(Rev01)
VOLUME 1
TECHNICAL DESIGN DESCRIPTION
1
(bao gồm các HT phụ trợ tuabin hiện đang có trong Mục 1.2 chương 1 bản Rev00, và:
- Mục 1.2.8 hiện tại chuyển sang chương 5 trong bản rev01
- Giữ mục 1.2.9.5 hiện tại, tuy nhiên đổi đánh số heading cho ngang với các mục
lớn khác như 1.2.1, 1.2.2 v.v…
- Mục các tiêu chuẩn: bổ sung các tiêu chuẩn chỉ cho phần tuabin hơi & TB phụ
trợ
Chapter 3 – ELECTRIC GENERATOR AND ACCESSORIES
(nội dung như trong mục 1.3 chương 1 bản Rev00, cần đánh lại heading cho phù hợp)
2
VOLUME 2
TECHNICAL DESIGN DRAWINGS
VOLUME 3
APPENDICES AND CALCULATION ANNEXES
APPENDICES:
Appendix 1 – Soil Investigation report
Appendix 2 – Seismic Hazardous Assessment report
Appendix 3 – Meteo - hydrology data report
Appendix 4 – Grid Connection report
Appendix 5 – Telecommunication report
Appendix 6 – SCADA report
Appendix 7 – Fire Protection System Technical Design report
Appendix 8 – Forms of Technical Schedule
CALCULATION ANNEXES:
Calculation Annex No.1 – Technical calculations for Mechanical and Electrical
Calculation Annex No.2 – Technical calculations for Structural Construction
Calculation Annex No.3 – Project economic - financial analysis in Technical
Design stage (later)
3
<PROPOSED CONTENT OF ANNEX 2 - TECHNICAL CALCULATIONS>
No
CALCULATIONS REMARKS
.
MECHANICAL PART
1 Unit Steam Conditions Optimization Study Thắng
2 Unit BFP Drive Method Optimization Study Thắng
Thắng
3 Unit Heat Balance Diagrams
- RO condition Outputs of these
calculations include coal
- TCC condition and limestone
consumptions
- 75% RO condition
- 50% RO condition
4 Plant water balance calculation Thạo
5 Ash handling system water balance calculation Thạo
6 Fire water system capacity calculation Hỏi ngay PCC
- Fire water tank capacity
- Fire pump capacity
Huyền
4
No
CALCULATIONS REMARKS
.
5
II. PROPOSED CONTENT OF EPC REQUIREMENT DOSSIER
VOLUME 1:
INSTRUCTIONS TO BIDDER
Chapter I
Chapter II
Chapter III
Chapter IV
Chapter V
Chapter VI
---------------------------
6
VOLUME 2:
TECHNICAL REQUIREMENTS
7
- Coal unloading jetty
- Freshwater pumpstation and supply pipeline
3.2 Site conditions
3.2.1 Topographical condition
3.2.2 Geological condition
3.2.3 Geological engineering condition
3.2.4 Geological condition at main areas of the plant
3.2.5 Seism condition
3.2.6 Geo-hydrology condition
3.2.7 Meteorological conditions
3.2.7.1 Ambient air temperature
3.2.7.2 Air humidity
3.2.7.3 Solar radiation
3.2.7.4 Rain
3.2.7.5 Evaporation
3.2.7.6 Wind and storm
3.2.7.7 Atmospheric pressure
3.2.8 Hydrology and sea conditions
4. PROJECT MANAGEMENT AND IMPLEMENTATION
4.1 Project Implementation Method
4.1.1 The Owner
4.1.2 EPC contractor
4.1.3 Requirement for EPC packaging
4.2 Project management and construction supervision
4.3 Project implementation organization
4.4 Environment protection measures during construction
4.5 Project construction schedule
5. EVALUATION AND MANAGEMENT OF THE PROJECT RISKS
5.1 Identification of the project risks
5.2 Evaluation of the project risks
5.3 Management of the project risks
9
5. CONSTRUCTIONAL DESIGN
5.1. General information about construction site
5.2. Design requirements
5.2.1. Loads and impacts
5.2.2. Ground soil and foundation conditions
5.2.3. Anti-seismic design requirement
5.2.4. Surface water run-off requirement
5.2.5. Requirements on building/ house structure
5.2.6. Requirements on architectural design
5.2.7. Solutions for concrete protection
5.2.8. Solutions for structural steel protection
5.3. Main buildings/ houses/ structures of the plant
5.4. Execution measures
5.4.1. Construction site lay-out
5.4.2. Transportation of equipment and materials to construction site
5.4.3. Requirements on construction materials and supply sources
5.4.4. Construction measures and solutions
5.4.5. Means and vehicles for construction
10
1.5. Turbine - generator control and protection
1.6. Requirement on commissioning/ testing and acceptance test
1.7. Applicable codes and standards
2. BALANCE OF PLANT (BOP)
