BAB 3

ANALISIS PENULANGAN BALOK

3.1 Penulangan Balok (SL1A)


Letak Tumpuan
1. Dimensi Balok 300 : 400 mm : Pb = 40 mm
: d = 360 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1598.63 mm2
b. Bottom Area = 1241.15 mm3
c. Maximum Shear Rebar = 1.939 mm2/mm
d. Torsi (Axis) (At/a) = 0.249 mm2/mm
e. Torsi Memanjang = 529.337 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 25 Area = 981.748 mm2
2 D 25 Area = 981.748 mm2
Total = 1963.5 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 29 Area = 1321.04 mm2


0 D 0 Area = 0 mm2
Total = 1321.04 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 16 - 100 ; AV Area = 201.062


(Gunakan di area tumpuan) Av/s Area = 2.01062
Chechk for as use = 1.03694 ; 1
= (OK)

d. Tulangan Torsi = 4 D 16 Area = 804.248


0 D 0 Area = 0
Total = 804.248
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 427.343
Tidak boleh kurang dari As min = 540
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01818 (Tulangan) Check = (OK) to (OK)
0.01223 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 109.776 ; a/d = 0.30493 ; (OK)
- Tulangan Lapangan = 73.8571 ; a/d = 0.20516 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 300 : 400 mm : Pb = 40 mm
: d = 360 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 581.419 mm2
b. Bottom Area = 1311.38 mm3
c. Maximum Shear Rebar = 0.318 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 19 Area = 1134.11 mm2
0 D 0 Area = 0 mm2
Total = 1134.11 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 23 Area = 1661.9 mm2


0 D 0 Area = 0 mm2
Total = 1661.9 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 12 - 100 ; AV Area = 113.097


(Gunakan di area tumpuan) Av/s Area = 1.13097
Chechk for as use = 3.55652 ; 1
= (OK)

d. Tulangan Torsi = 4 D 16 Area = 804.248


0 D 0 Area = 0
Total = 804.248
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 427.343
Tidak boleh kurang dari As min = 540
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0105 (Tulangan) Check = (OK) to (OK)
0.01539 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 63.4065 ; a/d = 0.17613 ; (OK)
- Tulangan Lapangan = 92.9142 ; a/d = 0.25809 ; (OK)

5 SKETSA PENULANGAN

300 Tulangan Atas = 2 D 25


2 D 25
Tulangan Bawah = 2 D 29
0 D 0
Tulangan Torsi = 4 D 16
400 0 D 0
Tulangan Beugle = P 16 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

300
Tulangan Atas = 4 D 19
0 D 0
Tulangan Bawah = 4 D 23
0 D 0
Tulangan Torsi = 4 D 16
400 0 D 0
Tulangan Beugle = P 12 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 19050 mm^2 z = 29.8342 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 63.5 mm

3.2 Penulangan Balok (SL1B)


Letak Tumpuan
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2206.48 mm2
b. Bottom Area = 1492.5 mm3
c. Maximum Shear Rebar = 2.288 mm2/mm
d. Torsi (Axis) (At/a) = 0.196 mm2/mm
e. Torsi Memanjang = 767.365 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 27 Area = 2290.22 mm2
0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 6 D 19 Area = 1701.17 mm2


0 D 0 Area = 0 mm2
Total = 1701.17 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 19 - 100 ; AV Area = 283.529


(Gunakan di area tumpuan) Av/s Area = 2.83529
Chechk for as use = 1.2392 ; 1
= (OK)
d. Tulangan Torsi = 4 D 16 Area = 804.248
0 D 0 Area = 0
Total = 804.248
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01616 (Tulangan) Check = (OK) to (OK)
0.012 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 109.751 ; a/d = 0.27099 ; (OK)
- Tulangan Lapangan = 81.5226 ; a/d = 0.20129 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 710.715 mm2
b. Bottom Area = 2155.93 mm3
c. Maximum Shear Rebar = 0.752 mm2/mm
d. Torsi (Axis) (At/a) = 723.7 mm2/mm
e. Torsi Memanjang = 723.7 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 16 Area = 804.248 mm2
0 D 0 Area = 0 mm2
Total = 804.248 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 6 D 22 Area = 2280.8 mm2


0 D 0 Area = 0 mm2
Total = 2280.8 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 12 - 100 ; AV Area = 113.097


(Gunakan di area tumpuan) Av/s Area = 1.13097
Chechk for as use = 1.50395 ; 1
= (OK)

d. Tulangan Torsi = 4 D 16 Area = 804.248


0 D 0 Area = 0
Total = 804.248
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00567 (Tulangan) Check = (OK) to (OK)
0.01609 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 38.5407 ; a/d = 0.09516 ; (OK)
- Tulangan Lapangan = 109.299 ; a/d = 0.26987 ; (OK)

5 SKETSA PENULANGAN

350 Tulangan Atas = 4 D 27


0 D 0
Tulangan Bawah = 6 D 19
0 D 0
Tulangan Torsi = 4 D 16
450 0 D 0
Tulangan Beugle = P 19 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280
350
Tulangan Atas = 4 D 16
0 D 0
Tulangan Bawah = 6 D 22
0 D 0
Tulangan Torsi = 4 D 16
450 0 D 0
Tulangan Beugle = P 12 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 7350 mm^2 z = 21.6621 MN/m
n = 6 syarat z < 30 Mn/m (OK)
ds = 63 mm

3.3 Penulangan Balok (SL1C)


Letak Tumpuan
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1812.8 mm2
b. Bottom Area = 906.168 mm3
c. Maximum Shear Rebar = 0.655 mm2/mm
d. Torsi (Axis) (At/a) = 0.685 mm2/mm
e. Torsi Memanjang = 989.82 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 8 D 19 Area = 2268.23 mm2
0 D 0 Area = 0 mm2
Total = 2268.23 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 6 D 16 Area = 1206.37 mm2


0 D 0 Area = 0 mm2
Total = 1206.37 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 19 - 100 ; AV Area = 283.529


(Gunakan di area tumpuan) Av/s Area = 2.83529
Chechk for as use = 4.32868 ; 1
= (OK)

d. Tulangan Torsi = 4 D 18 Area = 1017.88


0 D 0 Area = 0
Total = 1017.88
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0126 (Tulangan) Check = (OK) to (OK)
0.0067 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 95.1097 ; a/d = 0.21135 ; (OK)
- Tulangan Lapangan = 50.5846 ; a/d = 0.11241 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 565.303 mm2
b. Bottom Area = 906.168 mm3
c. Maximum Shear Rebar = 0.069 mm2/mm
d. Torsi (Axis) (At/a) = 0.212 mm2/mm
e. Torsi Memanjang = 959.231 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 6 D 16 Area = 1206.37 mm2
0 D 0 Area = 0 mm2
Total = 1206.37 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 6 D 14 Area = 923.628 mm2
0 D 0 Area = 0 mm2
Total = 923.628 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 12 - 100 ; AV Area = 113.097


