Road Sections ROAD LEVEL ROAD LEVEL

Clear key Plan With Coordinates

4m

HDPE PIPE
160mm DIA

SECTION-BB

2m 3m 12.7m 3m 2m

ROAD

SAND SAND
2m 2m
E=378636.402
4m

EXIT PIT ENTRY PIT


N=2688434.996
HDPE PIPE
160mm DIA

LONGITUDINAL SECTION - AA
HDD
3m 12.7m 3m
B

2m 2m

2m 2m

ROAD
EXIT PIT ENTRY PIT
B

SAND SAND

Clear Photo Trench Cross Section including AAM Specification Client: AADC

Consultant: N/A

Contractor: Prime Engineering Projects

Sub-Contractor: Al-Hally

Project Name: A-16108

Scheme No: PTS-LV-40243-21


2m

IT
2m EXIT P Work Area: Hilli

Work Duration: 30 days


Ex. GL.
Work Type: NDRC Duct

150
3m

Compacted to 95% Site Engineer: Eng. Waris

150
CBR 20% Material
Contact number: 00971 52 799 6821

150
Approval of the Municipality:

250
BACK FILLING
12.7m

250
with Excavation Material
Compacted 95% MDD

2000

250
150
150
1 way-HDPE Pipe
160mm DIA

150
150
DUNE SAND
Compacted to 90% MDD

150
3m

2000

TRENCH FOR ENTRY & EXIT PIT

PIT
ENTRY
2m
2m