M/s HUTINI is requested to submit the revised erection drawing of
DM water storage tank incorporating our comments since erection is under progress. Structural drawing and piping GA drawing along with BOQ may please be submitted in line with This manhole has erection drawing. been constructed at GA Drawings of CO2 absorber is not yet submitted kindly submit the same. angle 0 degree as per site condition.
Kindly relocate the
ladder as per orientation of Manhole M1. This manhole has been constructed at angle 180 degree as per site condition.