You are on page 1of 3

World

Plants Facilities / Petrochemicals, Industrial Projects, Onshore


Chapter 0
Part 3

S# Index Headings
Contents
1 Chapter 1 General-Industrial Development, Processing Facility Formation Policy
Decision
2 Chapter 2 Project Design, Contract Award & Miscellaneous
3 Chapter 3 Engineering
4 Chapter 4 For Concrete Durability Supplementary Cementing Materials
5 Chapter 5 Construction & Controls
6 Chapter 6 Project Management Facility
7 Chapter 7 Detailed Engineering Requirements
8 Chapter 8 Building Design Concept
9 Chapter 9 Procurement
10 Chapter 10 Construction
11 Chapter 11 Quality Assurance / Requirements
12 Chapter 12 Execution Plan Project Implementation
13 Chapter 13 Environmental Clauses For Plant Industrial City In Construction Contracts
14 Chapter 14 Environment Controls Waste Disposal
15 Chapter 15 Pre Commissioning
16 Chapter 16 Testing& Commissioning
17 Chapter 17 Construction Project Management An Overview
18 Chapter 18 Hospital Project Progress Case Study
19 Chapter 19 Organisation Manual Standard System
20 Chapter 20 Front End Engineering Designs
21 Chapter 21 Procedures Manual/Coordination
22 Chapter 22 Project Execution Method
EPC 225 MW Combined Cycle Power Project
23 Chapter 23 EPC 225 MW CCPP- Project Plan
24 Chapter 24 Contraction Termination Notice Phase I
225 MW Gas Based Power Project
25 Chapter 25 Contraction Termination Notice Phase II
225 MW Gas Based Power Project
26 Chapter 26 Contraction Termination Notice Phase II Supply 225 MW Gas Based
Power Project
27 Chapter 27 Contract Novation Agreement 225 MW Gas Based Power Project
28 Chapter 28 General Contract Provisions Guidelines
29 Chapter 29 General Conditions Of Contract Form Used In Past Decades Pre FIDIC
30 Chapter 30 Commercial Subcontracts
31 Chapter 31 Useful References
32 Chapter 32 Procurement controls Procurement/Budget +Procurement Control Excel
Workbook/Sheets
33 Chapter 33 Changing Cities Building Opportunities Sustainable Development + Slides
34 Chapter Sketches explanations & sketches
34-0 & 34-
1 to 34-16
Sketch Descriptions
#
35 1 Trench excavation safety, railing & ladder
36 2 Excavation safety of a major building with ordinary foundations without
ramp
37 3 Excavation safety of a major building with ordinary & raft foundation with
ramp
38 4 Excavation safety of a major building with benching/s for foundation with
ramp & dewatering well point system
39 5 Excavation safety of a major building with benching/s for foundation with
ramp & dewatering submersible pump system
40 6 Supporting to trench side for surcharge due to building
41 7 Pipe rack foundation concrete protection
42 8 Light pole foundation–precast or cast in situ
43 9 RCC underground sump chamber
44 10 Arrangement for precast manhole walls & cover lifting lugs
45 11 Tank base grouting by construction chemical grout
46 12 Compressor foundation/table top typical
47 13 Seawater surge basin/reservoir for major storage
48 14 Water power pumping project buildings
49 15 Plaster block wall & tiles
50 16 Building new sewer line
51 17 RCC box culvert
52 18 Traffic diversion for infrastructure services lines laying with road crossing
53 19 Outfall chamber excavation procedure
54 20 Indicative facilities plant layout (all crossings & components)
55 21 Pipe trench GRE/other pipes typical
56 22 Cable trench typical
57 23 Duct bank (typical) (for 6 cables)
58 24 Duct bank (typical) (for 3 cables)
59 25 Pipe culvert trench (typical)
60 26 Foundation base grouting
61 27 Traffic diversion to lay pipe below road
62 28 New sewer line around building
63 29 Water reservoir line plan
64 30 Water reservoir structure
65 31-35 Manholes & catch basin shop drawings (typical)
66 36 Weir manhole shop drawings (typical)
67 37-40 Manholes & catch basin shop drawings (typical)
68 41-48 Footings formwork shop drawings(typical)
69 49-55 Columns formwork shop drawings(typical)
70 56 Administration area landscape details building landscape
71 57 Administration area landscape layout
72 57 a Administration area main irrigation layout
73 57 b Administration area detailed irrigation layout
74 57 c CCB landscape layout
75 58 Massive block concrete pour for compressor foundation typical
76 59 Raft concrete pour layers sequence
77 60 Cracked gas compressor foundation with tabletop indicative
78 60 a Column inserts for compressor foundations columns
79 61 Central control building indicative
80 61a Slab support propriety system for formwork (typical) with grid spacing
1Mx2M
81 61 b RCC wall formwork site fabricated system
82 62 Electrical substation building indicative
83 63 An officer’s apartment/flat plan only
84 64 Administrative building plan indicative
85 64 a Lift formwork details typical
86 65 Sectional water tank beams support indicative
87 66 Common process area & other layout
88 67 Seawater distribution to plant for cooling
89 68 Storm water drainage from all catchments
90 69 Firefighting external network/ring mains
91 70 External electric distribution from OHT
92 71 Electric distribution to facility equipment DBs
93 72 Potable water distribution for whole site
94 73 Instrument air distribution to process area
95 74 Oily water discharge drain out network
96 75 Sanitary sewage disposal to containment
97 76 Fire suppression by Inergen gas for CCB IT
98 76a Fire suppression by Inergen gas for CCB IT/blown & explanation
99 77a Firing range line plan range 300 M
100 77b Firing range plan & details
101 77c Firing range plan & details

You might also like