6.

4.6382

4.64

6.5
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.31
0.550
0.55

0.0809 0.30
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 6.65 x 6.65 7.7 x 7.7 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 6.65 x 6.65 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 8.45 + 14.422 + 4.680

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 20 16 Diamete 20 16 Diameter 20 25 20 25
Unit Unit
wt. wt.
(kg/m)
Spacin 2.47 1.58 Spacin 2.47 1.58 (kg/m) 2.47 3.85 2.47 3.85
g 0.16 0.25 g 0.16 0.25
Cutleng 7.16 6.70 Cutleng 7.16 6.70 Cutlength 3.51 3.51 0.75 0.938
Number 41 27 Number 41 27 Number 4 8
REINFORCEMENT 293.49 178.22 293.49 178.22Total Length 4.26 4.45
CLEAR COVER 0.05 m 0.05
Diameter 8 16 20 20 25
Diawise Weight 139 563 1450 168 548 142.32
Grand total Wt. Kg 2320.4 68.16
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


1618
Pad Transverse

0.31

0.0809 0.30
DEPTH OF PIT
= 211.96

= 181.52

= 30.437

= 3.317

= 27.552

= 47.5
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.5794 0.616
16 32 0.0676 0.0676

0.04 m 0.3677

347.57 R/M

kg/No. 0.000
7.5

4.6138

4.61

7.5
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.65
0.600

0.5431 0.35
0.6

###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 7.65 x 7.65 8.7 x 8.7 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 7.65 x 7.65 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 11.25 + 19.399 + 4.608

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 20 16 Diamete 20 16 Diameter 28 25 28 25
Unit Unit
wt. wt.
(kg/m)
Spacin 2.47 1.58 Spacin 2.47 1.58 (kg/m) 4.84 3.85 4.84 3.85
g 0.19 0.25 g 0.19 0.25
Cutleng 7.91 7.70 Cutleng 7.91 7.70 Cutlength 3.46 3.46 1.05 0.938
Number 40 31 Number 40 31 Number 8 8
REINFORCEMENT 316.55 238.7 316.55 238.7 Total Length 4.51 4.4
CLEAR COVER 0.05 m 0.05
Diameter 8 16 20 28 25
Diawise Weight 179 754 1564 699 542 140.72
Grand total Wt. Kg 3196 144.32
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


Pad Transverse

0.65

0.5431 0.35
DEPTH OF PIT
= 270.59

= 231.38

= 39.214

= 4.389

= 35.257

= 51.02
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
5.75

4.4448

3.44

4.75
0.5
0.5

0.3

GL GL
Vertical cut line

3.5

0.27
0.500

-0.0974 0.25
0.5

###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 5.9 x 4.9 6.95 x 6 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 5.9 x 4.9 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 5.463 + 8.504 + 3.300

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 20 16 Diamete 20 16 Diameter 28 25 28 25
Unit Unit
wt. wt.
(kg/m)
Spacin 2.47 1.58 Spacin 2.47 1.58 (kg/m) 4.84 3.85 4.84 3.85
g 0.15 0.25 g 0.15 0.25
Cutleng 6.68 5.95 Cutleng 5.68 4.95 Cutlength 3.51 3.51 1.05 0.938
Number 33 20 Number 39 24 Number 4 4
REINFORCEMENT 220.6 119 221.71 118.8 Total Length 4.56 4.45
CLEAR COVER 0.05 m 0.05
Diameter 8 16 20 28 25
Diawise Weight 83 376 1092 353 274 71.16
Grand total Wt. Kg 1904.6 72.96
GROUTING 1 m2 0.05 thk. 0.050 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF AN 1446


Pad Transverse

0.27

-0.0974 0.25
DEPTH OF PIT
= 147.84

= 128.71

= 19.135

= 2.168

= 17.267

= 38.52
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
1.872 1.3799 1.242 0.516
16 16 0.0441 0.0441

0.04 m 0.297

208.12 R/M

kg/No. 0.000
7.2

4.4168

3.42

6.2
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.62
0.550
0.55

0.5416 0.30
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 7.35 x 6.35 8.4 x 7.4 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 7.35 x 6.35 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 8.928 + 13.22 + 4.680

