Professional Documents
Culture Documents
: 26071-000-SR1-A000-30001
1 of 66
Doc. No. : 26071-000-SR1-A000-30001
INSTRUCTION TO BIDDER
FOR
BUILDING WORK
2 of 66
Doc. No. : 26071-000-SR1-A000-30001
PACKAGE #3.1
3 of 66
Doc. No. : 26071-000-SR1-A000-30001
4 of 66
Doc. No. : 26071-000-SR1-A000-30001
5 of 66
Doc. No. : 26071-000-SR1-A000-30001
6 of 66
Doc. No. : 26071-000-SR1-A000-30001
7 of 66
Doc. No. : 26071-000-SR1-A000-30001
8 of 66
Doc. No. : 26071-000-SR1-A000-30001
9 of 66
Doc. No. : 26071-000-SR1-A000-30001
10 of 66
Doc. No. : 26071-000-SR1-A000-30001
11 of 66
Doc. No. : 26071-000-SR1-A000-30001
REVISION LOG
REVISED
REV. NO. REV. DATE REVISION DESCRIPTION
PAGE
A 31.JulyMay.20 N/A Issue for Inquiry
192021
3 of 66
Doc. No. : 26071-000-SR1-A000-30001
4 of 66
Doc. No. : 26071-000-SR1-A000-30001
5 of 66
Doc. No. : 26071-000-SR1-A000-30001
6 of 66
Doc. No. : 26071-000-SR1-A000-30001
TABLE OF CONTENTS
7 of 66
Doc. No. : 26071-000-SR1-A000-30001
1. GENERAL.........................................................................................................................6
Introduction......................................................................................................................6
Definition..........................................................................................................................7
2. ACKNOWLEDGEMENTS.................................................................................................8
3. SUBMITTAL......................................................................................................................8
8 of 66
Doc. No. : 26071-000-SR1-A000-30001
Language..........................................................................................................................8
BIDDER’s Proposal..........................................................................................................9
4. EVALUATION....................................................................................................................9
9 of 66
Doc. No. : 26071-000-SR1-A000-30001
5. VALIDATION...................................................................................................................10
8. CLARIFICATION.............................................................................................................10
9. SITE VISIT.......................................................................................................................11
10 of 66
Doc. No. : 26071-000-SR1-A000-30001
Price11
Currencies......................................................................................................................11
Local Content.................................................................................................................11
11 of 66
Doc. No. : 26071-000-SR1-A000-30001
Prices in accordance with the Price Form as attached Annex 8. “Bill of Quantities
and Unit Rates” and Annex 11. “SUBCONTRACTOR’s Proposal”...................12
Organization Chart........................................................................................................12
12 of 66
Doc. No. : 26071-000-SR1-A000-30001
Construction Schedule.................................................................................................12
Information on Safety....................................................................................................13
The BIDDER shall submit document related to Quality Plan, but not limited to:
Project Quality Plan (PQP), Quality Management System, Organization chart,
roles and responsibilities.....................................................................................13
Work permits..................................................................................................................13
14 of 66
Doc. No. : 26071-000-SR1-A000-30001
17. DISQUALIFICATION.......................................................................................................14
15 of 66
Doc. No. : 26071-000-SR1-A000-30001
1. GENERAL
Introduction
We, Joint Operation (hereinafter “JO”) of SK Engineering & Construction CO., LTD.
(hereinafter “SKEC”), Hyundai Engineering CO., LTD. (hereinafter “HEC”), PT REKAYASA
INDUSTRI (hereinafter “Rekind”) and PT PP (Persero) Tbk. (hereinafter “PP”) awarded the
engineering, procurement, construction (“EPC”) works necessary for the implementation
and completion of the WORKS for Refinery Development Master Plan (RDMP) PROJECT
16 of 66
Doc. No. : 26071-000-SR1-A000-30001
We are hereby requesting Subcontractor to bid for the Construction work (hereinafter called
“WORK”) of the Project.
The WORK is broadly made up of but not limited to the following:
1. Earth Work including Excavation, backfill, disposal either manual or by machine.
2. Foundation and Superstructure
- All RC structure, mason work, waterproofing for structure.
17 of 66
Doc. No. : 26071-000-SR1-A000-30001
18 of 66
Doc. No. : 26071-000-SR1-A000-30001
19 of 66
Doc. No. : 26071-000-SR1-A000-30001
4. Metal cladding
- Metal cladding, roof and wall with gutter, downspout and drain
- Installing door, windows, louver, ETC on cladding side
- Roof Ventilator and Reinforcing frame
20 of 66
Doc. No. : 26071-000-SR1-A000-30001
21 of 66
Doc. No. : 26071-000-SR1-A000-30001
Definition
The words and the expressions noted below shall have the following meaning unless the
context dictates otherwise:
"Site" means the plot of land in the Area of herein Project where the COMPANY
intends to build a new plant and other adjoining or associated areas as
applicable.
