Tidewater Marine East Region (ER)

Date Effective: 01 April 2018 Document No:


Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

Vessel:       Inspected By:      


Location:       Date:      

A. ADMINISTRATION and RECORDS


1. DO E/R LOG BOOKS REFLECT A 2. ARE DAILY MAIN ENG READINGS
DAILY RECORD OF ACTIVITIES RECORDED IN E/R LOG
3. OIL RECORD BOOK AS PER 4. ACCIDENT AND INCIDENT REPORTS
M.A.R.P.O.L... (lat/long REC IF UP TO DATE( E/R ROOM RELATED
O.W.S. IN USE) ONLY
5. Requisition Status 6. Chief Engineer Outstanding Orders
7. Spare Parts Inventory 8. PMS Files
9. Critical Spares 10. Black out Procedures

Remarks :
     
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

B. PRE WORK CHECK LISTS AND SAFE WORK RECORDS


1. CONFINED SPACES 2. HOTWORK PERMITS
3. WORKING AT HEIGHTS 4. PRE BUNKERING CHECKLIST
5. LOCK OUT / TAGS SYSTEM 6. E/R BILGE DISCHARGE O’BOARD
LOCKED (KEY WITH CH/ENG
7. TOOLBOX AND J.S.A.MEETINGS 8. ARE MATERIAL SAFETY DATA
RECORDED ON REGULAR BASIS SHEETS AT HAND& Posted out
Chemical Store
9. Pre-Arrival/Pre Departure CL 10. DP E.R Checklist

Remarks :
     
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

C. ENGINE ROOM RECORDS


1. REFRIGERANT RECORDS UP TO 2. DAILY OIL CONSUMPTION CHART
DATE
3. DAILY FUEL CONSUMPTION 4. OIL SAMPLES; RESULTS FILED
RECORDS AND IN ORDER
5. FAULTS AND FAILURES RECORDED 6. ENGINE PERFORMANCE REPORTS
IN TIMELY MANNER FILLED IN (COMPLETELY)

7. TECHNICAL RECORDS AND 8. TANK LEVELS AND SOUNDINGS


MANUALS TO BE AT HAND RECORDED DAILY

9. MAINTANANCE REPORT FILES UP 10. UNPLANNED BREAKDOWNS


TO DATE FLAGGED AND NOTIFIED

11. DEFFERED MAINTENANCE 12. SPARE PART CONTROL,


DOCUMENTED (AFTER REFERAL TO OUTSTANDING ORDERS
ENG SUPERINTENDANT) FOLLOWED UP ON

13. FILTER REGISTRY UP TO DATE 14. OIL REGISTERY UP TO DATE

15. PARTS FINDER IN PLACE 16. ARE SPARES IN SERVICABLE


CONDITION, RUST FREE?

17. C/E’S ORDER BOOK 18. Critical Spare Parts

Remarks :
     
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

D. SAFETY and CRITICAL


1. BILGE PUMP RECORDS UP TO DATE 2. FIRE PUMP RECORDS UP TO DATE
ALSO VIEW AND LOG ALSO VIEW AND LOG
AMPS AMPS
SUCTION PRESSURE SUCTION PRESSURE
DELIVERY PRESSURE DELIVERY PRESSURE
VISUAL INSPECTION VISUAL INSPECTION
3. EM FIRE PUMP RECORDS UP TO 4. CONFIRM ESCAPE ROUTES FREE
DATE ALSO VIEW AND LOG OF CLUTTER + OBSTRUCTIONS
AMPS APPROPRIATE SIGNAGE IN PLACE
SUCTION PRESSURE DOORS HATCHES FREE AND
DELIVERY PRESSURE UNLOCKED
VISUAL INSPECTION
5. ESC ROUTE ILLUMINATION 6. P.B.A. IN PLACE IN DATE
7. FIRE EXTINGUISHERS IN DATE AND 8. WATERTIGHT DOORS TESTED INC
FULLY CHARGED REMOTE CLOSING