(Gunakan di area tumpuan) Av/s Area = 1.13097
Chechk for as use = 16.3909 ; 1
= (OK)

d. Tulangan Torsi = 6 D 16 Area = 1206.37


0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0067 (Tulangan) Check = (OK) to (OK)
0.00513 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 50.5846 ; a/d = 0.11241 ; (OK)
- Tulangan Lapangan = 38.7289 ; a/d = 0.08606 ; (OK)

5 SKETSA PENULANGAN

400 Tulangan Atas = 8 D 19


0 D 0
Tulangan Bawah = 6 D 16
0 D 0
Tulangan Torsi = 4 D 18
500 0 D 0
Tulangan Beugle = P 19 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

400
Tulangan Atas = 6 D 16
0 D 0
Tulangan Bawah = 6 D 14
0 D 0
Tulangan Torsi = 6 D 16
500 0 D 0
Tulangan Beugle = P 12 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 7866.67 mm^2 z = 21.679 MN/m
n = 6 syarat z < 30 Mn/m (OK)
ds = 59 mm

3.4 Penulangan Balok (SL ANAK)


Letak Tumpuan
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm
2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:
a. Top Area = 353.479 mm2
b. Bottom Area = 176.241 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0.685 mm2/mm
e. Torsi Memanjang = 989.82 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 29 Area = 1981.56 mm2
0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 3 D 29 Area = 1981.56 mm2
0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use (OK)
c. Beugel Maksimum = P 19 - 100 ; AV Area = 283.529
(Gunakan di area tumpuan) Av/s Area = 2.83529
Chechk for as use = 2835.29 ; 1
= (OK)
d. Tulangan Torsi = 4 D 18 Area = 1017.88
0 D 0 Area = 0
Total = 1017.88
Chechk for as use (OK)
4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS
fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)
b. Cek Rasio Tulangan ;
p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00524 (Tulangan) Check = (OK) to (OK)
0.00524 (Tumpuan) Check = (OK) to (OK)
c. Cek kendali Tarik Penampang
a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 55.3928 ; a/d = 0.08793 ; (OK)
- Tulangan Lapangan = 55.3928 ; a/d = 0.08793 ; (OK)
LETAK LAPANGAN
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm
2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:
a. Top Area = 87.997 mm2
b. Bottom Area = 1840.58 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2
3. Estimasi Kebutuhan Tulangan
a. Tulangan Atas = 5 D 23 Area = 2077.38 mm2
0 D 0 Area = 0 mm2
Total = 2077.38 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 8 D 18 Area = 2035.75 mm2
0 D 0 Area = 0 mm2
Total = 2035.75 mm2
Chechk for as use = (OK)
c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743
(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)
d. Tulangan Torsi = 6 D 16 Area = 1206.37
0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)
4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS
fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)
b. Cek Rasio Tulangan ;
p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0055 (Tulangan) Check = (OK) to (OK)
0.00539 (Tumpuan) Check = (OK) to (OK)
c. Cek kendali Tarik Penampang
a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 58.0714 ; a/d = 0.09218 ; (OK)
- Tulangan Lapangan = 56.9077 ; a/d = 0.09033 ; (OK)

5 SKETSA PENULANGAN
600 Tulangan Atas = 3 D 29
0 D 0
Tulangan Bawah = 3 D 29
0 D 0
Tulangan Torsi = 4 D 18
700 0 D 0
Tulangan Beugle = P 19 - 100
Mutu Beton = K - 250
Mutu Baja = BJTS - 280
= BJTP - 280

600
Tulangan Atas = 5 D 23
0 D 0
Tulangan Bawah = 8 D 18
0 D 0
Tulangan Torsi = 6 D 16
700 0 D 0
Tulangan Beugle = P 6 - 100
Mutu Beton = K - 250
Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)


6 Kontrol Retak
A = 22000 mm^2 z = 29.8369 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 55 mm

3.4 Penulangan Balok (LT1A)


Letak Tumpuan
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 556.556 mm2
b. Bottom Area = 359.173 mm3
c. Maximum Shear Rebar = 1.214 mm2/mm
d. Torsi (Axis) (At/a) = 0.528 mm2/mm
e. Torsi Memanjang = 657.627 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 6 D 16 Area = 1206.37 mm2
0 D 0 Area = 0 mm2
Total = 1206.37 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 6 D 16 Area = 1206.37 mm2


0 D 0 Area = 0 mm2
Total = 1206.37 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 19 - 100 ; AV Area = 283.529


(Gunakan di area tumpuan) Av/s Area = 2.83529
Chechk for as use = 2.33549 ; 1
= (OK)

d. Tulangan Torsi = 4 D 18 Area = 1017.88


0 D 0 Area = 0
Total = 1017.88
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0067 (Tulangan) Check = (OK) to (OK)
0.0067 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 50.5846 ; a/d = 0.11241 ; (OK)
- Tulangan Lapangan = 50.5846 ; a/d = 0.11241 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 176.894 mm2
b. Bottom Area = 227.411 mm3
c. Maximum Shear Rebar = 1.214 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 18 Area = 1017.88 mm2
0 D 0 Area = 0 mm2
Total = 1017.88 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 22 Area = 1520.53 mm2


0 D 0 Area = 0 mm2
Total = 1520.53 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 16 - 100 ; AV Area = 201.062


(Gunakan di area tumpuan) Av/s Area = 2.01062
Chechk for as use = 1.65619 ; 1
= (OK)

d. Tulangan Torsi = 6 D 16 Area = 1206.37


0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)
4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS
fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00565 (Tulangan) Check = (OK) to (OK)
0.00845 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 42.6808 ; a/d = 0.09485 ; (OK)
- Tulangan Lapangan = 63.7577 ; a/d = 0.14168 ; (OK)

5 SKETSA PENULANGAN

400 Tulangan Atas = 6 D 16


0 D 0
Tulangan Bawah = 6 D 16
0 D 0
Tulangan Torsi = 4 D 18
500 0 D 0
Tulangan Beugle = P 19 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

400
Tulangan Atas = 4 D 18
0 D 0
Tulangan Bawah = 4 D 22
0 D 0
Tulangan Torsi = 6 D 16
500 0 D 0
Tulangan Beugle = P 16 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 8933.33 mm^2 z = 23.5969 MN/m
n = 6 syarat z < 30 Mn/m (OK)
ds = 67 mm

3.5 Penulangan Balok (LT1B)


Letak Tumpuan
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2276.7 mm2
b. Bottom Area = 1051.61 mm3
c. Maximum Shear Rebar = 1.351 mm2/mm
d. Torsi (Axis) (At/a) = 0.513 mm2/mm
e. Torsi Memanjang = 637.944 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 26 Area = 1061.86 mm2


