IOP Conference Series: Materials Science and Engineering

PAPER • OPEN ACCESS You may also like


- Laser Modified Fuel Cell Diffusion Media:
Traffic Management and Engineering Analysis of Engineering Enhanced Performance via
Localized Water Redistribution
the Manahan Flyover Area by using Traffic Micro- M. P. Manahan, J. T. Clement, A. K. Srouji
et al.

Simulation VISSIM - Erratum: Laser Modified Fuel Cell


Diffusion Media: Engineering Enhanced
Performance via Localized Water
To cite this article: Budi Yulianto 2020 IOP Conf. Ser.: Mater. Sci. Eng. 852 012005 Redistribution [J. Electrochem. Soc., 161,
F1061 (2014)]
M. P. Manahan, J. T. Clement, A. K. Srouji
et al.

- Performance Enhancement of Vanadium


View the article online for updates and enhancements. Redox Flow Batteries
Qinghua Liu, Zhijiang Tang, Ahmet Turhan
et al.

This content was downloaded from IP address 180.252.116.143 on 15/03/2022 at 11:27


2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

Traffic Management and Engineering Analysis of the


Manahan Flyover Area by using Traffic Micro-
Simulation VISSIM
Budi Yulianto*
Civil Engineering Department, Engineering Faculty, Sebelas Maret University Jl Ir Sutami
36A Surakarta (57126) Indonesia

* budi.yulianto@ft.uns.ac.id

Abstract. The location of the Manahan railway level crossing is a meeting point for movement
between trains and vehicles which often causes traffic congestion and traffic accidents in the area. In
connection with the construction of the double track railway, the intensity of traffic congestion in the
Manahan railway level crossing area is increasing. In order to overcome traffic congestion in the area,
the Surakarta City Government built Manahan Flyover infrastructure. However, due to traffic
management and engineering in the existing conditions is not optimal resulting in a relatively bad
traffic congestion in Manahan Flyover area. The aim of this study is to conduct traffic management
and engineering analysis to minimize traffic congestion in Manahan Flyover area. The traffic micro-
simulation VISSIM model is used to evaluate the performance of road networks at peak traffic
conditions with different simulation model scenarios. The existing model is built based on a field
survey data and then calibrated it to approximate conditions on the field. Then based on the existing
model, modelling of several traffic management and engineering scenarios are carried out to obtain
the optimal performance of the road network in the Manahan Flyover area. The analysis shows that
the simulation model Scenario 3 produces the best performance of road network in terms of vehicle
delay, queue length, travel time and speed

1. Introduction
Uncontrolled growth in vehicle use has an effect on increasing traffic density in cities. This will
eventually have the potential to increase the intensity of traffic congestion and accidents. Railway level
crossing is a meeting point between railway and highway, where when a train crosses a railway level
crossing it will cause vehicle delays and queues. Traffic congestion often occur in the Manahan railway
level crossing area because of the high intensity of trains that cross the railway and traffic volume that
pass through Dr. Moewardi road. The Central Government's program in improving railway-based mass
public transportation services in Java was realized in the construction of the double track railway. This
development has the potential to increase the intensity of traffic congestion in the Manahan railway level
crossing area. In order to realize smooth, orderly and safe traffic, the Manahan railway level crossing
was changed to a non-level crossing by facilitating the movement of traffic with flyover infrastructure.
Imperfect and immature traffic engineering and management studies conducted by Planning
and Traffic Impact Analysis Consultants on Manahan Flyover development have caused a negative
impact on traffic congestion on roads and intersections in the Manahan Flyover area. The elimination of
the Kota Barat Intersection results in Dr. Moewardi road becoming the main road for traffic movement
from the south (Dr. Moewardi road) to the north (MT Haryono and Adi Sucipto roads) and vice versa.
Thus the capacity of Dr. Moewardi road is unable to accommodate traffic volume that crossed the road.

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution
of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.
Published under licence by IOP Publishing Ltd 1
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

Traffic movements from Dr. Moewardi road to MT Haryono road is not accommodated by Manahan
Flyover, so the traffic movements are diverted towards the KFC Intersection. In order to minimize traffic
accidents, vehicle delays and queues, therefore, the KFC Intersection is installed traffic signal control.
Ineffective signal timing of the controller has a major impact on vehicle delays and queues at the
intersection. In addition, limited road accessibility in the Manahan Flyover area results in traffic
violations at the end of the Manahan Flyover ramp which conducts U-Turn movements. This has an
effect on traffic congestion and potentially on traffic accidents. Figure 1 shows the traffic conditions
after the Manahan Flyover operated. In connection with the traffic problems in the Manahan Flyover
area, a further analysis of traffic engineering and management is needed to minimize the impact of
Manahan Flyover development on the performance of road network and its improvement efforts.