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 28 25 28 25
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 4.84 3.85 4.84 3.85
g 0.15 0.25 g 0.15 0.25
Cutleng 7.56 7.40 Cutleng 6.56 6.40 Cutlength 3.51 3.51 1.05 0.938
Number 42 26 Number 49 30 Number 4 8
REINFORCEMENT 317.39 192.4 321.28 192 Total Length 4.56 4.45
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 28 25
Diawise Weight 139 607 1009 353 548 142.32
Grand total Wt. Kg 2108.6 72.96
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


1616
Pad Transverse

0.62

0.5416 0.30
DEPTH OF PIT
= 222.22

= 192.32

= 29.896

= 3.5

= 26.828

= 48
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.5794 0.616
16 32 0.0676 0.0676

0.04 m 0.3677

347.57 R/M

kg/No. 0.000
6

4.44

3.44

5
0.5
0.5

0.3

GL GL
Vertical cut line

3.5

0.25
0.500

0.03 0.25
0.5

###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 6.15 x 5.15 7.2 x 6.2 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 6.15 x 5.15 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 6 + 8.901 + 3.300

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 28 25 28 25
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 4.84 3.58 4.84 3.85
g 0.11 0.25 g 0.11 0.25
Cutleng 6.64 6.20 Cutleng 5.64 5.20 Cutlength 3.51 3.51 1.05 0.938
Number 46 21 Number 55 25 Number 4 8
REINFORCEMENT 305.44 130.2 310.2 130 Total Length 4.56 4.45
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 28 25
Diawise Weight 115 411 973 353 510 142.32
Grand total Wt. Kg 1852.1 72.96
GROUTING 1 m2 0.05 thk. 0.050 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


1384
Pad Transverse

0.25

0.03 0.25
DEPTH OF PIT
= 159.59

= 139.31

= 20.276

= 2.375

= 18.201

= 39.1
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
1.872 1.3799 1.3126 0.516
16 32 0.0441 0.0441

0.04 m 0.297

287.82 R/M

kg/No. 0.000
7.95

4.4138

3.41

6.95
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.94
0.600

0.8681 0.35
0.6

###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 8.1 x 7.1 9.15 x 8 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 8.1 x 7.1 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 11.051 + 17.328 + 4.608

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 25 28 25 28
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 3.85 4.84 3.85 4.84
g 0.24 0.22 g 0.24 0.22
Cutleng 8.29 8.15 Cutleng 7.29 7.15 Cutlength 3.46 3.46 0.94 1.05
Number 30 33 Number 34 37 Number 8 8
REINFORCEMENT 248.81 268.95 247.99 264.55Total Length 4.3975 4.51
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 25 28
Diawise Weight 179 843 785 542 699 144.32
Grand total Wt. Kg 2349.1 140.72
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


1628
Pad Transverse

0.94

0.8681 0.35
DEPTH OF PIT
= 266.6

= 229.73

= 36.868

= 4.313

= 32.987

= 50.88
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
7.2

4.4168

3.42

6.2
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.62
0.550
0.55

0.5416 0.30
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 7.35 x 6.35 8.4 x 7.4 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 7.35 x 6.35 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 8.928 + 13.22 + 4.680

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 20 25 20 25
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 2.47 3.85 2.47 3.85
g 0.15 0.25 g 0.15 0.25
Cutleng 7.56 7.40 Cutleng 6.56 6.40 Cutlength 3.51 3.51 0.75 0.938
Number 42 26 Number 49 30 Number 8 8
REINFORCEMENT 317.39 192.4 321.28 192 Total Length 4.26 4.45
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 20 25
Diawise Weight 179 607 1009 337 548 142.32
Grand total Wt. Kg 2132.6 136.32
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


1616
Pad Transverse

0.62

0.5416 0.30
DEPTH OF PIT
= 222.22

= 192.32

= 29.896

= 3.5

= 26.828

= 48
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
9.2

4.3858

3.39

8.2
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

1.51
0.650
0.65

1.4571 0.40
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 9.35 x 8.35 10.4 x 9.4 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 9.35 x 8.35 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 15.088 + 23.81 + 4.536