0 D 0 Area = 0 mm2
Total = 1061.86 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 19 - 100 ; AV Area = 283.529


(Gunakan di area tumpuan) Av/s Area = 2.83529
Chechk for as use = 2.09866 ; 1
= (OK)

d. Tulangan Torsi = 4 D 18 Area = 1017.88


0 D 0 Area = 0
Total = 1017.88
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01738 (Tulangan) Check = (OK) to (OK)
0.00749 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 118.031 ; a/d = 0.29143 ; (OK)
- Tulangan Lapangan = 50.8857 ; a/d = 0.12564 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 678.166 mm2
b. Bottom Area = 960.951 mm3
c. Maximum Shear Rebar = 0.431 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 767.365 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 26 Area = 1061.86 mm2
0 D 0 Area = 0 mm2
Total = 1061.86 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 6 D 16 Area = 1206.37 mm2


0 D 0 Area = 0 mm2
Total = 1206.37 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 1.16625 ; 1
= (OK)

d. Tulangan Torsi = 6 D 16 Area = 1206.37


0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00749 (Tulangan) Check = (OK) to (OK)
0.00851 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 50.8857 ; a/d = 0.12564 ; (OK)
- Tulangan Lapangan = 57.811 ; a/d = 0.14274 ; (OK)

5 SKETSA PENULANGAN

350 Tulangan Atas = 4 D 28


0 D 0
Tulangan Bawah = 2 D 26
0 D 0
Tulangan Torsi = 4 D 18
450 0 D 0
Tulangan Beugle = P 19 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

350
Tulangan Atas = 2 D 26
0 D 0
Tulangan Bawah = 6 D 16
0 D 0
Tulangan Torsi = 6 D 16
450 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 19600 mm^2 z = 28.8828 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 56 mm

3.6 Penulangan Balok (LT1C)


Letak Tumpuan
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2371.42 mm2
b. Bottom Area = 1114.21 mm3
c. Maximum Shear Rebar = 1.216 mm2/mm
d. Torsi (Axis) (At/a) = 0.544 mm2/mm
e. Torsi Memanjang = 785.565 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 28 Area = 1231.5 mm2


0 D 0 Area = 0 mm2
Total = 1231.5 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 19 - 100 ; AV Area = 283.529


(Gunakan di area tumpuan) Av/s Area = 2.83529
Chechk for as use = 2.33165 ; 1
= (OK)

d. Tulangan Torsi = 4 D 18 Area = 1017.88


0 D 0 Area = 0
Total = 1017.88
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01368 (Tulangan) Check = (OK) to (OK)
0.00684 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 103.277 ; a/d = 0.2295 ; (OK)
- Tulangan Lapangan = 51.6385 ; a/d = 0.11475 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 722.973 mm2
b. Bottom Area = 946.102 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 26 Area = 1061.86 mm2
0 D 0 Area = 0 mm2
Total = 1061.86 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 8 D 14 Area = 1231.5 mm2
0 D 0 Area = 0 mm2
Total = 1231.5 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 16 Area = 1206.37


0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0059 (Tulangan) Check = (OK) to (OK)
0.00684 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 44.525 ; a/d = 0.09894 ; (OK)
- Tulangan Lapangan = 51.6385 ; a/d = 0.11475 ; (OK)

5 SKETSA PENULANGAN

400 Tulangan Atas = 4 D 28


0 D 0
Tulangan Bawah = 2 D 28
0 D 0
Tulangan Torsi = 4 D 18
500 0 D 0
Tulangan Beugle = P 19 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

400
Tulangan Atas = 2 D 26
0 D 0
Tulangan Bawah = 8 D 14
0 D 0
Tulangan Torsi = 6 D 16
500 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 21200 mm^2 z = 29.1091 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 53 mm

3.7 Penulangan Balok (LT1D)


Letak Tumpuan
1. Dimensi Balok 450 : 550 mm : Pb = 40 mm
: d = 495 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2370.39 mm2
b. Bottom Area = 1130.25 mm3
c. Maximum Shear Rebar = 4.129 mm2/mm
d. Torsi (Axis) (At/a) = 0.257 mm2/mm
e. Torsi Memanjang = 1171.66 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 2 D 28 Area = 1231.5 mm2
0 D 0 Area = 0 mm2
Total = 1231.5 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 1.18884 ; 1
= (OK)

d. Tulangan Torsi = 4 D 20 Area = 1256.64


0 D 0 Area = 0
Total = 1256.64
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 881.395
Tidak boleh kurang dari As min = 1113.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01106 (Tulangan) Check = (OK) to (OK)
0.00553 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 91.8018 ; a/d = 0.18546 ; (OK)
- Tulangan Lapangan = 45.9009 ; a/d = 0.09273 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 450 : 550 mm : Pb = 40 mm
: d = 495 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 736.615 mm2
b. Bottom Area = 736.615 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 28 Area = 1231.5 mm2
0 D 0 Area = 0 mm2
Total = 1231.5 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 7 D 12 Area = 791.681 mm2


0 D 0 Area = 0 mm2
Total = 791.681 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 16 Area = 1206.37


0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 881.395
Tidak boleh kurang dari As min = 1113.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (NO

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00553 (Tulangan) Check = (OK) to (OK)
0.00355 (Tumpuan) Check = (NO) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 45.9009 ; a/d = 0.09273 ; (OK)
- Tulangan Lapangan = 29.5077 ; a/d = 0.05961 ; (OK)

5 SKETSA PENULANGAN

450 Tulangan Atas = 4 D 28


0 D 0
Tulangan Bawah = 2 D 28
0 D 0
Tulangan Torsi = 4 D 20
550 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

450
Tulangan Atas = 2 D 28
0 D 0
Tulangan Bawah = 7 D 12
0 D 0
Tulangan Torsi = 6 D 16
550 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 23400 mm^2 z = 29.8927 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 52 mm

3.8 Penulangan Balok (LT1E)


Letak Tumpuan
1. Dimensi Balok 500 : 600 mm : Pb = 40 mm
: d = 540 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2906.66 mm2
b. Bottom Area = 1384.27 mm3
c. Maximum Shear Rebar = 1.533 mm2/mm
d. Torsi (Axis) (At/a) = 0.895 mm2/mm
e. Torsi Memanjang = 1650.98 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 5 D 28 Area = 3078.76 mm2
0 D 0 Area = 0 mm2
Total = 3078.76 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 22 Area = 1520.53 mm2


0 D 0 Area = 0 mm2
Total = 1520.53 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 3.20205 ; 1
= (OK)

d. Tulangan Torsi = 4 D 24 Area = 1809.56


0 D 0 Area = 0
Total = 1809.56
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 1068.36
Tidak boleh kurang dari As min = 1350
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0114 (Tulangan) Check = (OK) to (OK)
0.00563 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 103.277 ; a/d = 0.19125 ; (OK)
- Tulangan Lapangan = 51.0062 ; a/d = 0.09446 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 500 : 600 mm : Pb = 40 mm
: d = 540 mm
2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:
a. Top Area = 902.917 mm2
b. Bottom Area = 1531.72 mm3
c. Maximum Shear Rebar = 0.151 mm2/mm
d. Torsi (Axis) (At/a) = 0.618 mm2/mm
e. Torsi Memanjang = 1139.63 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 26 Area = 1592.79 mm2
0 D 0 Area = 0 mm2
Total = 1592.79 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 29 Area = 1981.56 mm2