9. TEST AND RECORD LOCATION OF 10. TEST AND RECORD LOC OF ANY 2
ANY 2 BILGE ALARMS FIRE ALARM SENSORS

11. EMERGENCY STEERING TESTS UP 12. TELEPHONE SYSTEM


TO DATE? FUNCTIONING

13. E/R ROOM HAND HELD RADIOS 14. TALKBACK AND ENGINE
CHARGED AND WORKING TELEGRAPHS WORKING

15. ANY FIRE HAZARDS PRESENT, 16. SAVEALLS CLEAN AND DRAINING
RUBBISH, RAGS,OIL SPILLS, CORRECTLY

17. F.R.C.OBSERVED RUNNING (CAN BE 18. ALL MACHINERY GAURDS IN


DONE IN DAVIT) PLACE AND SECURE

19. INSPECT DIVE COMPRESSOR 20. B.A FILLING, AIR CLEAN?


21. P.M.E. PTO AND FIRE MONITOR 22. S.M.E. PTO AND FIRE MONITOR

Remarks :
     
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

E. ENGINE ROOM EQUIPMENT


1. E/R APPEARANCE 2. STEERING GEAR

3. TANK TOP 4. STERN GLAND AND SHAFTING

5. PURIFIERS 6. EARTHING TO SHAFTS


7. FO/LO/FW/SW PUMPS 8. EMERGENCY AIR COMPRESSOR

9. AIR COMPRESSORS 10. COOLERS/ HEAT EXCHANGERS

11. AIR RECIEVERS 12. HYDROPHORE SYSTEMS

13. EMERGENCY SWITCHBOARD 14. ALTERNATORS

15. EMERGENCY GENERATOR 16. MAIN SWITCHBOARD

17. OILY WATER SEPERATOR 18. FRIDGE A/C COMPRESSORS

19. INCINERATORS 20. F/W GENERATOR R/O PLANT

21. EXHAUST STACK, FUNNEL 22. SEWAGE PLANT

23. CO2 SYSTEM 24. BATTERIES

25. REMOTE SWITCHES/ STATIONS 26. Q.C. VALVES

27. BLOWER FLAPS 28. HOSES / HYDRANTSs

29. WORKSHOP 30. FWD THRUSTER COMPARTMENT

31. AFT THRUSTER COMPARTMENT 32. TOOLS AND EQUIPMENT

33. AUXILIARY GENERATORS 34. TUNNEL THRUSTERS & CONTROLS


35. MAIN PROPULSION 36. TRANSMISSION/GEAR BOXES.
37. ER VENTILATION FANS 38. ER ALARM/MONITORING SYSTEM
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

E. ENGINE ROOM EQUIPMENT


Remarks :
     

F. MAIN ENGINES
1. P.M.E. APPEARANCE OVERALL 2. S.M.E. APPEARANCE OVERALL

3. P.M.E. PIPEWORK AND HOSES 4. S.M.E. PIPEWORK OVERALL

5. P.M.E. FUEL SYSTEM 6. S.M.E. FUEL SYSTEM


7. P.M.E ANY LEAKS EVIDENT? 8. S.M.E. ANY LEAKS EVIDENT
9. P.M.E. REDUCTION BOX 10. S.M.E. REDUCTION BOX
11. P.M.E GAUGES FUNCTIONAL 12. S.M.E GAUGES FUNCTIONAL
13. Test M/E Shutdown 14. Generators Shutdown
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

F. MAIN ENGINES
Remarks :
     

G. DECK MACHINERY OPERATOR FEEDBACK


1. DECK CRANE 2. WINDLASS

3. TOWING WINCH 4. PORT TUGGER WINCH

5. CAPSTAN 6. STB TUGGER WINCH


7.       8.      
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

G. DECK MACHINERY OPERATOR FEEDBACK


Remarks :

H. Dynamic Positioning System


1. BRIDGE CONSOLE 2. DP COMPUTER& Joystick

3. DGPS 4. FAN BEAM SYSTEM


Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

H. Dynamic Positioning System


5. UPS 6. Wind Sensor

7. HIPAP 8.      

Remarks :
     

I. Emergency Equipment
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

I. Emergency Equipment
1. GENERAL ALARM 2. FIRE DETECTOR PANEL (ALARM
FREE)
3. GAS ALARM 4. EMERGENCY LIGHTING

5. FRIDGE WARNING BUZZER 6. CO2 RELEASE ALARM


7. BILGE LEVEL ALARMS 8. REMOTE CLOSING FLAPS
9. VENT FAN FLAPS 10. FIXED FOAM SYSTEM
11. VENT FANS EMERGENCY STOP 12. PORTABLE FOAM SYSTEM
13. FIXED FOAM SYSTEM 14. FIRE MAIN AND HYDRANTS
15. EMERGENCY BATTERIES 16. SALVAGE PUMP
17. SPRINKLER SYSTEM 18. EMERGENCY STOPS THRUSTERS
19. EMERGENCY STOPS ME 20.      
21.           22.      