Figure 1. Traffic congestion on Dr. Moewardi road South of Manahan Flyover

The aim of this study is to conduct traffic engineering and management analysis to minimize
traffic congestion in Manahan Flyover area. The traffic micro-simulation VISSIM model is used to
evaluate the performance of road network at peak traffic conditions with different simulation model
scenarios.

2. Study Methodology
2.1. Site Description and Data Collection
This study is conducted on area covering all roads and intersections around the Manahan Flyover
development area. The construction’s location of the Manahan Flyover and study area can be seen in
Figure 2. Data primer collected at study area included traffic volume, composition and turning
proportions, desired speed vehicle, geometry and signal timing. Secondary data related to Design
Engineering Details of the Manahan Flyover is obtained from the Ministry of Public Works, the National
Research and Development PUSJATAN [1], see in Figure 3.

2.2. Stages of Study


The study work begins with the preparatory stage, which includes the process of formulating the
problem, setting goals and preparing study methods. The next stage is the primary and secondary data
collection stage. This data is used as an input data for the road network simulation model. The next step
is the analysis stage, which includes modeling the existing road network, modelling of several traffic
management and engineering scenarios and evaluating the effectiveness of different simulation model
scenarios using the traffic micro-simulation VISSIM. The analysis results of different simulation
models are discussed in relation to the performance of the road network under different effort of traffic
management and engineering scenarios. The final stage is the conclusion of the analysis results and
subsequent research recommendations.

2
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

MT Haryono Road

B
Manahan Flyover
Adi Sucipto Road Intersection
C
KS Tubun Road

KFC Intersection

Manahan Flyover

Kenanga Road

Dr. Moewardi Road


Mawar Road
Masjid Kota Barat Intersection
A D
Brigjend. Slamet Riyadi Road Kalitan Road
Figure 2. The location of roads and intersections under studies

Figure 3. Design Engineering Details of the Manahan Flyover and Manahan Flyover
Infrastructure

3. Analysis, Results and Discussions


3.1. Simulation Model
Road network modelling is done by using traffic micro-simulation VISSIM Version 10.6. It is a
microscopic, time step (1-second) and behavior based simulation model, which is developed to model
urban traffic and public transportation operations [2]. It can be used as a tool to evaluate various
alternatives according to planning of traffic management and engineering. Road network modelling
stage consists of three stages namely network coding and calibration of the existing model, develop the
different simulation model scenarios and comparison of the measure of performance for all models.

3.1.1. Development of Road Network Existing Mode.


The road network model is built based on the existing conditions. Traffic conditions in the study area
are different from traffic conditions in developed countries where vehicle follows lane based operation,
in which vehicles run on the specified lane with the majority of car vehicles. Whereas in the study area,
the traffic is untidy where vehicles do not follow the lane based operation and the proportion of

3
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

motorcycles is very high (mixed traffic). In order to create a simulation model that can replicate field
conditions, therefore the traffic parameters of the simulation model need to be calibrated based on the
field data. The calibration process is done by setting the car following, lane change, desired speed
distribution, reduced speed area and priority rules parameters [3], [4], [5], [6].
Manahan Flyover Existing model is developed in accordance with the detail engineering designs
and road network existing conditions with planned traffic management and engineering efforts based on
the consultant's study. Figure 4 shows the screenshot of the Manahan Flyover Existing model.