23 of 66
Doc. No. : 26071-000-SR1-A000-30001
The BIDDER is requested to submit to CONTRACTOR a best proposal based on the ITB of
Construction Work. The detail scope of work under is attached in ANNEX 3.
The BIDDER's proposal must strictly comply with all ITB in all respects. Any deviation shall
be clearly and specifically stated for the following clauses, otherwise deviations from the
conditions stated in the ITB may disqualify any proposals submitted.
Instruction to BIDDER
24 of 66
Doc. No. : 26071-000-SR1-A000-30001
Annexes of Subcontract
The BIDDER is requested to confirm that all applicable documents listed above are in its
possession and, if any of them is proven to be missing, to inform CONTRACTOR promptly.
25 of 66
Doc. No. : 26071-000-SR1-A000-30001
2. ACKNOWLEDGEMENTS
Within three (3) working days from the BIDDER's receipt of the ITB, the BIDDER is
requested to send an e-mail acknowledging the receipt to the addressee given in Invitation
Letter. The ITB number and the subject must appear on all correspondences and
documents without fail.
Should the BIDDER not wish to submit a proposal, it is requested to send an e-mail
expressing such unwillingness to the addressee given in Invitation Letter within three (3)
26 of 66
Doc. No. : 26071-000-SR1-A000-30001
working days after the receipt of the ITB and promptly return all documents received from
CONTRACTOR.
3. SUBMITTAL
BIDDER shall submit one (1) original of the full bid package by e-mail to the addressee
given in Invitation Letter.
27 of 66
Doc. No. : 26071-000-SR1-A000-30001
Language
The proposal and all related documents including reports, studies, correspondence, and
drawings shall be in English. In the event that the local authorities require any documents to
be furnished by the Subcontractor to be written in languages other than English, the
Subcontractor shall be responsible, at his own expense, for preparing such documents as
prescribed, together with English translations thereof.
28 of 66
Doc. No. : 26071-000-SR1-A000-30001
BIDDER’s Proposal
The BIDDER shall submit the Proposal with SUBCONTRACTOR Stamp (Official Seal) as
PDF & Excel File Format.
29 of 66
Doc. No. : 26071-000-SR1-A000-30001
30 of 66
Doc. No. : 26071-000-SR1-A000-30001
31 of 66
Doc. No. : 26071-000-SR1-A000-30001
4. EVALUATION
The evaluation of the BIDDER's proposal will not be limited to price but will also take into
account technical capability, working experience in the related field, time schedule of the
Works, etc. It is therefore essential that all the information requested in Para. 13 "Contents
of Proposal" shall be contained in the BIDDER's proposal.
32 of 66
Doc. No. : 26071-000-SR1-A000-30001
Following the completion of the evaluation, CONTRACTOR will advise the BIDDER of
success or failure of the proposal without explanation. CONTRACTOR reserve the right to
reject any or all of the bid proposals without providing any reasons and CONTRACTOR
shall not be obliged to disclose the details about the evaluation to any BIDDER.
5. VALIDATION
The bid shall remain valid for the period specified in the Commercial Condition (180 Days
from Bid Closing date). In exceptional circumstances, prior to the expiration of the Bid
33 of 66
Doc. No. : 26071-000-SR1-A000-30001
validity period, the CONTRACTOR may request BIDDER to extend the period of validity of
their Bids. The request and the responses shall be made in writing.
34 of 66
Doc. No. : 26071-000-SR1-A000-30001
Any deviations and/or alterations from the ITB (Commercial and Technical) must be clearly
and specifically stated in one section. CONTRACTOR has no obligation to search for any
deviations in parts other than the section indicated in the BIDDER's proposal index. In the
event that the BIDDER is awarded the Contract, it will be on the basis of the requirements
of the ITB and only of the deviations and alterations included and accepted by
CONTRACTOR.
35 of 66
Doc. No. : 26071-000-SR1-A000-30001
36 of 66
Doc. No. : 26071-000-SR1-A000-30001
8. CLARIFICATION
For clarification or answer to any query in respect of any part of the ITB, the BIDDER may
contact CONTRACTOR by e-mail. Any clarifications or replies by CONTRACTOR will be
advised to all BIDDERs and shall not be valid or binding unless made in writing with both
stamps.
9. SITE VISIT
To be informed.
