SSF 6F est at set's wae
carouste | weet | emorver Es ‘sven es eat caoceese | Ree wropmoaeH 0]
owoweur | sone 1 =m Fam_| coewoee acer aea Pa
wwe | stamsar) | onda Geared [Vernet srr) | OP Lae trae eg
peony sepoveseis ian
pr 95eug daHN 29pun Aumnuuy LOBG LO.ZaForg AynuUy pUghH Se painDBKD 9q 01 eYELEUHE JO BIEN ay UI PHN JO EZEHEEE WH 01 290409 WA WOH HaneH -avaBeUeneQ Jo BUI] XSWPI
women sence ser econ
safer wareare ar raha Gta
OFFICE OF THE ECONOMIC ADVISER
WA
woe eer ote
Wholesale Price Index (WP!)
‘Monthly Wnoesae Price Index
209 ti92 tts tae mia a6 mis 2
vo monte sr provisional. ates tro months ae tobe reckoned with reference tothe
lense suedcPrctw)
Consumer Price Index Numbers for Industrial workers on Base 2001 = 100 for Year 2019
State Centre Desc Jan Feb Mar
AP GUNTUR 288 287 288
VWAYWADA 292 | 291 291
VISHAKHAPATHNAM 292 | 291. 290
‘ASM DOOM DOOMATINSUKIA 272 272 273
GUWAHATI 271 272 273
LABAG SILCHAR 268 270 273
MARIANI JORHAT 256 255 256
NGAPARATEZPUR 248248 250
BIH MUNGERJAMALPUR 336.834 | 340
‘CHD CHANDIGARH 305 | 305 307 |
‘CHS BHILAL 323
DLI_ DELHI 297
‘Goa Goa 329
(GU) AHMEDABAD 279
BHAVNAGAR 293
RAJKOT 297
SURAT 268
VADODARA__ | 275 |
[HRY FARIDABAD 274 |
| ___YAMUNANAGAR
[HP HIMACHAL PRADESH
Jak. SRINAGAR
URK BOKARO
GIRIDH
JAMSHEDPUR
JHARIA 356
KODARMA 380 | 381
RANCHI HATIA 375 | 376
IKNT BELGAUM 304 | 303 |
| BENeLURU 294 292 295
| a 309 | 307 | 306
4 | 311 | 309 | 308
KRL ERNAKULAM (314 | 314 | 314
MUNDAKKAYAM | 308/308 310
‘QuILoN | 362 | 957 | 956 |
IMP BHOPAL | 322 | 322 | 324 |
CHHINDWARA “| 297 | 902 | 904
INDORE 277 | 278 200 |
___JABALPUR. 316 | 316 | 317
ae UMA 300 | 802 305
NAGPUR | 383 | 387 | 386
Nasik | 353 | 357 | 357
PUNE | 390 | 929 | 951 |
SHOLAPUR 320 324 324
ORI ANGULTALCHER | 327 | 326 | 328
| ROURKELA 307 308 | 309