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 20 Diamete 16 20 Diameter 32 28 32 28
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 2.47 Spacin 1.58 2.47 (kg/m) 6.32 4.84 6.32 4.84
g 0.2 0.15 g 0.2 0.15
Cutleng 9.51 9.40 Cutleng 8.51 8.40 Cutlength 3.41 3.41 1.2 1.05
Number 42 56 Number 47 62 Number 4 12
REINFORCEMENT 399.24 526.4 399.77 520.8 Total Length 4.61 4.46
CLEAR COVER 0.05 m 0.05
Diameter 8 20 16 32 28
Diawise Weight 179 2587 1262 466 1036 214.08
Grand total Wt. Kg 4494.6 73.76
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


Pad Transverse

1.51

1.4571 0.40
DEPTH OF PIT
= 349.49

= 300.63

= 48.857

= 5.855

= 43.434

= 55.52
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
6.8

4.428

3.43

5.8
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.45
0.550
0.55

0.336 0.30
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 6.95 x 5.95 8 x 7 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 6.95 x 5.95 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 7.888 + 12.375 + 4.680

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 25 20 25 20
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 3.85 2.47 3.85 2.47
g 0.15 0.25 g 0.15 0.25
Cutleng 7.23 7.00 Cutleng 6.23 6.00 Cutlength 3.51 3.51 0.94 0.75
Number 40 24 Number 46 28 Number 8 4
REINFORCEMENT 289.12 168 286.49 168 Total Length 4.4475 4.26
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 25 20
Diawise Weight 139 531 909 548 168 68.16
Grand total Wt. Kg 2127.3 142.32
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


1440
Pad Transverse

0.45

0.336 0.30
DEPTH OF PIT
= 200.2

= 172.59

= 27.612

= 3.101

= 24.943

= 47
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.5794 0.616
16 32 0.0676 0.0676

0.04 m 0.3677

347.57 R/M

kg/No. 0.000
8.7

4.3888

3.39

7.7
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

1.3
0.600

1.2556 0.35
0.6

###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 8.85 x 7.85 9.9 x 8.9 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 8.85 x 7.85 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 13.398 + 19.398 + 4.608

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 28 25 28 25
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 4.84 3.85 4.84 3.85
g 0.25 0.12 g 0.25 0.12
Cutleng 8.99 8.90 Cutleng 7.99 7.90 Cutlength 3.46 3.46 1.05 0.938
Number 32 65 Number 36 73 Number 12 4
REINFORCEMENT 287.64 578.5 287.6 576.7 Total Length 4.51 4.4
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 28 25
Diawise Weight 179 1825 909 1048 271 70.36
Grand total Wt. Kg 3961.3 216.48
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


2734
Pad Transverse

1.3

1.2556 0.35
DEPTH OF PIT
= 314.99

= 272.81

= 42.182

= 5.21

= 37.404

= 52.91
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
6.9

4.4168

4.42

6.9
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.49
0.550
0.55

0.3916 0.30
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 7.05 x 7.05 8.1 x 8.1 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 7.05 x 7.05 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 9.522 + 14.844 + 4.680

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 20 25 20 25
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 2.47 3.85 2.47 3.85
g 0.1 0.25 g 0.1 0.25
Cutleng 7.30 7.10 Cutleng 7.30 7.10 Cutlength 3.51 3.51 0.75 0.938
Number 70 29 Number 70 29 Number 8 8
REINFORCEMENT 510.78 205.9 510.78 205.9 Total Length 4.26 4.45
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 20 25
Diawise Weight 179 651 1614 337 548 142.32
Grand total Wt. Kg 2780.8 136.32
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


2265
Pad Transverse

0.49

0.3916 0.30
DEPTH OF PIT
= 234.56

= 202.22

= 32.342

= 3.728

= 29.046

= 48.5
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
8.8

4.3858

4.39

8.8
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

1.32
0.650
0.65

1.2571 0.40
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 8.95 x 8.95 10 x 10 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 8.95 x 8.95 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 15.488 + 25.84 + 4.536

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 20 Diamete 16 20 Diameter 32 28 32 28
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 2.47 Spacin 1.58 2.47 (kg/m) 6.32 4.84 6.32 4.84
g 0.25 0.12 g 0.25 0.12
Cutleng 9.13 9.00 Cutleng 9.13 9.00 Cutlength 3.41 3.41 1.2 1.05
Number 36 74 Number 36 74 Number 4 12
REINFORCEMENT 328.53 666 328.53 666 Total Length 4.61 4.46
CLEAR COVER 0.05 m 0.05
Diameter 8 20 16 32 28
Diawise Weight 179 3290 1038 466 1036 214.08
Grand total Wt. Kg 4973.8 73.76
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


