You are on page 1of 6

‫ﺗﺼﺎﺭﻳﺢ ﺍﻟﺘﺤﻮﻳﻼﺕ ﺍﻟﻤﺮﻭﺭﻳﺔ‬

‫ﺗﻌﺪﺍﺩ ﻣﺮﻭﺭﻱ ‪ /‬ﺃﻋﻤﺎﻝ ﻣﺴﺎﺣﻴﺔ‬ ‫ﻧﻮﻉ ﺍﻟﻌﻤﻞ ‪:‬‬

‫ﻃﺒﻴﻌﺔ ﺍﻷﻋﻤﺎﻝ ﺍﻹﻧﺸﺎﺋﻴﺔ ‪ ) :‬ﺭﻓﻊ ﻧﻘﺎﻁ ﻣﺴﺘﻮﻳﺎﺕ ﺍﻷﺭﺽ ) ﺃﻋﻤﺎﻝ ﻣﺴﺎﺣﻴﺔ‬

‫‪19/07/2022‬‬ ‫ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﺍﻟﺘﺼﺮﻳﺢ ‪:‬‬ ‫‪2022-124658‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺼﺮﻳﺢ ‪:‬‬

‫ﺃﻭﻗﺎﺕ ﺍﻟﻌﻤﻞ‬
‫‪25/07/2022‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ ﺍﻟﻤﻌﺘﻤﺪ ﻻﻧﺘﻬﺎء ‪:‬‬ ‫‪20/07/2022‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ ﺍﻟﻤﻌﺘﻤﺪ ﻟﺒﺪء ‪:‬‬
‫ﺍﻻﻋﻤﺎﻝ‬ ‫ﺍﻻﻋﻤﺎﻝ‬
‫ﻻ ﻣﺎﻧﻊ ﻣﻦ ﺍﻟﻨﺎﺣﻴﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ ﺣﺠﺰ ﺣﺎﺭﺓ ﺍﻭ ﺣﺎﺭﺗﻴﻦ ﺑﺸﻜﻞ ﻣﺆﻗﺖ ﻻﻋﻤﺎﻝ ﺍﺧﺬ ﺍﻟﻨﻘﺎﻁ ﺍﻟﻤﺴﺎﺣﻴﺔ ﻣﻊ ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻟﺘﺎﻟﻲ‪:‬‬
‫ﺣﺠﺰ ﺍﻟﺤﺎﺭﺓ ﻟﻴﻼ ﻓﻘﻂ ﻣﻦ ﺍﻟﺴﺎﻋﺔ ‪ 2:00‬ﺻﺒﺎﺣﺎ ﺣﺘﻰ ﺍﻟﺴﺎﻋﺔ ‪ 5:00‬ﺻﺒﺎﺣﺎ ‪.‬‬
‫ﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﻏﺮﻓﺔ ﺍﻟﻌﻤﻠﻴﺎﺕ ﻣﺮﻛﺰ ﺍﻟﻨﻘﻞ ﺍﻟﻤﺘﻜﺎﻣﻞ‬
‫ﺁﻟﻴﺔ ﺍﻟﻌﻤﻞ ‪:‬‬
‫ﺍﻻﺗﺰﺍﻡ ﺑﺘﻄﺒﻴﻖ ﺩﻟﻴﻞ ﺍﻣﺎﺭﺓ ﺍﺑﻮﻇﺒﻲ ﻻﺩﺍﺭﺓ ﻣﻮﺍﻗﻊ ﺍﻟﻌﻤﻞ ﺑﺨﺼﻮﺹ ﺍﻟﻤﺴﺎﻓﺎﺕ ﻭﺍﻟﻘﻴﺎﺳﺎﺕ‪.‬‬
‫ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻟﺒﻨﺪ ﺍﻟﺮﺍﺑﻊ ﻓﻲ ﺷﺮﻭﻁ ﺍﻟﺘﺼﺮﻳﺢ ﺍﻟﺨﺎﺹ ﺑﺎﻟﺤﻮﺍﺩﺙ ﺍﻟﻤﺮﻭﺭﻳﺔ ﻓﻲ ﻣﻮﺍﻗﻊ ﺍﻟﻌﻤﻞ‬
‫ﻋﺪﻡ ﺍﻟﺒﺪء ﺑﺎﻻﻋﻤﺎﻝ ﺍﻻ ﺣﻴﻦ ﺍﺳﺘﻼﻡ ﺍﻟﻨﺴﺨﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻣﻦ ﺍﻟﺘﺼﺮﻳﺢ‬

