1. Introduction

a) Project Title.
b) Project Location.
c) Climatic Conditions
d) Distance from Airport/Bus Station/Railway Station/Metro / Landmarks
e) Project Boundary (Neighbourhood). North / South / East / West.
f) Project Boundary Dimension. North / South / East / West.
g) Site Frontage Dimension.
h) Site Area.
i) FAR.
j) Coverage.
k) Height
l) Set Backs
m) Land Use Breakup. (Commercial /Residential/Etc.)
n) Total Population of the Development. (Residential / Commercial)
o) Zoning of Usage.
p) Parking Facilities.
q) Security Arrangements (Entry/Exit/Internal)
r) Basements and Numbers.
s) Number of Floors of Buildings. (Commercial /Residential/Etc.)

2. Site (Masterplan)

a) Approach Road/Roads / Neighbourhood / Surrounding Development


b) Main Entry- General / Special Need / Cycle Track / Pedestrian / Services. Etc.
c) Security – Checks / Offices.
d) Internal Roads / Service Roads / Fire Tender / Cycle Track / Pedestrian Etc.
e) Drop Zone – Cars / Taxis / Autos / Vans Etc. (Explain Circulation)
f) Pickup Zone – Cars / Taxis / Autos / Vans Etc. (Explain Circulation)
g) Parking- Long Time / Short Time. Vehicular Segregation.
h) Service Entry / Service Deck / Service Vehicles Parking.
i) Fire Station / Fire Hydrants / Control Room.
j) Electrical Sub-Station / Dg / Solar / Transformer / Stp / Sump / Fire/ Waste Disposal (External
And Internal) Etc.
k) Landscape / Hard / Soft / Water Body Etc.
l) Play Area – Adult / Children / Walking Track Etc.
m) Ambulance Bay

3. Service Core

a) Passenger Lifts / Bed Lifts.


b) Staircases.
c) Fire Staircase.
d) Fire Lift.
e) Service Lift.
f) Pantry.
g) Restrooms.
h) House Keeping.
i) HVAC / Ahu
j) Service Ducts – Electrical / Data / Sanitary / Vent / Garbage Chute Etc.

4. Podium

a) Plinth Height / Plinth Approach / Landscape / Seating Etc.


b) Security Gate / Check / Offices.
c) Entrance Gate – General / Users / Staff / Residents Etc.
d) Lobby – Entrance / Waiting / Reception / Information / Baggage / Front Office / Escalators.
e) Rest Rooms – Gents / Ladies / Handicap / Feeding Room / Drinking Water, Etc.
f) Maintenance Room for Services. G. Atm. H. Primary Health Centre.
g) Zoning and Circulation
h) Commercial:
 Lobby / Reception / Office / Waiting / Security, Etc.
 Shops – Small / Medium / Large.
 Service Corridor / Store.
 Rest Rooms.
 Staff Facilities.
 Food Court – Billing / Dining Area / Kitchen / Service Corridor / Store / Utility / Plate
& Tray Wash / Staff Rest & Facilities / Service Lift / Stairs / Kitchen / Users
Restrooms, Wash, Drinking Water, Etc.

5. Multiplex and Offices

Multiplex:

a) Auditorium-4 Screens.
b) Lobby / Ticket Counter / Baggage / Checking Etc.
c) Food Stalls.
d) Rest Rooms – Gents / Ladies / Handicap / Feeding Room / Drinking Water Etc.
e) Staff Facility.
f) Offices.

Offices:

a) Lobby / Reception / Office / Waiting / Security. Etc


b) Office – Small / Medium / Large.
c) Restrooms.
d) Pantry.
e) Staff Facilities
f) Business Centre – Stationery / Photocopy / Clerical Services Etc.
g) Meeting Rooms / Conference Etc.
6. Residences and Hotels:

a) Lobby / Reception / Office / Waiting / Security. Etc


b) Bhk / 2 Bhk / 3 Bhk
c) Restrooms
d) Staff Facilities.
e) Common Area. Etc
f) Gym / Recreation.
g) Club House / Swimming Pool / Change Room / Services Etc

7. Services:

a) Electrical
b) Plumbing
c) water supply
d) HVAC
e) garbage chutes
f) data ducts
g) firefighting system (fire reservoir)
h) Gas piping
i) drinking water
j) Helipad
k) Service Floors.
l) Refuge Area.
m) Terrace Garden / Vertical Garden.
n) Water tank/ fire tanks Service plant for MEP (mechanical-electrical pump)
o) Pressure pumps
p) Vents
q) Fire hydrants

8. Building Materials, Structural System and other features:

Building Material:

a) Glass & steel


b) Mix of glass, steel and concrete
c) Energy efficient materials

Structural System: Type of Structural System and explanation

Other features: Any sustainable features or any special features about the building.