Remarks :
     
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

Portable Electrical Equipment Maintenance Program


J.
Inspection and Testing of Portable Electrical Equipment Involves
1 VISUAL INSPECTION – CORDS, 5. CHECK FOR INTEGRITY OF
PLUGS, GUARDS PROTECTIVE EARTH AND
INSULATION RESISTANCE
2 VISUAL INSPECTION – 6. CORDS SECURELY ANCHORED TO
ACCESSORIES EXTENTION LEADS EQUIPMENT AND PLUG
AND CONNECTORS
3 DISCOLOURATION 7. DAMAGE TO EQUIPMENT OR
CORDS
4 EXPOSURE TO HEAT, CHEMICALS OR 8. OPERATING CONTROLS ARE IN GOOD
MOISTURE ORDER, SECURE AND ALLIGNED

All portable electrical appliances such as grinders, welders, drills, saws are subject to testing and
tagging.

Testing and Tagging is to be conducted annually by the Chief Engineer or Electrical Officer.

Testing and tagging of portable electrical appliances is to be conducted with the use of an insulated
resistance meter and ohmmeter.

Remarks :

     
Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

HELPFUL NOTES FOR E/R AUDIT

A. Admin and Records

Start with daily records and log books and look for a reflection of daily activities.
A lone entry such as “continue with TM or daily maintenance” would not be considered
adequate.

B. Pre work lists

What we want to see here is a culture of using the J.S.A. and pre-work sheets much as an
airline pilot uses his pre-flight check lists; it is an aid, pretty much like a crib sheet before
taking an exam, we are trying not to overlook anything. Only in this case we only pass the
exam when the task is completed without any incidents. We want ENCOURAGEMENT NOT
PUNISHMENT!

C. Engine Room Records.

There should be no omissions here, these items should be kept simply but current and up to
date.

D. Safety and Critical

These items as seen should be in good order and ready to go. Most of these have the capacity
to be life savers.

E. Engine Room Equipment

Here we look for a general ambience and feeling. It is usually more beneficial to highlight
good points found and to give praise than it is to look for failings.

F. Main Engines

Is the most valuable and critical plant on the ship and normally this is reflected in the
engineers attitude to its upkeep and maintenance. It is probably best to be very circumspect
here and take around 30 mins per engine.

G. Deck Machinery operator feedback

This is about how the deck crew see the way in which their equipment is serviceable and any
queries or problems are dealt with in a safe and timely manner.

H. D.P. system

Again a feedback exercise from Capt. and mates.


Tidewater Marine East Region (ER)
Date Effective: 01 April 2018 Document No:
Title: SHIP TECHNICAL INSPECTION CHECKLIST Rev: 00
Approved By: Regional Manager ER-TC-41

I. Emergency Equipment

Speaks for itself really, all this stuff is like the seat belt and airbags in your car:- taken for
granted until you really need it!

J. Portable Electrical Equipment Maintenance Program


A vigilant and common sense approach is required here. Visual checks should be conducted
before every use. The maintenance check should be conducted every 6 months. Testing and
tagging is required annually.

OVERVIEW
What we are looking to find or achieve by carrying out audits like these is to
encourage a culture where crew take ownership of problems and shortfalls and
start working together to achieve an improved and safer work place.

GUIDELINES
SECTION NOTES MIN NO
A to D ALL FIELDS
E AS TIME ALLOWS 8
F AS TIME ALLOWS 4
G ALL
H IF APPLICABLE
I ALL
J 6 MONTHLY AND ANUALLY 5

SIGNATURE OF SUPERINTENDENT:

...................................................................

DATE:.....................................................
External / Internal Corrective Action Plan

Report No:       Report       Vessel /       IMO Number:       Flag:       Page 14 of
Date: Location: 14

Name of Auditor / Surveyor:       Issuer of SMC:       Issuer of DOC:      

NC / Category Description of Non Investigation and Immediate/ Remedial Due Date Action
Obs No of Conformity Analysis for Possible Action / Corrective Closed
Deficiency Root Cause(s) Preventive Actions Verified
Signed Date
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   

Category of Deficiency: 1) Technical, 2) Documentation, 3) Operational, and 4) Other.