0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 1.87247 ; 1
= (OK)

d. Tulangan Torsi = 6 D 16 Area = 1206.37


0 D 0 Area = 0
Total = 1206.37
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1068.36
Tidak boleh kurang dari As min = 1350
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0059 (Tulangan) Check = (OK) to (OK)
0.00734 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 53.43 ; a/d = 0.09894 ; (OK)
- Tulangan Lapangan = 66.4714 ; a/d = 0.1231 ; (OK)

5 SKETSA PENULANGAN

500 Tulangan Atas = 5 D 28


0 D 0
Tulangan Bawah = 4 D 22
0 D 0
Tulangan Torsi = 4 D 24
600 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

500
Tulangan Atas = 3 D 26
0 D 0
Tulangan Bawah = 3 D 29
0 D 0
Tulangan Torsi = 6 D 16
600 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280
LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 15125 mm^2 z = 27.1837 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 60.5 mm

3.9 Penulangan Balok (LT1F)


Letak Tumpuan
1. Dimensi Balok 650 : 750 mm : Pb = 40 mm
: d = 675 mm
2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:
a. Top Area = 3371.36 mm2
b. Bottom Area = 2174.39 mm3
c. Maximum Shear Rebar = 1.145 mm2/mm
d. Torsi (Axis) (At/a) = 1.343 mm2/mm
e. Torsi Memanjang = 3282.87 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 6 D 27 Area = 3435.33 mm2
0 D 0 Area = 0 mm2
Total = 3435.33 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 27 Area = 2290.22 mm2


0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 4.28711 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1736.08
Tidak boleh kurang dari As min = 2193.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00783 (Tulangan) Check = (OK) to (OK)
0.00522 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 88.6447 ; a/d = 0.13133 ; (OK)
- Tulangan Lapangan = 59.0965 ; a/d = 0.08755 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 650 : 750 mm : Pb = 40 mm
: d = 675 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1070.62 mm2
b. Bottom Area = 2036.98 mm3
c. Maximum Shear Rebar = 0.097 mm2/mm
d. Torsi (Axis) (At/a) = 1.124 mm2/mm
e. Torsi Memanjang = 2748.16 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 27 Area = 2290.22 mm2


0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 2.91488 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1736.08
Tidak boleh kurang dari As min = 2193.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00561 (Tulangan) Check = (OK) to (OK)
0.00522 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 63.5551 ; a/d = 0.09416 ; (OK)
- Tulangan Lapangan = 59.0965 ; a/d = 0.08755 ; (OK)

5 SKETSA PENULANGAN

650 Tulangan Atas = 6 D 27


0 D 0
Tulangan Bawah = 4 D 27
0 D 0
Tulangan Torsi = 5 D 29
750 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

650
Tulangan Atas = 4 D 28
0 D 0
Tulangan Bawah = 4 D 27
0 D 0
Tulangan Torsi = 6 D 25
750 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 19337.5 mm^2 z = 29.3402 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 59.5 mm

3.10 Penulangan Balok ANAK (LT1)


Letak Tumpuan
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1950.23 mm2
b. Bottom Area = 1209.48 mm3
c. Maximum Shear Rebar = 0.04 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 27 Area = 2290.22 mm2
0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 27 Area = 2290.22 mm2


0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 122.718 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)
b. Cek Rasio Tulangan ;
p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00606 (Tulangan) Check = (OK) to (OK)
0.00606 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 64.0212 ; a/d = 0.10162 ; (OK)
- Tulangan Lapangan = 64.0212 ; a/d = 0.10162 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 598.826 mm2
b. Bottom Area = 1070.04 mm3
c. Maximum Shear Rebar = 0.01 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 27 Area = 2290.22 mm2


0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 28.2743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00652 (Tulangan) Check = (OK) to (OK)
0.00606 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 68.8513 ; a/d = 0.10929 ; (OK)
- Tulangan Lapangan = 64.0212 ; a/d = 0.10162 ; (OK)

5 SKETSA PENULANGAN

600 Tulangan Atas = 4 D 27


0 D 0
Tulangan Bawah = 4 D 27
0 D 0
Tulangan Torsi = 5 D 29
700 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280
600
Tulangan Atas = 4 D 28
0 D 0
Tulangan Bawah = 4 D 27
0 D 0
Tulangan Torsi = 6 D 25
700 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 17850 mm^2 z = 28.5678 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 59.5 mm

3.11 Penulangan Balok (LT2A)


Letak Tumpuan
1. Dimensi Balok 200 : 300 mm : Pb = 40 mm
: d = 270 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 475.547 mm2
b. Bottom Area = 256.091 mm3
c. Maximum Shear Rebar = 0.01 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 19 Area = 567.057 mm2
0 D 0 Area = 0 mm2
Total = 567.057 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 19 Area = 567.057 mm2


0 D 0 Area = 0 mm2
Total = 567.057 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 24 - 100 ; AV Area = 452.389


(Gunakan di area tumpuan) Av/s Area = 4.52389
Chechk for as use = 452.389 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 213.671
Tidak boleh kurang dari As min = 270
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0105 (Tulangan) Check = (OK) to (OK)
0.0105 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 47.5548 ; a/d = 0.17613 ; (OK)
- Tulangan Lapangan = 47.5548 ; a/d = 0.17613 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 200 : 300 mm : Pb = 40 mm
: d = 270 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 149.056 mm2
b. Bottom Area = 232.825 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 14 Area = 307.876 mm2
0 D 0 Area = 0 mm2
Total = 307.876 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 14 Area = 307.876 mm2


0 D 0 Area = 0 mm2
Total = 307.876 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 213.671
Tidak boleh kurang dari As min = 270
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0057 (Tulangan) Check = (OK) to (OK)
0.0057 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 25.8192 ; a/d = 0.09563 ; (OK)
- Tulangan Lapangan = 25.8192 ; a/d = 0.09563 ; (OK)

5 SKETSA PENULANGAN

200 Tulangan Atas = 2 D 19


0 D 0
Tulangan Bawah = 2 D 19
0 D 0
Tulangan Torsi = 5 D 29
300 0 D 0
Tulangan Beugle = P 24 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

200
Tulangan Atas = 2 D 14
0 D 0
Tulangan Bawah = 2 D 14
0 D 0
Tulangan Torsi = 6 D 25
300 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)


6 Kontrol Retak
A = 10600 mm^2 z = 23.1039 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 53 mm

3.12 Penulangan Balok (LT2C)


Letak Tumpuan
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2301.09 mm2
b. Bottom Area = 1061.8 mm3
c. Maximum Shear Rebar = 1.369 mm2/mm
d. Torsi (Axis) (At/a) = 0.442 mm2/mm
e. Torsi Memanjang = 550.593 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 26 Area = 1061.86 mm2