2.1. FRESHWATER SUPPLY SYSTEM
2.1.1 General
2.1.2 Scope of work/ supply
2.1.3 Technical requirements and specifications
2.1.4 Applicable codes and standards
2.2. WATER TREATMENT SYSTEM
2.2.1 General
2.2.2 Scope of work/ supply
2.2.3 Technical requirements and specifications
- Water pre-treatment system
- Potable and service water system
- Demineralized water system
2.2.4 Requirement on commissioning/ testing and acceptance test
2.2.5 Applicable codes and standards
2.3. WASTEWATER TREATMENT SYSTEM
2.3.1 General
2.3.2 Scope of work/ supply
2.3.3 Technical requirements and specifications
2.3.4 Requirement on commissioning/ testing and acceptance test
2.3.5 Applicable codes and standards
2.4. COOLING WATER SYSTEM
2.4.1 General
2.4.2 Scope of work/ supply
2.4.3 Technical requirements and specifications
2.4.4 Auxiliary cooling water system
2.4.5 Requirement on commissioning/ testing and acceptance test
2.4.6 Applicable codes and standards
2.5. COAL HANDLING PLANT
2.5.1 General
2.5.2 Scope of work/ supply
2.5.3 Technical requirements and specifications
2.5.4 Requirement on commissioning/ testing and acceptance test
2.5.5 Applicable codes and standards
2.6. LIMESTONE HANDLING SYSTEM
2.6.1 General
2.6.2 Scope of work/ supply
2.6.3 Technical requirements and specifications
2.6.4 Requirement on commissioning/ testing and acceptance test
2.6.5 Applicable codes and standards
2.7. DO HANDLING SYSTEM
2.7.1 General
2.7.2 Scope of work/ supply
2.7.3 Technical requirements and specifications
2.7.4 Requirement on commissioning/ testing and acceptance test
2.7.5 Applicable codes and standards
11
2.8. ASH HANDLING SYSTEM
2.7.1 General
2.7.2 Scope of work/ supply
2.7.3 Technical requirements and specifications
2.7.4 Requirement on commissioning/ testing and acceptance test
2.7.5 Applicable codes and standards
2.9. HYDROGEN SUPPLY SYSTEM
2.9.1 General
2.9.2 Scope of work/ supply
2.9.3 Technical requirements and specifications
2.9.4 Requirement on commissioning/ testing and acceptance test
2.9.5 Applicable codes and standards
2.10. COMPRESSED AIR SYSTEM
2.10.1 General
2.10.2 Scope of work/ supply
2.10.3 Technical requirements and specifications
2.10.4 Requirement on commissioning/ testing and acceptance test
2.10.5 Applicable codes and standards
2.11. FIRE DETECTION AND FIGHTING SYSTEM
2.11.1 General
2.11.2 Scope of work/ supply
2.11.3 Technical requirements and specifications
- Fire detection and alarming system
- Fire water system
- Other fire extinguishing systems
2.11.4 Requirement on commissioning/ testing and acceptance test
2.11.5 Applicable codes and standards
2.12. OTHER AUXILIARY SYSTEMS/ EQUIPMENT
2.12.1 General
2.12.2 Scope of work/ supply
2.12.3 Technical requirements and specifications
2.12.4 Applicable codes and standards
3. PLANT ELECTRICAL SYSTEMS
3.1. General
3.2. Scope of work/ supply
3.3. Technical requirements and specifications
3.3.1. Transformers
3.3.2. HV switchyard equipment
3.3.3. Plant auxiliary electrical equipment
3.3.4. UPS
3.3.5. DC and battery system
3.3.6. Emergency diesel generators
3.3.7. Earthing and lightening protection system
3.3.8. Lighting system
3.3.9. Telecommunication system / SCADA
3.3.10. Others
3.4. Requirement on commissioning/ testing and acceptance test
3.5. Applicable codes and standards
4. CONTROL AND INSTRUMENTATION
12
4.1. Oveview of plant control and instrumentation philosophy
4.2. System description
4.3. Scope of work/ supply
4.4. Technical requirements and specifications
4.5. Requirement on commissioning/ testing and acceptance test
4.6. Applicable codes and standards
I. DRAWINGS
13
1. PLANT LAYOUT AND GENERAL ARRANGMENT DRAWINGS
2. HEAT BALANCE DIAGRAMS, P&IDs and OTHER MECHANICAL DRAWINGS
3. ELECTRICAL DRAWINGS
4. C&I DRAWINGS
5. CIVIL AND STRUCTURAL DRAWINGS
6. ENGINEERING GEOLOGICAL SECTION DRAWINGS
----------------------------
VOLUME 4:
CONTRACT REQUIREMENTS
PART I
PART II
DRAFT OF CONTRACT
14
III. PROPOSED CONTENT OF TOTAL COST ESTIMATE
15