Figure 4. Manahan Flyover Existing model

3.1.2. Development of Simulation Model Scenarios.


Traffic management and engineering analysis to minimize congestion on Manahan Flyover area by using
micro-simulation model is carried out in several scenarios in a gradual process. During each stages of
scenario, discussions are held with relevant agencies such as Department of Transportation Surakarta,
Department of Public Works to find the optimal solution. The stages of scenario are as follows:
A. Scenario 1 is the Existing model plus the following efforts:
□ Increase Dr. Moewardi road capacity by eliminating on-street parking.
□ Reducing the number of conflict points between vehicles at the Masjid Kota Barat Intersection
by changing traffic direction on the Mawar road to become one direction to east. Masjid Kota
Barat intersection is separated by barrier so that traffic flows from the west and south cannot
enter the Mawar road directly. Traffic flow from the north cannot turn right onto the Kenanga
road.
B. Scenario 2 is the Scenario 1 model plus the following efforts:
□ Increase vehicle throughput at the KFC Intersection by changing the signal timing of traffic
signal control including phase sequence, green split and cycle time. Prohibit vehicles from Adi
Sucipto road (west) turn right onto the KS Tubun road (south).
C. Scenario 3 is the Scenario 2 model plus the following efforts:
□ Reducing the amount of traffic flowing through Kalitan road by implementing a one- way contra
flow system on the Brigjend. Slamet Riyadi road.

4
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

3.2. Simulation Results and Discussions


The performances of road network under existing model and different simulation model scenarios are
compared to each other in terms of performance measure i.e. an average vehicle delay, queue length,
travel time and speed. A simulation run is made for approximately one- hour periods to produce the
output performance measures. In these comparisons, five simulation runs are undertaken for each model
with different random seed values.
Comparison of the average vehicle delay at KFC and Manahan Flyover Intersections for all
models can be seen in Figure 5. The simulation results show that the average vehicle delay at
intersections of the simulation model Scenario 3 lower than the other models. In general, the simulation
model Scenario 3 produces the lowest vehicle queue length at the main approach intersections, see
Figure 6. Similarly, for the average travel time of various segments where scenario 3 produces the lowest
travel time compared to other models, see Figure 7.

Average Delay Comparison


500
428.5
Average Delay (second)

400
304.2
300 258.2 Existing
210.8 207.2
Scenario 1
200
124.3 Scenario 2
100 62.1 54.0 Scenario 3

0
KFC Intersection Manahan Flyover Intersection
Intersection Name

Figure 5. Comparison of average delay at KFC and Manahan Flyover Intersections

Average Queue Length Comparison


400
352 344
Average Queue Length (metre)

350

300
258 263
246 244
250 230
197 178
200 Existing
Scenario 1
150 123

79
Scenario 2
100
51 Scenario 3
33 38
50 19 8
0
KFC Intersection - KFC Intersection - Kalitan Intersection - Manahan Flyover
Westbound Eastbound Westbound Intersection -
Southbound
Location

Figure 6. Comparison of average queue length at KFC, Kalitan and Flyover Manahan Intersections

Average Travel Time Comparison


20
Average Travel Time (minute)

15.0
15 14.3

9.9 9.4 9.6 Existing


10 8.8 9.3 8.7
8.4
7.6 Scenario 1
7.0 7.2 6.5
5.3 4.8 4.9 4.8 Scenario 2
5 4.1 4.8 4.3
3.7 4.2 4.6
3.0 Scenario 3

0
A-B B-C B-A C-A C-B D-B
Travel Time Segment (Zona to Zona)

5
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

Figure 7. Comparison of average travel time

Figure 8 shows comparison of the road network average vehicle delay and speed for all models.
The simulation results show that the average vehicle delay of the simulation model Scenario 3 lower
than the other models. Vehicle delays on the road network are low due to high vehicle speeds.
Simulation model Scenario 3 produces the highest vehicle speed compared to other scenarios.
Network Performance- Average Delay Comparison Network Performance- Average Speed Comparison
350 30
300.6
300 25 24.0

250 228.9
20
182.6 16.6
200
14.3
Average Delay (second)

Average Speed (km/hour)


15
150 11.7

93.6 10
100

50 5

0 0
Existing Scenario 1 Scenario 2 Scenario 3 Existing Scenario 1 Scenario 2 Scenario 3

Simulation Model Simulation Model

Figure 8. Comparison of network average delay and average speed

Simulation results show that the acute traffic congestions occur in the Existing model. This is due
to the inadequate capacity of Dr. Moewardi road to accommodate traffic volume from the north and
many conflicting movements occur at the Masjid Kota Barat Intersection, see Figures 9a and 9b. Stunted
traffic flow on Jalan Dr Moewardi resulted in a vehicles queue at Manahan Flyover Intersection, see
Figure 9c.

