You are on page 1of 5

Maintenance guide

- Cape-Golden PSA N2 & O2 Plants


No matter in material production type enterprise, or in equipment manufacturing industry,
the facility in production line or in manufacturing workshop is not only fixed assets, but also
the source of enterprise productivity, manufacturing ability and benefit,

To keep the good working performance of equipments, exert the plants’ efficiency,
prolong the service life, make higher and stable benefit, reduce or even avoid abrupt faults,
the plants must be operated properly. The maintenance is the base of various works
including management, operation, maintenance and repair, is a positive preventive works,
and is also the objective requirements for the system running.

In the process of long-term and different environment, the motion of matters and
chemical action will lead to abnormal phenomena which is hard to avoid, for example,
component wear, aging, looseness, corrosion, enlarged interspace and other hidden dangers,
if these abnormal phenomena are not disposed in time, the original balance will be
influenced directly, the reliability, stability and benefit will be reduced, inherent
performance will be lost, and lead to loss for the company. Beijing Cape Golden Gas System Company Ltd.
Web: https://www.cape-golden.com/
Maintenance guide -
Cape-Golden PSA N2 & O2 Plants
As we all know, the ultimate purpose of the maintenance is to improve the running
conditions, keep all kinds of performance index, increase production rate and utilization,
prolong the service life and avoid the unnecessary damages.

For this purpose, scientific and effective administrative mechanism must be built, that is,
increasing the daily management, combining theory and practice, making the maintenance
schedule scientifically and reasonably, and emphasizing “prevention first, maintenance
based”.

Routine maintenance is to inspect and maintain the plant regularly, and to keep the
records of operation and maintenance, certainly, referring to the instruction book is also a
good choice.

Beijing Cape Golden Gas System Company Ltd.
Web: https://www.cape-golden.com/
Maintenance Refrigerant PSA N2/O2 Plant O2 Compressor O2 Compressor
package Air compressor Dryer Bailian Zhongding
2nd stage vulnerable parts
Air filter 3rd stage vulnerable parts
2000 Hours Oil filter Filter elements 4th stage vulnerable parts
Lubricant Steam-water separator kit 1st stage stuffing valve
- 3 months Steam-water separator kit 2nd stage stuffing valve

Air filter 1st stage vulnerable parts


Oil filter Filter elements 2nd stage vulnerable parts
Lubricant Electronic drain valve 3rd stage vulnerable parts
4000 Hours Steam-water separator kit Steam-water separator kit 4th stage vulnerable parts
- 6 months Belt Activated carbon 1st stage stuffing valve
Oil-gas separator 2nd stage stuffing valve
Motor grease

6000 Hours 2nd stage vulnerable parts


- 9 months Air filter Filter elements 3rd stage vulnerable parts
Oil filter Steam-water separator kit 4th stage vulnerable parts
Lubricant 1st stage stuffing valve
Steam-water separator kit 2nd stage stuffing valve

Beijing Cape Golden Gas System Company Ltd.
Web: https://www.cape-golden.com/
3
Maintenanc Refrigerant PSA N2/O2 O2 Compressor O2 Compressor
e package Air compressor dryer Bailian Zhongding
Plant

Air filter
Oil filter Oil filling valve
Lubricant 1st stage vulnerable parts Oil draining valve
Steam-water separator kit 2nd stage vulnerable inlet valve
Load/unload valve parts discharge valve
Minimum pressure valve Electronic drain 3rd stage vulnerable parts seal ring
8000 hours Thermostatic valve valve 4th stage vulnerable parts Gasket
---1 year Oil cut-off valve Dust proof screen 1st stage stuffing valve O-ring
Check valve Check coolant 2nd stage stuffing valve gas side/oil side
Clean radiator diaphragm
Clean carbon deposition in oil intermediate
pipe diaphragm
Change oil/gas pipes
Dryer filter
Electronic drain Check molecular sieve,
2 years As 1 year package valve change the tightening As 1 year package As 1 year package
Dust proof screen device kit (mat, silk
Check coolant screen, seal ring)
Hot gas by-pass valve
Dryer filter

3-5 years Rotor, bearing overhaul


Expansion valve
Cooling fan As 1 year package As 1 year package
Expansion valve Change molecular
Others as 2 years sieve
package
Beijing Cape Golden Gas System Company Ltd.
Web: https://www.cape-golden.com/
4
Maintenanc Refrigerant PSA N2/O2 O2 Compressor O2 Compressor
e package Air compressor dryer Bailian Zhongding
Plant

PLC
HMI
Continuous Tightening device kit Warning
work for 24 Temperature sensor device
Pressure sensor As 1 year package Oxygen analyzer As 1 year package As 1 year package
hours (8000h)content maintenance Pneumatic valve
(without Add molecular sieve
(8000h) content maintenance
standby)

Beijing Cape Golden Gas System Company Ltd.
Web: https://www.cape-golden.com/
5

You might also like