wratery aftara yd fernezer, Lon
(Design Cell)
Website-http://pwd.uk.gov.in E-Mail-ddpwduk@gmail.com
— ———————._ $$ rrm
Waim— 32q6 /197 Moyo /2022 fete: 07/05 /2022
war 4,
after sara
sia wes, atoPofto
att
fra: aware ¥ sin ah we Rea 160 Aho war se shew Bq B Ya Rrorer Pers ah
eae aftr ats 3 oRaes Og ae aes rer S faedaor } wa 3)
dak STH TA WeAT 790/180 Pais 30/04 /2022
ort efter Ga an rea TET Tar 2 Ra Maeva PTA ger Prato
ade—ooharr tad og VI oT Gos H ony Savant ¥ zim aA ae Afr 160 Ho
wrarg & omovhowho Mgrs Og 8 era afer ava a uae a srqUeT are eA By ge
wea 8 va ws Soar ar dg A a aes amner & edo a AE wer a mA z
fort ones art ge wrafera wt carttet wkerr 8y wueer aera ae By yet aK aes erTaT
ferrciaer Ree or era Terr REET Ber Ere Pen war} cen sea wera By
Worm: Rey aA ot
(¢o do WM oh)
. (¢ Rr aferar (Prats)
sine Prafeafed wr yet vd oraeaa orkarg 8g Ofte x
1. Fer after eR—1 atta grates choftofto wet areata |
2. afer oftera gree get cof tof vst ——T ten
02S -
LeneTechnical Review Report
Project Director L&T Construction has vide his letter no, LNT/RKSH-KNPG/P4/2022/TBM TRe1
Dated 21.04.2022 submitted to the Executive Engineer Provincial Division PWD Pauri that they
are executing the construction works for the package 4 in connection with the new BG line
between Rishikesh and Karnprayag wherein the construction of tunnels using NATM and TBM
methodologies is being adopted. Accordingly, they need to transport two tunnel boring machines
(TBMs) from Mumbai Port/Nhava Sheva Port/Mundra Port to the project site at Saur Village,
Devprayag.
M/s Express Global Logistic Private Limited, the firm engaged by L&T for transportation of TBMs
including over-dimensional and heavy consignment has submitted to the Executive Engineer PD
PWO Pauri a Bridge evaluation Report for transportation of the TBMs over the Cantilever Major
Bridge over river Ganga for a pier-to-pier span of 87 m. The length of the RCC bridge reported by
the Executive Engineer in his letter dated 30.04.2022 is 160 m and as per the evaluation report
submitted by M/s Express Global Logistic Private Limited, the total length of the bridge is 161.00
‘m with the middle 87.00 m span to be checked for loads.
As per letter no. 42/BPUS/ATHTI/ ara / thst / 20 of Deputy Project Manager (BDU-5) of Uttar
Pradesh State Bridge Corporation Ltd., provided by the Executive Engineer PD PWD Pauri, the
bridge has been designed and is safe for 2 lanes of Class ‘A’ and 1 lane of Class 70 R’.A study of
the bridge evaluation report submitted by M/s Express Global Logistic Private Limited has been
carried out at the Design Cell and by the provisions of the IRC SP-37 2010 (Guidelines for
Evaluation of Load Carrying Capacity of Bridges). The following observations are submitted for
consideration: -
1. The bridge has been constructed between the years 1998 to 2001 as per the letter of the
Deputy Project manager of UP Bridge Corporation and it has been assumed that the
design of the bridge was carried out using the Working Stress Method of design. The
design report or the as-built drawings of the bridge are not available with Provincial
Division PWO Pauri. Therefore, M/s Express Global Logistic Private Limited has assumed
a Cross-section of the bridge including the deck, railing, and crash barrier, and arrived at
the dead load moments and shear force.
2. Bs per clause 5.3.5 Design Philosophy of the IRC $P:37- 2010, for working stress design,
the allowable stresses to be considered will be the higher value of a) Allowable stresses
considered in original contract documents such as original design calculations and
technical specifications, b) As provided in Annex 2, but limited to ¢) allowable stresses
obtained from strength tests by field and laboratory investigations, The bridge evaluation
report submitted by M/s Express Global Logistic Private Limited has adopted the
allowable stresses as provided in Annex 1 of the IRC SP:37-2010 which states for the cave
Of concrete and masonry bridges that the permissible stresses of 33.3 percent over the
values specified in the relevant IRC Standard Specifications and Codes of Practices for
Road Bridges and Design Criteria shall be allowed. This has been done without carrying
Out any strength tests by field and laboratory investigations required to be done as per
Clause 5.3.3 Materials, of the IRC SP:37-2010.
. aEThe technical review of the bridge evaluation re
The bridge evaluation report submitted by M/s Express Global Logistic Private Limited is
Purely analytical i.e., a comparison of the Bending Moment and Shear Force for the design
ive Load and the Consignment Live Load obtained using the Staad Pro software has been
Catried out considering no deterioration and reduction in carrying capacity of the bridge
The evaluation report does not refer to any information about the original material
specifications or the year of construction. If this information is not available, an
assessment of the strength of concrete must be made using examination and tests as
appropriate. The bridge is a prestressed concrete bridge. As per clause 5.3.3 Materials
Li) the effect of long-term prestressing losses, and creep shrinkage effects if any must
also be included in the evaluation report to assess the present carrying capacity.
The stad pro model provided to the design cell has been reviewed and it is observed
that the analysis provided in the bridge evaluation report is based on the comparison of
the Bending Moments and Shear Force for the dead load (assumed section), design live
load (Class 70 R and Class A single lane) and consignment load (8 axles of 28.75 t weight
each on a trailer of length 16.7 m). This comparative analysis is acceptable for the
situation when the bridge's carrying capacity is considered the same as when it was put
into service and there is no deterioration in the quality of the bridge components
including, bearings, piers, and foundation apart from the superstructure,
Based on the discussion above, if Executive Engineer PD PWD Pauri decides to issue a no
objection to L&T for the passage of the trailer carrying the tunnel boring machine, the
following must also be considered: -
3 The physical dimensions of the consignment must be such as not to damage any
Permanent part of the bridge.
b. The load on each of the 8 axles of the trailer has been taken as 28.75 t, it must be
Grsured that the carrier trailer is hydraulically controlled to spread the load equally.
¢- Water current forces as applicable at the time of transportation must be considered.
Port as above is being provided to Executive
Engineer PD PWD Pauri for further necessary action,