SL No Activity Description 'Scheme No'': Work Flow & Work Status
SL No Activity Description 'Scheme No'': Work Flow & Work Status
5 Trench Excavation
7 Equipment installation
8 Backfilling
9 Interlock reinstatement
2 7
b labour will be given to eng.jijo
DIV-415-21-110 ND-415-20-323 PTS-LV-41625-20 PTS-LV-39849-21
swihan Jimi Jimi Yahar
90%
transco stop us
2 NDRC are required + tiles #Required green area, tile
permit Gasco Noc + tiles permit
lifting permit
PTS-LV-38796-20 ND-415-20-192 Town
ND-415-21-26 Shwaib
Center Al Ain Center
Tiles permit is required + NDRC permit Green area permit + Tiles permit Green area permit + Tiles permit
PTS-LV-40710-21 PTS-LV-41536-21 Al PTS-LV-40278-21 City
Al Senaya Sarooj Centre
A proposal still not submited Transco line A proposal still not submited
PTS-LV-38797-20 Town PTS-LV-38659-20 Town PTS-LV-38667-20
Center Center Town Center
Tiles permit is required Tiles permit is required + NDRC is the foundation is damged
required + Green Area permit
PTS-LV-40908-21 Al PTS-LV-40008-21 ND-415-21-186
Hili Industrial Area Towayya
As built drawing
Completion
Commissioning
Joint Measurement
DIV-415-20-54 ND-415-219
DIV-11-20-91
SAROOJ
Sarooj Al Yahar MUTHARTH
PTS-LV-39192-20 PTS-LV-39130-20 PTS-LV-39129-20 ND-415-20-80
`
PTS-LV-41049-21 PTS-LV-41057-21 PTS-LV-41103-21 PTS-LV-40361-21
Al qattara
RECOVERY
SCHEME NUMBER EQUIPMENTS CABLE SIZE
PTS-LV-39129-20 FP 6-WAY
4Cx70mm
AL KHAZNA KZST0083
PTS-LV-39130-20 ST
4CX25mm
AL SALAMAT SDST1142
ND-20-415-136
- 4cX120mm
Shouiba
PTS-LV-39203-20
- 4cx50mm
Asharej
PTS-LV-39192-20
- 4cx70mm
AL Salamat
ND-11-20-78
- 4cx70mm
Markhania
DIV-20-415
- 4CX25mm
Sarooj
OHL-11-20-145
Saad
ND-415-219
- 4cx70mm
Al Yahar
PTS-LV-38745-20 - 4cx70mm
Al Wagan (Waris site)
ND-415-20-112 Salamat
PTS-LV-39083-20 Muajei
OHL-11-20-201
PTS-LV-39415-20
OHL-11-20-248
PTS-LV-38587-20
PTS-LV-40524-20
PTS-LV-40582-21
ND-415-20-323 4cx70mm
ND-415-20-94 4cx70mm
PTS-LV-40367-20 4cx25mm
ND-415-20-64 4cx120mm
CABLE LENGTH Recovered length in scheme the remainig SD
39m Done
40m Done
131.5 m Done
205m Done
97 m 169 m can not be done Done
Dec-21
Scheme No. Cable Size quantity(Mtr)
PTS-LV-39772-20 4cx185 Al 71
PTS-LV-41625-20 4cx25 Cu 67
PTS-LV-38537-20 4cx240 Al 9
PTS-LV-41017-21 4cx25 Cu 98
PTS-LV-41254-21 4cx16 Cu 89
ND-415-20-323 4cx185 Al 62
PTS-LV-41773-20 4cx240 Al 15
PTS-LV-41475-20 4cx70 Cu 81
PTS-LV-39955-21 4cx16 Cu 91