Professional Documents
Culture Documents
Piping material
Quotation for Gas pipe line (Approx 650 Metrs) from Heat Treatment
available from old
Metering unit to foundry core shop (Miscullenious Material & Labour 500,000 Rs
LPG Yard will be
charges)
used
Civil activity required for roof exhaust pipe and miscullenious core oven
150,000
foundation work
Miscullenious Fabrication work for relayout and existing Core trolly wheels
300,000
modification (FML scope)
Total-Landed 3,480,000 Rs
B Annual Saving (Rs.)
1 Infra head & Hot air ovens electrical consumption
current load / day 1,800 Kw
Rate of elecricity per day @ 9 Rs 16,200
Rate of elecricity per month @ 9 Rs 421,200
Rate of elecricity per year @ 9 Rs 5,054,400
c Gas consumption
PNG consumption 11.76 SCM
Core Data
c) Initial moisture content in the core & 1) Required for Core gum setting after assembly
Application 2) Required for Drying of water base refractory wash (2% Maxm)
Width : 790 mm
a) Clear Inside size of the Oven Heigth: 410 mm
Length: Based on cycle requirment (Maxm 6000 MM)