(a) r.DMoewardi Road (b) (c)

Majid Kota Barat


Intersection

Manahan Flyover Intersection

Figure 9. Road network traffic on Existing model

In simulation model Scenario 1, the road capacity of the Dr. Moewardi road is enlarged by
eliminating on-street parking and reducing the number of conflict points at the Masjid Kota Barat
Intersection. This is to minimize traffic congestion at Dr. Moewardi road. Figures 10a and 10b show the
traffic congestion at Dr. Moewardi road reduced. Meanwhile the long vehicle queue occurs at the KFC
Intersection, see Figure 10c. This is because of ineffective signal timing of the traffic signal control.

Dr. Moewardi Road Majid Kota Barat Intersection KFC Intersection

(a) (b) (c)

6
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

Figure 10. Road network traffic on simulation model Scenario 1

In simulation model scenario 2, the signal timing of the traffic signal control is changed in order
to increase the vehicle throughput at the KFC intersection. Figure 11a shows the traffic congestion at
KFC Intersection reduced. Setting long green time for the west phase caused large amount of traffic
going to east. This has an impact on the traffic movement from MT Haryono road that passes through
Manahan Flyover. Assuming that the Adi Sucipto road (direction from the west) is a major road, then the
traffic from MT Haryono road (direction from the north) must follow the 'right way rule' rule. This
caused traffic congestion on MT Haryono road, because the headway between vehicles from Adi Sucipto
road is relatively small so that the vehicle throughput from MT Haryono is small, see Figure 11b. Long
vehicle queue occurs at the east approach of Kalitan Intersection. This is due to many vehicles that want
to go to the Brigjend. Slamet Riyadi road (to the west) by passing the Kalitan road, see Figure 11c.

Manahan Flyover Intersection Kalitan Intersection

KFC Intersection

(a) (b) (c)

Figure 11. Road network traffic on simulation model Scenario 2

In simulation model Scenario 3, optimizing signal timing of the controller is carried out to
minimize traffic congestion at intersections, see Figure 12a and 12b. Other than that, the one- way contra
flow system on the Brigjend. Slamet Riyadi road is re-functioned to reduce the vehicle passing the
Kalitan road, see Figure 12c. Simulation model Scenario 3 produces the best performance of road
network in terms of vehicle delay and queue length at intersections as well as vehicle travel time and
speed of the road network.

Manahan Flyover Intersection Kalitan Intersection

KFC Intersection

(a) (b) (c)


Figure 12. Road network traffic on simulation model Scenario 3

4. Conclusion
During the initial post-operation Manahan Flyover, traffic congestion occurred due to lack of planning
and recommendations for traffic management and engineering by consultants. The use of simulation
tools is very effective in evaluating the performance of road networks with various scenarios. It is a
faster and less expensive experimental tool to carry out repetitive test track experiments under controlled
conditions and to produce sufficient data that would be difficult to get in real life [7]. The simulation

7
2nd TICATE 2019 IOP Publishing
IOP Conf. Series: Materials Science and Engineering 852 (2020) 012005 doi:10.1088/1757-899X/852/1/012005

results show that simulation model Scenario 3 produces the best performance of road network in terms
of vehicle delay and queue length at intersections as well as vehicle travel time and speed of the road
network.

5. Acknowledgement
The authors would like to acknowledge the LPPM of Sebelas Maret University for their support in
funding this study.

References
[1] CV. Pancasula Mahardika Utama, “Dokumen Hasil Analisis Dampak Lalu Lintas Pembangunan
Flyover/Overpass Simpang Manahan Solo Kota Surakarta (2017).
[2] Fallendorf, M., 1997 Institute of Transportation Engineers. Proceeding of 67th Annual Meeting
(Boston-USA).
[3] Asamer, J., Zuylen, H.J.V., Heilmann, B., 2011 Proceeding of 2nd International Conference on
Models and Technologies for Intelligent Systems (Leuven-Belgium).
[4] Park, B., Schneeberger, J., 2003 Transportation Research Record: Journal of the
Transportation Research Board 1856, 185-192.
[5] Siddharth, S.M.P., Ramadurai, G., 2013 Procedia – Social and Behavioral Sciences. vol. 104.
pp. 380-389.
[6] Yulianto, B. 2007 Thesis (The School of Civil Engineering and Geosciences: University of
Newcastle upon Tyne, United Kingdom).
[7] Hoque, Md.S. 1994 Thesis (The Department of Civil and Environtment Engineering: University of