Professional Documents
Culture Documents
In the event CEB is compelled to take demand management measures due to inadequate generation
as result of fuel shortage and unavailability of generators, such measures will be limited to the
schedule given below.
Period Group
09:00 – 12:00 I, J, K, L
12:00 –15:00 E, F, G, H
15:00 – 18:00 A, B, C, D
18:00 – 19:20 I, J, K, L
19:20-20:40 E, F, G, H
20:40-22:00 A, B, C, D
Schedule 02: Demand management schedule for Nothern, North Central, Part of the
Central, part of the North West and part of the Western province, Eastern, UVA as attached
in Annex 02.
Period Group
09:00 – 12:00 U, V, W
12:00 –15:00 S, T
15:00 – 18:00 P, Q, R
18:00 – 19:20 U, V, W
19:20-20:40 S, T
20:40-22:00 P, Q, R
DMS on 19th and 20th April 2022
Schedule 01: Demand management schedule for Southern, Sabaragamuwa, Part of the
Central, part of the North West and part of the Western provinces as attached in Annex 01.
19.04.2022 20.04.2022
08:00 – 11:20 I, J, K, L I, J, K, L
11:20 –14:40 E, F, G, H E, F, G, H
14:40 – 18:00 A, B, C, D A, B, C, D
18:00 – 19:30 I, J, K, L I, J, K, L
19:30-21:00 E, F, G, H E, F, G, H
21:00-22:30 A, B, C, D A, B, C, D
Schedule 02: Demand management schedule for Nothern, North Central, Part of the
Central, part of the North West and part of the Western province, Eastern, UVA as attached
in Annex 02.
19.04.2022 20.04.2022
08:00 – 11:20 U, V, W U, V, W
11:20 –14:40 S, T S, T
14:40 – 18:00 P, Q, R P, Q, R
18:00 – 19:30 U, V, W U, V, W
19:30-21:00 S, T S, T
21:00-22:30 P, Q, R P, Q, R
Schedule 03: Demand management schedule feeders supplying to Colombo city commercial
zones as attached in Annex 03.
19.04.2022 20.04.2022