Pad Transverse

1.32

1.2571 0.40
DEPTH OF PIT
= 357.5

= 306.06

= 51.44

= 6.008

= 45.864

= 55.81
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
7.8

4.4108

4.41

7.8
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

0.87
0.600

0.7946 0.35
0.6

###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 7.95 x 7.95 9 x 9 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 7.95 x 7.95 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 12.168 + 19.714 + 4.608

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 28 25 28 25
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 4.84 3.85 4.84 3.85
g 0.18 0.18 g 0.18 0.18
Cutleng 8.15 8.00 Cutleng 8.15 8.00 Cutlength 3.46 3.46 1.05 0.938
Number 44 44 Number 44 44 Number 8 8
REINFORCEMENT 358.64 352 358.64 352 Total Length 4.51 4.4
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 28 25
Diawise Weight 179 1112 1133 699 542 140.72
Grand total Wt. Kg 3123.5 144.32
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


2246
Pad Transverse

0.87

0.7946 0.35
DEPTH OF PIT
= 289.58

= 248.78

= 40.798

= 4.74

= 36.490

= 51.83
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
8.2

4.3888

4.39

8.2
0.6
0.6

0.3

GL GL
Vertical cut line

3.5

1.04
0.650
0.65

0.9556 0.40
###
0.525 0.08
0.075

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 8.35 x 8.35 9.4 x 9.4 x 3.575

BACKFILLING

SURPLUS EARTH

PCC 8.35 x 8.35 0.075

RCC =ABh+ (d-h) / 3 x {AB+ab+Sqrt.(Abab)} = 13.448 + 23.754 + 4.536

SHUTTERING
Pad Longitudinal Pad Transverse Column Longitudinal
Top Bottom Top Bottom In Column In Pad
Diamete 16 16 Diamete 16 16 Diameter 32 28 32 28
Unit Unit
wt. wt.
(kg/m)
Spacin 1.58 1.58 Spacin 1.58 1.58 (kg/m) 6.32 4.84 6.32 4.84
g 0.25 0.14 g 0.25 0.14
Cutleng 8.57 8.40 Cutleng 8.57 8.40 Cutlength 3.41 3.41 1.2 1.05
Number 34 59 Number 34 59 Number 4 12
REINFORCEMENT 291.34 495.6 291.34 495.6 Total Length 4.61 4.46
CLEAR COVER 0.05 m 0.05
Diameter 8 16 16 32 28
Diawise Weight 179 1566 921 466 1036 214.08
Grand total Wt. Kg 3132.3 73.76
GROUTING 1.44 m2 0.05 thk. 0.072 m3

FOUNDATION BOLT FIXING Nos. Dia. m long

TREATMENT IN FOUNDATION IF ANY


2487
Pad Transverse

1.04

0.9556 0.40
DEPTH OF PIT
= 315.89

= 269.36

= 46.535

= 5.229

= 41.738

= 54.07
Column Transverse
Stirrup- Stirrup- Stirrup-3
8 8 8

0.4 0.4 0.4


0.25 0.25 0.25
2.272 1.6628 1.752 0.616
16 32 0.0676 0.0676
32
0.04 m 0.3677

448.51 R/M

kg/No. 0.000
2.1

2.1
0.5
0.5

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 2.25 x 2.25 2.7 x 2.7 x 1.6 = 11.66

BACKFILLING 8.963

SURPLUS EARTH 2.70

PCC 2.25 x 2.25 0.1 = 0.506

RCC = Abh+ab(H+h)} = 1.103 + 1.163 + = 2.266

SHUTTERING = 12.4
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 12 Diamete 10 12 Diameter 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.62 0.89 Spacin 0.62 0.89 (kg/m) 0.89 0.89 0.4 0.4
Spacing 0.25 0.2 g 0.25 0.2 0.19 0.19
Cutlength 2.30 2.30 Cutleng 2.30 2.30 Cutlength 1.76 0.45 1.872 1.380 1.276 0.0441 0.0441
Number 9 11 Number 9 11 Number 8 9 9
REINFORCEMENT R/M 20.7 25.3 20.7 25.3 Total Length 2.21 0
CLEAR COVER 0.05 m 0.04 0.04 0.297
Diameter 8 10 12 12
Diawise Weight 33.6832 25.668 45.034 47.206
Grand total Wt. Kg 151.591 17.68 84.2
GROUTING 0.25 m2 0.05 thk. 0.013 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