‫ﻣﻮﻗﻊ ﺍﻟﻌﻤﻞ‬
‫ﺭﻗﻢ ﺍﻟﺸﺎﺭﻉ ‪408 :‬‬ ‫ﺍﺳﻢ ﺍﻟﺸﺎﺭﻉ ‪ :‬ﺷﺎﺭﻉ ﺯﺍﻳﺪ ﺑﻦ ﺳﻠﻄﺎﻥ‬ ‫ﺭﻗﻢ ﺍﻟﻘﻄﻌﺔ ‪164 :‬‬ ‫ﺭﻗﻢ ﺍﻟﺤﻮﺽ ‪:‬‬ ‫ﺍﻟﻤﻨﻄﻘﺔ ‪:‬‬
‫ﻭﺳﻂ ﺍﻟﻤﺪﻳﻨﺔ‬ ‫ﻣﻮﻗﻊ ﺍﻟﻌﻤﻞ ‪:‬‬
‫‪55.759307753 / 24.2208922736‬‬ ‫ﺍﻹﺣﺪﺍﺛﻴﺎﺕ ‪:‬‬
‫‪NA :‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﺨﻄﻂ ﺍﻟﻤﻮﻗﻊ )ﻣﺮﻓﻖ ﻧﺴﺨﺔ(‬

‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﺠﻬﺔ ﺍﻟﻤﻨﻔﺬﺓ‬


‫‪NA‬‬ ‫ﺍﺳﻢ ﺍﻹﺳﺘﺸﺎﺭﻱ ‪:‬‬ ‫ﺷﺮﻛﺔ ﺍﻟﻌﻴﻦ ﻟﻠﺘﻮﺯﻳﻊ‬ ‫ﺍﻟﻤﺎﻟﻚ ‪:‬‬
‫‪030000000‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻜﺘﺐ ‪:‬‬ ‫‪0370933304‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻜﺘﺐ ‪:‬‬
‫‪NA‬‬ ‫ﺍﺳﻢ ﺍﻟﺸﺨﺺ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬ ‫ﺍﻟﻤﻬﻨﺪﺱ ﺧﺎﻟﺪ‬ ‫ﺍﺳﻢ ﺍﻟﺸﺨﺺ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬
‫‪00000‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻮﺑﺎﻳﻞ ‪:‬‬ ‫‪0503328425‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻮﺑﺎﻳﻞ ‪:‬‬
‫‪NA‬‬ ‫ﺍﺳﻢ ﺍﻟﻤﻘﺎﻭﻝ ﻣﻦ ﺍﻟﺒﺎﻃﻦ ‪:‬‬ ‫ﺍﻷﻭﻟﻰ ﻟﻠﻤﺸﺎﺭﻳﻊ ﺍﻟﻬﻨﺪﺳﻴﺔ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻘﺎﻭﻝ ﺍﻟﺮﺋﻴﺴﻲ ‪:‬‬
‫‪NA‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻜﺘﺐ ‪:‬‬ ‫‪037211889‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻜﺘﺐ ‪:‬‬
‫‪NA‬‬ ‫ﺍﺳﻢ ﺍﻟﺸﺨﺺ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬ ‫ﻋﻠﻲ‬ ‫ﺍﺳﻢ ﺍﻟﺸﺨﺺ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬
‫‪NA‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻮﺑﺎﻳﻞ ‪:‬‬ ‫‪0556699245‬‬ ‫ﺭﻗﻢ ﺍﻟﻤﻮﺑﺎﻳﻞ ‪:‬‬