0 D 0 Area = 0 mm2
Total = 1061.86 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 3.58564 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01864 (Tulangan) Check = (OK) to (OK)
0.00749 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 126.612 ; a/d = 0.31262 ; (OK)
- Tulangan Lapangan = 50.8857 ; a/d = 0.12564 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 684.503 mm2
b. Bottom Area = 959.953 mm3
c. Maximum Shear Rebar = 0.166 mm2/mm
d. Torsi (Axis) (At/a) = 0.161 mm2/mm
e. Torsi Memanjang = 767.365 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 22 Area = 760.265 mm2
0 D 0 Area = 0 mm2
Total = 760.265 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 26 Area = 1061.86 mm2


0 D 0 Area = 0 mm2
Total = 1061.86 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 1.70327 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00536 (Tulangan) Check = (OK) to (OK)
0.00749 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 36.433 ; a/d = 0.08996 ; (OK)
- Tulangan Lapangan = 50.8857 ; a/d = 0.12564 ; (OK)
5 SKETSA PENULANGAN

350 Tulangan Atas = 4 D 29


0 D 0
Tulangan Bawah = 2 D 26
0 D 0
Tulangan Torsi = 5 D 29
450 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

350
Tulangan Atas = 2 D 22
0 D 0
Tulangan Bawah = 2 D 26
0 D 0
Tulangan Torsi = 6 D 25
450 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 20650 mm^2 z = 29.9053 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 59 mm

3.13 Penulangan Balok (LT2D)


Letak Tumpuan
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2302.5 mm2
b. Bottom Area = 1084.07 mm3
c. Maximum Shear Rebar = 1.448 mm2/mm
d. Torsi (Axis) (At/a) = 0.699 mm2/mm
e. Torsi Memanjang = 1009.24 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 22 Area = 1140.4 mm2


0 D 0 Area = 0 mm2
Total = 1140.4 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 3.39001 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01368 (Tulangan) Check = (OK) to (OK)
0.00634 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 103.277 ; a/d = 0.2295 ; (OK)
- Tulangan Lapangan = 47.8183 ; a/d = 0.10626 ; (OK)
LETAK LAPANGAN
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 703.962 mm2
b. Bottom Area = 1044.4 mm3
c. Maximum Shear Rebar = 0.084 mm2/mm
d. Torsi (Axis) (At/a) = 0.204 mm2/mm
e. Torsi Memanjang = 959.231 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 24 Area = 904.779 mm2
0 D 0 Area = 0 mm2
Total = 904.779 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 26 Area = 1061.86 mm2


0 D 0 Area = 0 mm2
Total = 1061.86 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 3.36599 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00503 (Tulangan) Check = (OK) to (OK)
0.0059 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 37.9385 ; a/d = 0.08431 ; (OK)
- Tulangan Lapangan = 44.525 ; a/d = 0.09894 ; (OK)

5 SKETSA PENULANGAN

400 Tulangan Atas = 4 D 28


0 D 0
Tulangan Bawah = 3 D 22
0 D 0
Tulangan Torsi = 5 D 29
500 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

400
Tulangan Atas = 2 D 24
0 D 0
Tulangan Bawah = 2 D 26
0 D 0
Tulangan Torsi = 6 D 25
500 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 15733.3 mm^2 z = 27.3138 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 59 mm
3.14 Penulangan Balok (LT2E)
Letak Tumpuan
1. Dimensi Balok 650 : 750 mm : Pb = 40 mm
: d = 675 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 3625.85 mm2
b. Bottom Area = 2272.81 mm3
c. Maximum Shear Rebar = 0.778 mm2/mm
d. Torsi (Axis) (At/a) = 0.348 mm2/mm
e. Torsi Memanjang = 2226.97 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 6 D 29 Area = 3963.12 mm2
0 D 0 Area = 0 mm2
Total = 3963.12 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 29 Area = 2642.08 mm2


0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 6.30943 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1736.08
Tidak boleh kurang dari As min = 2193.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00903 (Tulangan) Check = (OK) to (OK)
0.00602 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 102.264 ; a/d = 0.1515 ; (OK)
- Tulangan Lapangan = 68.1758 ; a/d = 0.101 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 650 : 750 mm : Pb = 40 mm
: d = 675 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1146.98 mm2
b. Bottom Area = 1152.42 mm3
c. Maximum Shear Rebar = 0.425 mm2/mm
d. Torsi (Axis) (At/a) = 1.032 mm2/mm
e. Torsi Memanjang = 2522.67 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 27 Area = 2290.22 mm2


0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 1.18272 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 1736.08
Tidak boleh kurang dari As min = 2193.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00561 (Tulangan) Check = (OK) to (OK)
0.00522 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 63.5551 ; a/d = 0.09416 ; (OK)
- Tulangan Lapangan = 59.0965 ; a/d = 0.08755 ; (OK)

5 SKETSA PENULANGAN

650 Tulangan Atas = 6 D 29


0 D 0
Tulangan Bawah = 4 D 29
0 D 0
Tulangan Torsi = 5 D 29
750 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

650
Tulangan Atas = 4 D 28
0 D 0
Tulangan Bawah = 4 D 27
0 D 0
Tulangan Torsi = 6 D 25
750 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 19987.5 mm^2 z = 29.9941 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 61.5 mm

3.15 Penulangan Balok Anak(LT2)


Letak Tumpuan
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1950.23 mm2
b. Bottom Area = 1082.47 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 29 Area = 1981.56 mm2
0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 29 Area = 1981.56 mm2


0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 4908.74 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00524 (Tulangan) Check = (OK) to (OK)
0.00524 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 55.3928 ; a/d = 0.08793 ; (OK)
- Tulangan Lapangan = 55.3928 ; a/d = 0.08793 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 536.506 mm2
b. Bottom Area = 984.091 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 28 Area = 2463.01 mm2
0 D 0 Area = 0 mm2
Total = 2463.01 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 5 D 17 Area = 1134.9 mm2


0 D 0 Area = 0 mm2
Total = 1134.9 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (NO

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00652 (Tulangan) Check = (OK) to (OK)
0.003 (Tumpuan) Check = (NO) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 68.8513 ; a/d = 0.10929 ; (OK)
- Tulangan Lapangan = 31.7252 ; a/d = 0.05036 ; (OK)

5 SKETSA PENULANGAN

600 Tulangan Atas = 3 D 29


0 D 0
Tulangan Bawah = 3 D 29
0 D 0
Tulangan Torsi = 5 D 29
700 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280
600
Tulangan Atas = 4 D 28
0 D 0
Tulangan Bawah = 5 D 17
0 D 0
Tulangan Torsi = 6 D 25
700 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 21800 mm^2 z = 29.6558 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 54.5 mm

3.16 Penulangan Balok (LT3A)


Letak Tumpuan
1. Dimensi Balok 200 : 300 mm : Pb = 40 mm
: d = 270 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 427.41 mm2
b. Bottom Area = 256.091 mm3
c. Maximum Shear Rebar = 0.01 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 19 Area = 567.057 mm2
0 D 0 Area = 0 mm2
Total = 567.057 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 16 Area = 402.124 mm2


0 D 0 Area = 0 mm2
Total = 402.124 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 490.874 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 213.671
Tidak boleh kurang dari As min = 270
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0105 (Tulangan) Check = (OK) to (OK)
0.00745 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 47.5548 ; a/d = 0.17613 ; (OK)
- Tulangan Lapangan = 33.7231 ; a/d = 0.1249 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 200 : 300 mm : Pb = 40 mm
: d = 270 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 134.857 mm2
b. Bottom Area = 231.758 mm3
c. Maximum Shear Rebar = 0 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 14 Area = 307.876 mm2
0 D 0 Area = 0 mm2
Total = 307.876 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 2 D 16 Area = 402.124 mm2
0 D 0 Area = 0 mm2
Total = 402.124 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = #DIV/0! ; 1
= #DIV/0!