70.702
1.5

1.5
1
1

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 1.65 x 1.65 2.1 x 2.1 x 1.6 = 7.06

BACKFILLING 5.455

SURPLUS EARTH 1.61

PCC 1.65 x 1.65 0.1 = 0.272

RCC = Abh+ab(H+h)} = 0.563 + 0.65 + 0.420 = 1.633

SHUTTERING = 9.76
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 10 Diamete 10 10 Diameter 12 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.62 0.62 Spacin 0.62 0.62 (kg/m) 0.89 0.89 0.89 0.4 0.4
Spacing 0.25 0.25 g 0.25 0.25 0.19 0.19 0.19
Cutlength 1.70 1.70 Cutleng 1.70 1.70 Cutlength 2.01 1.3 0.45 3.872 3.136 2.462 0.2116 0.2116
Number 6.6 6.6 Number 6.6 6.6 Number 14.26667 8 9 12 4
REINFORCEMENT R/M 11.22 11.22 11.22 11.22 Total Length 2.46 1.3
CLEAR COVER 0.05 m 0.04 0.04 0.6505
Diameter 8 10 12
Diawise Weight 32.5161 27.826 40.491
Grand total Wt. Kg 100.833 45.496 81.3
GROUTING 1 m2 0.05 thk. 0.050 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


27.826
1.75

1.75
0.6
0.6

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 1.9 x 1.9 2.35 x 2.4 x 1.6 = 8.84

BACKFILLING 7.263

SURPLUS EARTH 1.58

PCC 1.9 x 1.9 0.1 = 0.361

RCC = Abh+ab(H+h)} = 0.766 + 0.558 + 0.000 = 1.324

SHUTTERING = 6.35
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 10 Diamete 10 10 Diameter 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.62 0.62 Spacin 0.62 0.62 (kg/m) 0.89 0.89 0.4 0.4
Spacing 0.25 0.25 g 0.25 0.25 0.19 0.19
Cutlength 1.95 1.95 Cutleng 1.95 1.95 Cutlength 1.81 0.45 2.272 1.663 1.496 0.0676 0.0676
Number 6.6 6.6 Number 6.6 6.6 Number 8 10 10
REINFORCEMENT R/M 12.87 12.87 12.87 12.87 Total Length 2.26 0
CLEAR COVER 0.05 m 0.04 0.04 0.3677
Diameter 8 10 12
Diawise Weight 14.9936 31.918 16.091
Grand total Wt. Kg 63.0024 18.08 37.5
GROUTING 0.36 m2 0.05 thk. 0.018 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


31.918
1.4

1.4
0.55
0.55

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 1.55 x 1.55 2 x 2 x 1.6 = 6.4

BACKFILLING 5.292

SURPLUS EARTH 1.11

PCC 1.55 x 1.55 0.1 = 0.24

RCC = Abh+ab(H+h)} = 0.49 + 0.469 + 0.000 = 0.959

SHUTTERING = 5.54
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 10 Diamete 10 10 Diameter 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.62 0.62 Spacin 0.62 0.62 (kg/m) 0.89 0.89 0.4 0.4
Spacing 0.25 0.25 g 0.25 0.25 0.19 0.19
Cutlength 1.60 1.60 Cutleng 1.60 1.60 Cutlength 1.785 0.45 2.072 1.521 1.386 0.0552 0.0552
Number 5.2 5.2 Number 5.2 5.2 Number 8 9 9
REINFORCEMENT R/M 8.32 8.32 8.32 8.32 Total Length 2.235 0
CLEAR COVER 0.05 m 0.04 0.04 0.3323
Diameter 8 10 12
Diawise Weight 13.5035 20.634 15.913
Grand total Wt. Kg 50.0503 17.88 33.8
GROUTING 0.3025 m2 0.05 thk. 0.015 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


20.634
1.7

1.7
0.6
0.6

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 1.85 x 1.85 2.3 x 2.3 x 1.6 = 8.46

