S1 1400 cu.m 0.708 991.2 G 3/4 1500 cu.m 0.56 840 Cement 240 bag 8 1920 Admix 34 lit 3.2 108.8 Water 1 lit 153.9 153.9 Sub total 4013.9
5000 psi 3/4 28 days ORD COST PER CU.M.
DESIGNATION UNIT COST UNIT QUANTITY TOTAL COST S1 1400 cu.m 0.66 924 G 3/4 1500 cu.m 0.56 840 Cement 240 bag 9 2160 Admix 34 lit 3.6 122.4 Water 1 lit 153.9 153.9 Sub total 4200.3
3000 psi 3/4 28 days ORD COST PER CU.M.
DESIGNATION UNIT COST UNIT QUANTITY TOTAL COST S1 1400 cu.m 0.7 980 G 3/4 1500 cu.m 0.56 840 Cement 240 bag 7 1680 Admix 34 lit 2.8 95.2 Water 1 lit 153.9 153.9 Sub total 3749.1
1500 psi 3/4 28 days ORD COST PER CU.M.
DESIGNATION UNIT COST UNIT QUANTITY TOTAL COST S1 1400 cu.m 0.74 1036 G 3/4 1500 cu.m 0.56 840 Cement 240 bag 5 1200 Admix 34 lit 2 68 Water 1 lit 153.9 153.9 Sub total 3297.9
DUNGON BRIDGE - CONCRETE COST ESTIMATE
DESIGNATION DESIGN MIX UNIT COST per cu.m. VOLUME (cu.m.) TOTAL COST Bored Pile 4000 psi 3/4 28 days 4013.9 70 280,973.00 Girder 5000 psi 3/4 28 days 3749.1 48 179,956.80 Railings 3000 psi 3/4 28 days 4200.3 8 33,602.40 Item 405 4000 psi 3/4 28 days 4013.9 120 481,668.00 Lean Concrete 1500 psi 3/4 28 days 3297.9 12 39,574.80 Sub total 1,015,775.00
MAYUWI BRIDGE - CONCRETE COST ESTIMATE
DESIGNATION DESIGN MIX UNIT PRICE per cu.m. VOLUME (cu.m.) TOTAL PRICE Bored Pile 4000 psi 3/4 28 days 4013.9 70 280,973.00 Girder 5000 psi 3/4 28 days 3749.1 32 119,971.20 Railings 3000 psi 3/4 28 days 4200.3 8 33,602.40 Item 405 4000 psi 3/4 28 days 4013.9 147 590,043.30 Lean Concrete 1500 psi 3/4 28 days 3297.9 12 39,574.80 Sub total 1,064,164.70