‫ﺍﻟﺨﺘﻢ‬ ‫ﺍﻹﻣﻀﺎء‬

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﺤﺮﻛﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ‬


‫ﺗﺼﺎﺭﻳﺢ ﺍﻟﺘﺤﻮﻳﻼﺕ ﺍﻟﻤﺮﻭﺭﻳﺔ‬
‫ﺗﻌﺪﺍﺩ ﻣﺮﻭﺭﻱ ‪ /‬ﺃﻋﻤﺎﻝ ﻣﺴﺎﺣﻴﺔ‬ ‫ﻧﻮﻉ ﺍﻟﻌﻤﻞ ‪:‬‬
‫ﻃﺒﻴﻌﺔ ﺍﻷﻋﻤﺎﻝ ﺍﻹﻧﺸﺎﺋﻴﺔ ‪ ) :‬ﺭﻓﻊ ﻧﻘﺎﻁ ﻣﺴﺘﻮﻳﺎﺕ ﺍﻷﺭﺽ ) ﺃﻋﻤﺎﻝ ﻣﺴﺎﺣﻴﺔ‬
‫ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﺍﻟﺘﺼﺮﻳﺢ ‪19/07/2022 :‬‬ ‫‪2022-124658‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺼﺮﻳﺢ ‪:‬‬

‫ﺍﻟﺸﺮﻭﻁ ﻭﺍﻷﺣﻜﺎﻡ‬
‫ﺍﻹﻟﺘﺰﺍﻡ ﺑﻜﺎﻓﺔ ﺍﻟﻤﻼﺣﻈﺎﺕ ﺍﻟﺘﻲ ﻳﺘﻢ ﺫﻛﺮﻫﺎ ﻓﻲ ﺍﻟﻤﺨﻄﻄﺎﺕ‬ ‫‪1.‬‬
‫ﺃﺧﺬ ﺍﻟﻤﻮﺍﻓﻘﺎﺕ ﻭﺍﻟﺘﺼﺎﺭﻳﺢ ﺍﻟﻼﺯﻣﺔ ﻣﻦ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﻌﻨﻴﺔ ﻗﺒﻞ ﺍﻟﻤﺒﺎﺷﺮﺓ‬ ‫‪2.‬‬
‫ﺇﺷﻌﺎﺭ ﺍﻟﻤﺮﻛﺰ ﺍﻟﻤﺮﻭﺭﻱ ﺑﻤﺮﻛﺰ ﺍﻟﻨﻘﻞ ﺍﻟﻤﺘﻜﺎﻣﻞ ﻗﺒﻞ ﻭﺑﻌﺪ ﺗﻨﻔﻴﺬ ﺍﻷﻋﻤﺎﻝ ﻋﻠﻰ ﺭﻗﻢ ﺍﻟﺘﻮﺍﺻﻞ ‪ 026566534‬ﺃﻭ ﻋﺒﺮ ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ‪Detours@itc.gov.ae‬‬ ‫‪3.‬‬
‫ﻓﻲ ﺣﺎﻝ ﺣﺪﻭﺙ ﺣﺎﺩﺙ ﻣﺮﻭﺭﻱ ﻓﻲ ﻣﻮﻗﻊ ﺍﻟﻌﻤﻞ ﻳﺘﻮﺟﺐ ﻋﻠﻰ ﺍﻟﻤﻘﺎﻭﻝ ﺗﺄﻣﻴﻦ ﺍﻟﺴﻼﻣﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ ﻓﻲ ﻣﻮﻗﻊ ﺍﻟﻌﻤﻞ ﺩﻭﻥ ﺍﺣﺪﺍﺙ ﺃﻳﺔ ﺗﻐﻴﻴﺮﺍﺕ ﻋﻠﻰ ﻋﻨﺎﺻﺮ ﺍﻟﺤﺎﺩﺙ ﻭﺍﻟﺘﻌﺎﻭﻥ ﻣﻊ ﺩﻭﺭﻳﺎﺕ ﺍﻟﺸﺮﻃﺔ ﻭﺍﻟﻄﻮﺍﺭﺉ ﻓﻮﺭ ﻭﺻﻮﻟﻬﺎ ﺇﻟﻰ ﺍﻟﻤﻮﻗﻊ‬ ‫‪4.‬‬
‫ﻳﺘﻮﺟﺐ ﻋﻠﻰ ﺍﻟﻤﻘﺎﻭﻝ ﻓﻲ ﻣﺮﺣﻠﺔ ﺍﻟﺘﺤﻀﻴﺮ ﻟﺘﻨﻔﻴﺬ ﺍﻟﺘﺤﻮﻳﻼﺕ ﺍﻟﻤﺮﻭﺭﻳﺔ ﻋﺪﻡ ﻭﺿﻊ ﺍﻟﺘﺠﻬﻴﺰﺍﺕ ﻭﺍﻟﻤﻮﺍﺩ ﺍﻟﻤﻘﺮﺭ ﺍﺳﺘﺨﺪﺍﻣﻬﺎ ﻓﻲ ﻫﺬﻩ ﺍﻷﻋﻤﺎﻝ ﺿﻤﻦ ﺣﺮﻡ ﺍﻟﻄﺮﻳﻖ ﺑﺼﻮﺭﺓ ﺗﺆﺛﺮ ﻋﻠﻰ ﺳﻼﻣﺔ ﻣﺴﺘﺨﺪﻣﻲ ﺍﻟﻄﺮﻕ‬ ‫‪5.‬‬
‫ﻳﺘﻮﺟﺐ ﻋﻠﻰ ﺍﻟﻤﻘﺎﻭﻝ ﻋﺪﻡ ﺗﻨﻔﻴﺬ ﺃﻋﻤﺎﻝ ﻏﻴﺮ ﺗﻠﻚ ﺍﻷﻋﻤﺎﻝ ﺍﻟﻤﺼﺮﺡ ﺑﻬﺎ ﻓﻲ ﺍﻟﺘﺼﺮﻳﺢ ﻭﺍﻟﻮﺍﺭﺩﺓ ﻓﻲ ﺁﻟﻴﺔ ﺍﻟﻌﻤﻞ‬ ‫‪6.‬‬
‫ﺇﺭﺗﺪﺍء ﺟﻤﻴﻊ ﺍﻟﻌﺎﻣﻠﻴﻦ ﻟﻠﻘﻤﻴﺺ ﺍﻟﻌﺎﻛﺲ‪.‬‬ ‫‪.7‬‬
‫ﻋﺪﻡ ﻭﻗﻮﻑ ﺍﻟﻤﺮﻛﺒﺎﺕ ﺃﻭ ﺍﻻﺷﺨﺎﺹ ﻋﻠﻰ ﺍﻟﻄﺮﻕ ﺃﻭ ﺃﻛﺘﺎﻑ ﺍﻟﻄﺮﻕ‪.‬‬ ‫‪.8‬‬
‫ﻳﺘﻢ ﻭﻗﻮﻑ ﺍﻻﺷﺨﺎﺹ ﻋﻠﻰ ﺍﻻﺭﺻﻔﺔ ﺃﻭ ﺍﻟﺠﺰﺭ ﺍﻟﻮﺳﻄﻴﺔ ﺧﺎﺭﺝ ﺣﺪﻭﺩ ﺍﻟﻄﺮﻳﻖ ﻟﻀﻤﺎﻥ ﺳﻼﻣﺘﻬﻢ ﺍﻟﺸﺨﺼﻴﺔ‪.‬‬ ‫‪.9‬‬
‫ﻋﺪﻡ ﻋﺒﻮﺭ ﺍﻻﺷﺨﺎﺹ ﻟﻠﻄﺮﻕ ﺇﻻ ﻣﻦ ﺍﻻﻣﺎﻛﻦ ﺍﻟﻤﺨﺼﺼﺔ ﻟﻌﺒﻮﺭ ﺍﻟﻤﺸﺎﺓ‪.‬‬ ‫‪.10‬‬
‫ﻭﺿﻊ ﻟﻮﺣﺎﺕ ﺗﻌﺮﻳﻔﻴﺔ ﻓﻲ ﻣﻨﺎﻃﻖ ﺍﻟﻌﻤﻞ ﺗﺘﻀﻤﻦ ﺍﺳﻢ ﺍﻟﻤﺸﺮﻭﻉ‪ ،‬ﺍﻟﻤﻘﺎﻭﻝ‪ ،‬ﺍﻻﺳﺘﺸﺎﺭﻱ‪ ،‬ﻣﺪﻳﺮ ﺍﻟﻤﺸﺮﻭﻉ ﻣﺴﺆﻭﻝ ﺍﻟﺴﻼﻣﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ ﻣﻊ ﺍﺭﻗﺎﻡ ﺍﻟﻬﻮﺍﺗﻒ ﺍﻟﺨﺎﺻﺔ ﺑﻬﻢ )ﻟﻠﻤﺸﺎﺭﻳﻊ(‪.‬‬ ‫‪.11‬‬
‫ﻭﺟﻮﺩ ﻧﺴﺨﺔ ﻣﻦ ﺗﺼﺮﻳﺢ ﻣﺮﻛﺰ ﺍﻟﻨﻘﻞ ﺍﻟﻤﺘﻜﺎﻣﻞ ﺑﺮﻓﻘﺔ ﻣﺴﺆﻭﻝ ﺍﻟﺴﻼﻣﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ ﺑﺎﻟﻤﻮﻗﻊ ﻹﺑﺮﺍﺯﻩ ﻋﻨﺪ ﺍﻟﻄﻠﺐ‬ ‫‪.12‬‬
‫ﻓﻲ ﺣﺎﻝ ﺍﺳﺘﺨﺪﺍﻡ ﺍﻻﺟﻬﺰﺓ ﻓﻲ ﺟﻤﻊ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﺮﻭﺭﻳﺔ ﻳﺠﺐ ﺍﻥ ﻳﺘﻢ ﺗﺜﺒﻴﺘﻬﺎ ﺧﺎﺭﺝ ﺍﻟﻄﺮﻳﻖ ﻭﺑﺪﻭﻥ ﺇﻋﺎﻗﺔ ﺣﺮﻛﺔ ﺍﻟﻤﺸﺎﺓ‪.‬‬ ‫‪.13‬‬