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 213.671
Tidak boleh kurang dari As min = 270
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0057 (Tulangan) Check = (OK) to (OK)
0.00745 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 25.8192 ; a/d = 0.09563 ; (OK)
- Tulangan Lapangan = 33.7231 ; a/d = 0.1249 ; (OK)

5 SKETSA PENULANGAN

200 Tulangan Atas = 2 D 19


0 D 0
Tulangan Bawah = 2 D 16
0 D 0
Tulangan Torsi = 5 D 29
300 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

200
Tulangan Atas = 2 D 14
0 D 0
Tulangan Bawah = 2 D 16
0 D 0
Tulangan Torsi = 6 D 25
300 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 11200 mm^2 z = 23.9677 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 56 mm

3.16 Penulangan Balok (LT3B)


Letak Tumpuan
1. Dimensi Balok 300 : 400 mm : Pb = 40 mm
: d = 360 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1706.28 mm2
b. Bottom Area = 788.44 mm3
c. Maximum Shear Rebar = 1.124 mm2/mm
d. Torsi (Axis) (At/a) = 0.308 mm2/mm
e. Torsi Memanjang = 467.496 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 24 Area = 1809.56 mm2
0 D 0 Area = 0 mm2
Total = 1809.56 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 3 D 20 Area = 942.478 mm2
0 D 0 Area = 0 mm2
Total = 942.478 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 4.36721 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 427.343
Tidak boleh kurang dari As min = 540
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01676 (Tulangan) Check = (OK) to (OK)
0.00873 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 101.169 ; a/d = 0.28103 ; (OK)
- Tulangan Lapangan = 52.6923 ; a/d = 0.14637 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 300 : 400 mm : Pb = 40 mm
: d = 360 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 508.524 mm2
b. Bottom Area = 821.577 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 22 Area = 760.265 mm2
0 D 0 Area = 0 mm2
Total = 760.265 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 24 Area = 904.779 mm2


0 D 0 Area = 0 mm2
Total = 904.779 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 502.655 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 427.343
Tidak boleh kurang dari As min = 540
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00704 (Tulangan) Check = (OK) to (OK)
0.00838 (Tumpuan) Check = (OK) to (OK)
c. Cek kendali Tarik Penampang
a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 42.5052 ; a/d = 0.11807 ; (OK)
- Tulangan Lapangan = 50.5846 ; a/d = 0.14051 ; (OK)
5 SKETSA PENULANGAN

300 Tulangan Atas = 4 D 24


0 D 0
Tulangan Bawah = 3 D 20
0 D 0
Tulangan Torsi = 5 D 29
400 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

300
Tulangan Atas = 2 D 22
0 D 0
Tulangan Bawah = 2 D 24
0 D 0
Tulangan Torsi = 6 D 25
400 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 12000 mm^2 z = 25.0959 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 60 mm

3.17 Penulangan Balok (LT3C)


Letak Tumpuan
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1939.04 mm2
b. Bottom Area = 907.888 mm3
c. Maximum Shear Rebar = 1.191 mm2/mm
d. Torsi (Axis) (At/a) = 0.254 mm2/mm
e. Torsi Memanjang = 718.946 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 26 Area = 2123.72 mm2
0 D 0 Area = 0 mm2
Total = 2123.72 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 20 Area = 942.478 mm2


0 D 0 Area = 0 mm2
Total = 942.478 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 4.12153 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01498 (Tulangan) Check = (OK) to (OK)
0.00665 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 101.771 ; a/d = 0.25129 ; (OK)
- Tulangan Lapangan = 45.1649 ; a/d = 0.11152 ; (OK)
LETAK LAPANGAN
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 619.485 mm2
b. Bottom Area = 939.359 mm3
c. Maximum Shear Rebar = 0.174 mm2/mm
d. Torsi (Axis) (At/a) = 0.174 mm2/mm
e. Torsi Memanjang = 767.365 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 22 Area = 760.265 mm2
0 D 0 Area = 0 mm2
Total = 760.265 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 25 Area = 981.748 mm2


0 D 0 Area = 0 mm2
Total = 981.748 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 2.88882 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00536 (Tulangan) Check = (OK) to (OK)
0.00693 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 36.433 ; a/d = 0.08996 ; (OK)
- Tulangan Lapangan = 47.0467 ; a/d = 0.11616 ; (OK)

5 SKETSA PENULANGAN

350 Tulangan Atas = 4 D 26


0 D 0
Tulangan Bawah = 3 D 20
0 D 0
Tulangan Torsi = 5 D 29
450 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

350
Tulangan Atas = 2 D 22
0 D 0
Tulangan Bawah = 2 D 25
0 D 0
Tulangan Torsi = 6 D 25
450 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 14116.7 mm^2 z = 26.5657 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 60.5 mm
3.18 Penulangan Balok (LT3D)
Letak Tumpuan
1. Dimensi Balok 450 : 550 mm : Pb = 40 mm
: d = 495 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2262.72 mm2
b. Bottom Area = 1130.25 mm3
c. Maximum Shear Rebar = 1.374 mm2/mm
d. Torsi (Axis) (At/a) = 0.641 mm2/mm
e. Torsi Memanjang = 1053.63 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 22 Area = 1140.4 mm2


0 D 0 Area = 0 mm2
Total = 1140.4 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 3.57259 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 881.395
Tidak boleh kurang dari As min = 1113.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01186 (Tulangan) Check = (OK) to (OK)
0.00512 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 98.4761 ; a/d = 0.19894 ; (OK)
- Tulangan Lapangan = 42.5052 ; a/d = 0.08587 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 450 : 550 mm : Pb = 40 mm
: d = 495 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 705.57 mm2
b. Bottom Area = 1130.25 mm3
c. Maximum Shear Rebar = 0.261 mm2/mm
d. Torsi (Axis) (At/a) = 0.287 mm2/mm
e. Torsi Memanjang = 1171.66 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 29 Area = 1321.04 mm2
0 D 0 Area = 0 mm2
Total = 1321.04 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 28 Area = 1231.5 mm2