37 of 66
Doc. No. : 26071-000-SR1-A000-30001
Price
The BIDDER shall propose the price as specified in Annex 8. “Bill of Quantities and Unit
Rates” and Annex 11. “SUBCONTRACTOR’s Proposal”. An amount to absorb fluctuations in
38 of 66
Doc. No. : 26071-000-SR1-A000-30001
the costs of labor, construction equipment, materials, and consumables shall be determined
by the BIDDER and be included in the proposed price(s) and rates without reference to the
application of any price fluctuation clause or formula.
Currencies
39 of 66
Doc. No. : 26071-000-SR1-A000-30001
Local Content
The BIDDER shall indicate a percentage of Indonesian content for each category applicable
for the performance of the Work. The BIDDER shall ensure that the percentage of the Work
that constitutes Local Content at Provisional Acceptance is no less than the percentage to
be declared by the Bidder when concluding the Subcontract.
40 of 66
Doc. No. : 26071-000-SR1-A000-30001
Of all the other contents of the BIDDER's submitted proposal, only those parts that will be
agreed in writing shall be considered as forming a part of any subsequent agreements.
41 of 66
Doc. No. : 26071-000-SR1-A000-30001
Prices in accordance with the Price Form as attached Annex 8. “Bill of Quantities
and Unit Rates” and Annex 11. “SUBCONTRACTOR’s Proposal”.
Organization Chart
The BIDDER shall submit the organization chart for the Construction Work activities. The
BIDDER shall also include:
42 of 66
Doc. No. : 26071-000-SR1-A000-30001
Curriculum Vitae (CV) for key personnel (i.e. name, qualification, experience, background,
age, length of service in his company, etc.). All key personnel shall be the BIDDER's own
employees and any appointment to key positions of temporarily hired personnel shall not be
allowed.
The total number of BIDDER's permanent staff and contract staff stating job category.
43 of 66
Doc. No. : 26071-000-SR1-A000-30001
Construction Schedule
The BIDDER shall submit a detailed schedule in the form of a bar chart for the entire works
indicating clearly all the detailed work items.
44 of 66
Doc. No. : 26071-000-SR1-A000-30001
45 of 66
Doc. No. : 26071-000-SR1-A000-30001
The BIDDER shall submit a layout plan including required surface area, descriptions and
capacities of all temporary facilities to be constructed by the BIDDER. In addition, BIDDER
is requested to present his plan for labor accommodation especially for the necessity of
camp and its operation.
46 of 66
Doc. No. : 26071-000-SR1-A000-30001
47 of 66
Doc. No. : 26071-000-SR1-A000-30001
Information on Safety
The BIDDER shall submit safety records by filling out the form of safety records covering
the past three (3) years. In addition, the BIDDER shall submit a safety policy and also a
detailed write-up on HSE and security control Plan to be used for the Works.
48 of 66
Doc. No. : 26071-000-SR1-A000-30001
The BIDDER shall submit document related to Quality Plan, but not limited to: Project
Quality Plan (PQP), Quality Management System, Organization chart, roles and
responsibilities.
Work permits
The BIDDER shall check and prepare all work permits required to perform its Scope of
Work in Project area
49 of 66
Doc. No. : 26071-000-SR1-A000-30001
The BIDDER shall submit its Indonesian Content Plan with existing TKDN score for
Contractor’s evaluation and approval. The following information shall be included in Bidder’s
Indonesian Content Plan submitted to Contractor, but not limited to;
50 of 66
Doc. No. : 26071-000-SR1-A000-30001
2) List of Personnel
(detailed list of non-Indonesian and Indonesian Bidder personnel)
5) List of Suppliers
(detailed list of all services, materials, Equipment and other work planned to be
51 of 66
Doc. No. : 26071-000-SR1-A000-30001
executed including provision of work scope summaries and the value and percentage of
the Subcontract Price to such Indonesian registered entities)
6) Bidder’s plan to maximize local capacity building for the achievement of Local Content
objectives.
BIDDER shall complete and submit the attached Secrecy Declaration (Annex 18) duly
signed to CONTRACTOR.
53 of 66
Doc. No. : 26071-000-SR1-A000-30001
17. DISQUALIFICATION
54 of 66
Doc. No. : 26071-000-SR1-A000-30001
The BIDDER should note that the proposal may be disqualified from Bid Evaluation in
CONTRACTOR's judgment in the event that there are any deviations from the requirements
of these ITB including, but not be limited to, the following:
Where a quotation by e-mail has been submitted but the formal proposal confirming the
absence of or the extent and nature of any deviations has not been submitted by the Bid
Closing Date
Where an original or basic proposal has been submitted after the Bid Closing Date
Where an alternative proposal has been submitted after the Bid Closing Date
55 of 66
Doc. No. : 26071-000-SR1-A000-30001
Where the BIDDER submits a proposal containing significant deviations from any of the
conditions stipulated in the Form of Contract.