‫ﺍﻟﺨﺘﻢ‬ ‫ﺍﻹﻣﻀﺎء‬

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﺤﺮﻛﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ‬


NOTE:-
1. All Dimensions are in Meters unless Otherwise Indicated.

LEGENDS
CLOSING AREA WITH SAFETY CONES
WARNING TAPE & BEACON LIGHTS

60
25m 120m

60
KEY PLAN
120m 25m | |
| |
100m

60
60
SHOP DRAWING
CLIENT:

ELECTRICAL CONTRACTOR:

PRIME ENGINEERING PROJECTS


United Arab Emirates - AL AIN P.O.BOX:23059
PRIME
ENGINEERING TEL: +971-3-7211886 FAX: +971-3-7211889
EMAIL: info@prime-engineering-projects.com

PROJECT NAME:
A-16108
Installation of Cables 33,11KV&
0.415KV,Equipment's and Distribution
Transformers(11/0.415KV)
in Al Ain Regions
DRAWING TITLE:

DETOUR FOR NDRC LEVEL MARKING IN


CLOCK TOWER SIGNAL
Location: CLOCK TOWER Site: -

Drawn By: P.K Date: 30/03/2022

Checked By: SAUDI MARANTAN Scale: -


2022-124658 Scheme.No. ND/11/18/78 Rev. 00 Sheet 01 of 04
NOTE:-
1. All Dimensions are in Meters unless Otherwise Indicated.