0 D 0 Area = 0 mm2
Total = 1231.5 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 1.92588 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)
4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS
fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 881.395
Tidak boleh kurang dari As min = 1113.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00593 (Tulangan) Check = (OK) to (OK)
0.00553 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 49.2381 ; a/d = 0.09947 ; (OK)
- Tulangan Lapangan = 45.9009 ; a/d = 0.09273 ; (OK)

5 SKETSA PENULANGAN

450 Tulangan Atas = 4 D 29


0 D 0
Tulangan Bawah = 3 D 22
0 D 0
Tulangan Torsi = 5 D 29
550 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

450
Tulangan Atas = 2 D 29
0 D 0
Tulangan Bawah = 2 D 28
0 D 0
Tulangan Torsi = 6 D 25
550 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 18600 mm^2 z = 29.3625 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 62 mm

3.19 Penulangan Balok (LT3E)


Letak Tumpuan
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2756.39 mm2
b. Bottom Area = 1780.75 mm3
c. Maximum Shear Rebar = 0.859 mm2/mm
d. Torsi (Axis) (At/a) = 0.4 mm2/mm
e. Torsi Memanjang = 1864.3 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 5 D 29 Area = 3302.6 mm2
0 D 0 Area = 0 mm2
Total = 3302.6 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 26 Area = 2123.72 mm2


0 D 0 Area = 0 mm2
Total = 2123.72 mm2
Chechk for as use (OK)
c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874
(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 5.71448 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)
4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS
fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00874 (Tulangan) Check = (OK) to (OK)
0.00562 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 92.3214 ; a/d = 0.14654 ; (OK)
- Tulangan Lapangan = 59.3667 ; a/d = 0.09423 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 600 : 700 mm : Pb = 40 mm
: d = 630 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 877.434 mm2
b. Bottom Area = 1286.68 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0.903 mm2/mm
e. Torsi Memanjang = 2025.63 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 29 Area = 1981.56 mm2
0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 29 Area = 1981.56 mm2


0 D 0 Area = 0 mm2
Total = 1981.56 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 502.655 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1495.7
Tidak boleh kurang dari As min = 1890
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00524 (Tulangan) Check = (OK) to (OK)
0.00524 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 55.3928 ; a/d = 0.08793 ; (OK)
- Tulangan Lapangan = 55.3928 ; a/d = 0.08793 ; (OK)

5 SKETSA PENULANGAN

600 Tulangan Atas = 5 D 29


0 D 0
Tulangan Bawah = 4 D 26
0 D 0
Tulangan Torsi = 5 D 29
700 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280
600
Tulangan Atas = 3 D 29
0 D 0
Tulangan Bawah = 3 D 29
0 D 0
Tulangan Torsi = 6 D 25
700 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 18750 mm^2 z = 29.5201 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 62.5 mm

3.20 Penulangan Balok (LT3F)


Letak Tumpuan
1. Dimensi Balok 650 : 750 mm : Pb = 40 mm
: d = 675 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2679.48 mm2
b. Bottom Area = 1740.69 mm3
c. Maximum Shear Rebar = 0.798 mm2/mm
d. Torsi (Axis) (At/a) = 0.334 mm2/mm
e. Torsi Memanjang = 2226.97 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 5 D 29 Area = 3302.6 mm2
0 D 0 Area = 0 mm2
Total = 3302.6 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 29 Area = 2642.08 mm2


0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 6.1513 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1736.08
Tidak boleh kurang dari As min = 2193.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00753 (Tulangan) Check = (OK) to (OK)
0.00602 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 85.2197 ; a/d = 0.12625 ; (OK)
- Tulangan Lapangan = 68.1758 ; a/d = 0.101 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 650 : 750 mm : Pb = 40 mm
: d = 675 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 859.781 mm2
b. Bottom Area = 1347.87 mm3
c. Maximum Shear Rebar = 0.445 mm2/mm
d. Torsi (Axis) (At/a) = 0.224 mm2/mm
e. Torsi Memanjang = 2226.97 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 4 D 27 Area = 2290.22 mm2
0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 8 - 100 ; AV Area = 50.2655


(Gunakan di area tumpuan) Av/s Area = 0.50265
Chechk for as use = 1.12956 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1736.08
Tidak boleh kurang dari As min = 2193.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00602 (Tulangan) Check = (OK) to (OK)
0.00522 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 68.1758 ; a/d = 0.101 ; (OK)
- Tulangan Lapangan = 59.0965 ; a/d = 0.08755 ; (OK)

5 SKETSA PENULANGAN

650 Tulangan Atas = 5 D 29


0 D 0
Tulangan Bawah = 4 D 29
0 D 0
Tulangan Torsi = 5 D 29
750 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

650
Tulangan Atas = 4 D 29
0 D 0
Tulangan Bawah = 4 D 27
0 D 0
Tulangan Torsi = 6 D 25
750 0 D 0
Tulangan Beugle = P 8 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 19987.5 mm^2 z = 29.9941 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 61.5 mm

3.21 Penulangan Balok (LT3G)


Letak Tumpuan
1. Dimensi Balok 700 : 800 mm : Pb = 40 mm
: d = 720 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 3000.25 mm2
b. Bottom Area = 1950.61 mm3
c. Maximum Shear Rebar = 0.414 mm2/mm
d. Torsi (Axis) (At/a) = 0.279 mm2/mm
e. Torsi Memanjang = 2542.19 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 5 D 29 Area = 3302.6 mm2
0 D 0 Area = 0 mm2
Total = 3302.6 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 11.8569 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1994.27
Tidak boleh kurang dari As min = 2520
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00655 (Tulangan) Check = (OK) to (OK)
0.00524 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 79.1326 ; a/d = 0.10991 ; (OK)
- Tulangan Lapangan = 63.3061 ; a/d = 0.08793 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 700 : 800 mm : Pb = 40 mm
: d = 720 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 963.805 mm2
b. Bottom Area = 1249.96 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 22 Area = 1520.53 mm2


0 D 0 Area = 0 mm2
Total = 1520.53 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1994.27
Tidak boleh kurang dari As min = 2520
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (NO

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00524 (Tulangan) Check = (OK) to (OK)
0.00302 (Tumpuan) Check = (NO) to (OK)
c. Cek kendali Tarik Penampang
a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 63.3061 ; a/d = 0.08793 ; (OK)
- Tulangan Lapangan = 36.433 ; a/d = 0.0506 ; (OK)
5 SKETSA PENULANGAN

700 Tulangan Atas = 5 D 29


0 D 0
Tulangan Bawah = 4 D 29
0 D 0
Tulangan Torsi = 5 D 29
800 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

700
Tulangan Atas = 4 D 29
0 D 0
Tulangan Bawah = 4 D 22
0 D 0
Tulangan Torsi = 6 D 25
800 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 19950 mm^2 z = 29.2256 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 57 mm

