Professional Documents
Culture Documents
100
100
1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 80 90 1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 80 90
1000 1000
900 900
800 800
700 700
600 600
500 500
TIME IN SECONDS
50 50
ST Pickup is a multiple of the nominal
40 (RPXPU) LT PI 40
30
Curve represents a tolerance of -9% 30
and 11% around the actual value of
current, + operating time.
20 FE time current curves include all 20
required trip unit tolerance and CB
operational variance
Bottom/left of curve band is the
“commit” time. The top/right is
10 the “maximum” clear time. 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 2
Max.
1 1
.9 .9
.8 .8
Int.
.7 .7
DES-092B
DES-092B
.6 .6
.5 .5
11
.4 .4
Min. 10
.3 .3
9
.2 8 .2
7
6
5
.1 .1
.09 .09
.08 4 .08
.07 .07
3
.06 10X STPU Maximum .06
.05 Slope Calculation 2 .05
.04 1 .04
.03 .03
.02 .02
Transition to Instantaneous, Transition to Instantaneous,
Override or Application Override or Application
Determines End of Curve Determines End of Curve
.01 .01
1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 8090 1 2 3 4 5 6 7 8 9 10 20 30 40 50 60 70 8090
100
100
12.14