LEGENDS
CLOSING AREA WITH SAFETY CONES
WARNING TAPE & BEACON LIGHTS

60
60
120m
KEY PLAN
25m
100m
25m
120m

60
60
SHOP DRAWING
CLIENT:

ELECTRICAL CONTRACTOR:

PRIME ENGINEERING PROJECTS


United Arab Emirates - AL AIN P.O.BOX:23059
PRIME
ENGINEERING TEL: +971-3-7211886 FAX: +971-3-7211889
EMAIL: info@prime-engineering-projects.com

PROJECT NAME:
A-16108
Installation of Cables 33,11KV&
0.415KV,Equipment's and Distribution
Transformers(11/0.415KV)
in Al Ain Regions
DRAWING TITLE:

DETOUR FOR NDRC LEVEL MARKING IN


CLOCK TOWER SIGNAL
Location: CLOCK TOWER Site: -

Drawn By: P.K Date: 30/03/2022

Checked By: SAUDI MARANTAN Scale: -


2022-124658 Scheme.No. ND/11/18/78 Rev. 00 Sheet 02 of 04
NOTE:-
1. All Dimensions are in Meters unless Otherwise Indicated.

LEGENDS
CLOSING AREA WITH SAFETY CONES
WARNING TAPE & BEACON LIGHTS

60
120m
25m
120m 100m
25m

KEY PLAN
60

60
60
SHOP DRAWING
CLIENT:

ELECTRICAL CONTRACTOR:

PRIME ENGINEERING PROJECTS


United Arab Emirates - AL AIN P.O.BOX:23059
PRIME
ENGINEERING TEL: +971-3-7211886 FAX: +971-3-7211889
EMAIL: info@prime-engineering-projects.com

PROJECT NAME:
A-16108
Installation of Cables 33,11KV&
0.415KV,Equipment's and Distribution
Transformers(11/0.415KV)
in Al Ain Regions
DRAWING TITLE:

DETOUR FOR NDRC LEVEL MARKING IN


CLOCK TOWER SIGNAL
Location: CLOCK TOWER Site: -

Drawn By: P.K Date: 30/03/2022

Checked By: SAUDI MARANTAN Scale: -


2022-124658 Scheme.No. ND/11/18/78 Rev. 00 Sheet 03 of 04
NOTE:-
1. All Dimensions are in Meters unless Otherwise Indicated.

LEGENDS
CLOSING AREA WITH SAFETY CONES
WARNING TAPE & BEACON LIGHTS

120m

60
25m

100m

25m

120m
60

KEY PLAN
60
60

60
60
SHOP DRAWING
CLIENT:

ELECTRICAL CONTRACTOR:

PRIME ENGINEERING PROJECTS


United Arab Emirates - AL AIN P.O.BOX:23059
PRIME
ENGINEERING TEL: +971-3-7211886 FAX: +971-3-7211889
EMAIL: info@prime-engineering-projects.com

PROJECT NAME:
A-16108
Installation of Cables 33,11KV&
0.415KV,Equipment's and Distribution
Transformers(11/0.415KV)
in Al Ain Regions
DRAWING TITLE:

DETOUR FOR NDRC LEVEL MARKING IN


CLOCK TOWER SIGNAL
Location: CLOCK TOWER Site: -

Drawn By: P.K Date: 30/03/2022

Checked By: SAUDI MARANTAN Scale: -


2022-124658 Scheme.No. ND/11/18/78 Rev. 00 Sheet 04 of 04