BACKFILLING 6.945

SURPLUS EARTH 1.52

PCC 1.85 x 1.85 0.1 = 0.342

RCC = Abh+ab(H+h)} = 0.723 + 0.558 + 0.000 = 1.281

SHUTTERING = 6.28
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 10 Diamete 10 10 Diameter 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.62 0.62 Spacin 0.62 0.62 (kg/m) 0.89 0.89 0.4 0.4
Spacing 0.25 0.25 g 0.25 0.25 0.19 0.19
Cutlength 1.90 1.90 Cutleng 1.90 1.90 Cutlength 1.81 0.45 2.272 1.663 1.496 0.0676 0.0676
Number 6.4 6.4 Number 6.4 6.4 Number 8 10 10
REINFORCEMENT R/M 12.16 12.16 12.16 12.16 Total Length 2.26 0
CLEAR COVER 0.05 m 0.04 0.04 0.3677
Diameter 8 10 12
Diawise Weight 14.9936 30.157 16.091
Grand total Wt. Kg 61.2416 18.08 37.5
GROUTING 0.36 m2 0.05 thk. 0.018 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


30.157
1.5

1.5
0.55
0.55

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 1.65 x 1.65 2.1 x 2.1 x 1.6 = 7.06

BACKFILLING 5.847

SURPLUS EARTH 1.21

PCC 1.65 x 1.65 0.1 = 0.272

RCC = Abh+ab(H+h)} = 0.563 + 0.469 + 0.000 = 1.032

SHUTTERING = 5.68
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 16 Diamete 10 16 Diameter 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.61654 1.5783 Spacin 0.6165 1.5783 (kg/m) 0.89 0.89 0.4 0.4
Spacing 0.25 0.25 g 0.25 0.25 0.19 0.19
Cutlength 1.70 1.70 Cutleng 1.70 1.70 Cutlength 1.785 0.45 2.072 1.521 1.386 0.0552 0.0552
Number 5.6 5.6 Number 5.6 5.6 Number 8 9 9
REINFORCEMENT R/M 9.52 9.52 9.52 9.52 Total Length 2.235 0
CLEAR COVER 0.05 m 0.04 0.04 0.3323
Diameter 8 16 12
Diawise Weight 13.5035 60.103 15.913
Grand total Wt. Kg 89.5197 17.88 33.8
GROUTING 0.3025 m2 0.05 thk. 0.015 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


60.103
1.5

1.5
0.5
0.5

0.3

GL GL
1.5
VERTI

LINE
CAL
CUT

0.25

0.1
0.1

0.23

P.C.C EDGE PLAN CLEARANCE PLAN DEPTH OF PIT


EXCAVATION 1.65 x 1.65 2.1 x 2.1 x 1.6 = 7.06

BACKFILLING 5.912

SURPLUS EARTH 1.15

PCC 1.65 x 1.65 0.1 = 0.272

RCC = Abh+ab(H+h)} = 0.563 + 0.388 + 0.000 = 0.951

SHUTTERING = 5.36
Pad Longitudinal Pad Transverse Column Longitudinal Column Transverse
Top Bottom Top Bottom In Column In Pad Stirrup- Stirrup- Stirrup-3
Diameter 10 10 Diamete 10 10 Diameter 12 12 8 8 8
Unit wt. Unit wt.
(kg/m) 0.62 0.62 Spacin 0.62 0.62 (kg/m) 0.89 0.89 0.4 0.4
Spacing 0.25 0.25 g 0.25 0.25 0.19 0.19
Cutlength 1.70 1.70 Cutleng 1.70 1.70 Cutlength 1.76 0.45 1.872 1.380 1.276 0.0441 0.0441
Number 5.6 5.6 Number 5.6 5.6 Number 8 9 9
REINFORCEMENT R/M 9.52 9.52 9.52 9.52 Total Length 2.21 0
CLEAR COVER 0.05 m 0.04 0.04 0.297
Diameter 8 10 12
Diawise Weight 12.0493 23.61 15.735
Grand total Wt. Kg 51.3941 17.68 30.1
GROUTING 0.25 m2 0.05 thk. 0.013 m3

FOUNDATION BOLT FIXING Nos. Dia. m long kg/No. 0.000

TREATMENT IN FOUNDATION IF ANY


23.61