Timeline:
Review Title Date
number
1 Synopsis 8th Dec-10th Dec
2 Programming Review 29th Dec-31st Dec
3 Case Study 19th Jan-21st Jan
4 Site Analysis and Final interim 2nd Feb-4th Feb
Report
5 Conceptual and Design 16th Feb-18th Feb
Evolution
6 Design Development -Phase 1 2nd March-4th March
7 Design Development -Phase 2 23rd March-25th March
8 Pre Final Review and Final 6th April-8th April
Report
II. Requirements for REVIEW 2: Desktop Study (Observation, Inferences and Analysis of each,
comparative analysis), Contextual study, Formulation of Area Requirements, Criteria and
justification of Case studies– [Major parameters: Observation, Inference & Analysis.]
A. Site Plan
B. Site Section (2 nos. minimum Terrace Plan)
C. Figure Ground Map (Built Volume open space)
D. Road Network
E. Parking layout
A. Individual building plans
B. Sections
C. Elevations
D. 3d
E. Report
VII. Requirements for REVIEW 7: Design Development – Part II (Modifications from Stage I)
B.Arch Thesis 2017-22 Batch, GSA
F. Site Plan
G. Site Section (2 nos. minimum Terrace Plan)
H. Figure Ground Map (Built Volume open space)
I. Road Network
J. Parking layout
F. Individual building plans
G. Sections
H. Elevations
I. 3d
J. Service Plans, Structural plans if required for the topic
K. Report
VIII. Requirements for REVIEW 8: Pre Final Review and Final Report
A. Synopsis
B. Thesis Project Methodology
C. Literature Study Inferences
D. Desktop Study Findings
E. Architectural programming
F. Case Study/ Situation Analysis Summary
G. Site Analysis
H. Conceptual and Design Evolution
I. Site Plan
J. Site Section (2 nos. minimum)
K. Terrace Plan
L. Figure Ground Map (Built Volume open space)
M. Road Network
N. Parking layout
O. Schematic Services (separately for water supply, power, etc.)
P. Emergency evacuation plan
Q. Schematic landscape plans
R. Schematic barrier free plans
A. Individual building plans
B. Sections
C. Elevations
D. 3d/ Study Model/ Walkthrough
E. Report
B.Arch Thesis 2017-22 Batch, GSA
Due
on
Task Progress on Student Guide
(Nex
Date Points discussed Assigne the previous Sign sign &
t
d task &date date
Mee
ting)
[N.B.: Guides are at liberty to alter keeping the basic above information as the minimum
essentials]
B.Arch Thesis 2017-22 Batch, GSA