Professional Documents
Culture Documents
1. Introduction
a) Project Title.
b) Project Location.
c) Climatic Conditions
d) Distance from Airport/Bus Station/Railway Station/Metro / Landmarks
e) Project Boundary (Neighbourhood). North / South / East / West.
f) Project Boundary Dimension. North / South / East / West.
g) Site Frontage Dimension.
h) Site Area.
i) FAR.
j) Coverage.
k) Height
l) Set Backs
m) Land Use Breakup. (Commercial /Residential/Etc.)
n) Total Population of the Development. (Residential / Commercial)
o) Zoning of Usage.
p) Parking Facilities.
q) Security Arrangements (Entry/Exit/Internal)
r) Basements and Numbers.
s) Number of Floors of Buildings. (Commercial /Residential/Etc.)
2. Site (Masterplan)
3. Service Core
4. Podium
Multiplex:
a) Auditorium-4 Screens.
b) Lobby / Ticket Counter / Baggage / Checking Etc.
c) Food Stalls.
d) Rest Rooms – Gents / Ladies / Handicap / Feeding Room / Drinking Water Etc.
e) Staff Facility.
f) Offices.
Offices:
7. Services:
a) Electrical
b) Plumbing
c) water supply
d) HVAC
e) garbage chutes
f) data ducts
g) firefighting system (fire reservoir)
h) Gas piping
i) drinking water
j) Helipad
k) Service Floors.
l) Refuge Area.
m) Terrace Garden / Vertical Garden.
n) Water tank/ fire tanks Service plant for MEP (mechanical-electrical pump)
o) Pressure pumps
p) Vents
q) Fire hydrants
Building Material:
Other features: Any sustainable features or any special features about the building.