3.22 Penulangan Balok Anak (LT3)


Letak Tumpuan
1. Dimensi Balok 500 : 600 mm : Pb = 40 mm
: d = 540 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1378.95 mm2
b. Bottom Area = 830.362 mm3
c. Maximum Shear Rebar = 0.25 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 5 D 29 Area = 3302.6 mm2
0 D 0 Area = 0 mm2
Total = 3302.6 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 29 Area = 2642.08 mm2


0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 19.635 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1068.36
Tidak boleh kurang dari As min = 1350
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01223 (Tulangan) Check = (OK) to (OK)
0.00979 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 110.786 ; a/d = 0.20516 ; (OK)
- Tulangan Lapangan = 88.6285 ; a/d = 0.16413 ; (OK)
LETAK LAPANGAN
1. Dimensi Balok 500 : 600 mm : Pb = 40 mm
: d = 540 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 411.24 mm2
b. Bottom Area = 1038.43 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 4 D 29 Area = 2642.08 mm2


0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1068.36
Tidak boleh kurang dari As min = 1350
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00979 (Tulangan) Check = (OK) to (OK)
0.00979 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 88.6285 ; a/d = 0.16413 ; (OK)
- Tulangan Lapangan = 88.6285 ; a/d = 0.16413 ; (OK)

5 SKETSA PENULANGAN

500 Tulangan Atas = 5 D 29


0 D 0
Tulangan Bawah = 4 D 29
0 D 0
Tulangan Torsi = 5 D 29
600 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

500
Tulangan Atas = 4 D 29
0 D 0
Tulangan Bawah = 4 D 29
0 D 0
Tulangan Torsi = 6 D 25
600 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 15125 mm^2 z = 27.1837 MN/m
n = 4 syarat z < 30 Mn/m (OK)
ds = 60.5 mm
3.23 Penulangan Balok (RB.LT4A)
Letak Tumpuan
1. Dimensi Balok 250 : 350 mm : Pb = 40 mm
: d = 315 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1718.08 mm2
b. Bottom Area = 793.972 mm3
c. Maximum Shear Rebar = 0.87 mm2/mm
d. Torsi (Axis) (At/a) = 0.297 mm2/mm
e. Torsi Memanjang = 324.798 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 6 D 13 Area = 796.394 mm2
6 D 14 Area = 923.628 mm2
Total = 1720.02 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 24 Area = 904.779 mm2


0 D 0 Area = 0 mm2
Total = 904.779 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 5.64223 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 311.604
Tidak boleh kurang dari As min = 393.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.02184 (Tulangan) Check = (OK) to (OK)
0.01149 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 115.396 ; a/d = 0.36634 ; (NO)
- Tulangan Lapangan = 60.7016 ; a/d = 0.1927 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 250 : 350 mm : Pb = 40 mm
: d = 315 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 381.674 mm2
b. Bottom Area = 636.322 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 2 D 19 Area = 567.057 mm2
0 D 0 Area = 0 mm2
Total = 567.057 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 22 Area = 760.265 mm2


0 D 0 Area = 0 mm2
Total = 760.265 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 311.604
Tidak boleh kurang dari As min = 393.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.0072 (Tulangan) Check = (OK) to (OK)
0.00965 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 38.0439 ; a/d = 0.12077 ; (OK)
- Tulangan Lapangan = 51.0062 ; a/d = 0.16192 ; (OK)

5 SKETSA PENULANGAN

250 Tulangan Atas = 6 D 13


6 D 14
Tulangan Bawah = 2 D 24
0 D 0
Tulangan Torsi = 5 D 29
350 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

250
Tulangan Atas = 2 D 19
0 D 0
Tulangan Bawah = 2 D 22
0 D 0
Tulangan Torsi = 6 D 25
350 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 14250 mm^2 z = 26.1249 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 57 mm

3.24 Penulangan Balok (RB.LT4B)


Letak Tumpuan
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1930.9 mm2
b. Bottom Area = 904.366 mm3
c. Maximum Shear Rebar = 0.774 mm2/mm
d. Torsi (Axis) (At/a) = 0.298 mm2/mm
e. Torsi Memanjang = 664.583 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 5 D 24 Area = 2261.95 mm2
0 D 0 Area = 0 mm2
Total = 2261.95 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 24 Area = 904.779 mm2


0 D 0 Area = 0 mm2
Total = 904.779 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 6.34204 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa
a. Cek Terhadap Luas As Minimum ;
As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01596 (Tulangan) Check = (OK) to (OK)
0.00638 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 108.396 ; a/d = 0.26764 ; (OK)
- Tulangan Lapangan = 43.3583 ; a/d = 0.10706 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 350 : 450 mm : Pb = 40 mm
: d = 405 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 586.12 mm2
b. Bottom Area = 842.265 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0.607 mm2/mm
e. Torsi Memanjang = 754.801 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 18 Area = 763.407 mm2
0 D 0 Area = 0 mm2
Total = 763.407 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 24 Area = 904.779 mm2


0 D 0 Area = 0 mm2
Total = 904.779 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 560.888
Tidak boleh kurang dari As min = 708.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00539 (Tulangan) Check = (OK) to (OK)
0.00638 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 36.5835 ; a/d = 0.09033 ; (OK)
- Tulangan Lapangan = 43.3583 ; a/d = 0.10706 ; (OK)

5 SKETSA PENULANGAN

350 Tulangan Atas = 5 D 24


0 D 0
Tulangan Bawah = 2 D 24
0 D 0
Tulangan Torsi = 5 D 29
450 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280
350
Tulangan Atas = 3 D 18
0 D 0
Tulangan Bawah = 2 D 24
0 D 0
Tulangan Torsi = 6 D 25
450 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 20300 mm^2 z = 29.5665 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 58 mm

3.25 Penulangan Balok (RB.LT4C)


Letak Tumpuan
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2198.47 mm2
b. Bottom Area = 1038.29 mm3
c. Maximum Shear Rebar = 0.609 mm2/mm
d. Torsi (Axis) (At/a) = 0.261 mm2/mm
e. Torsi Memanjang = 937.666 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 27 Area = 2290.22 mm2
0 D 0 Area = 0 mm2
Total = 2290.22 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 2 D 29 Area = 1321.04 mm2


0 D 0 Area = 0 mm2
Total = 1321.04 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 8.06033 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01272 (Tulangan) Check = (OK) to (OK)
0.00734 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 96.0318 ; a/d = 0.2134 ; (OK)
- Tulangan Lapangan = 55.3928 ; a/d = 0.1231 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 400 : 500 mm : Pb = 40 mm
: d = 450 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 675.028 mm2
b. Bottom Area = 855.694 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 20 Area = 942.478 mm2
0 D 0 Area = 0 mm2
Total = 942.478 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 5 D 18 Area = 1272.35 mm2
0 D 0 Area = 0 mm2
Total = 1272.35 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 712.238
Tidak boleh kurang dari As min = 900
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00524 (Tulangan) Check = (OK) to (OK)
0.00707 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 39.5193 ; a/d = 0.08782 ; (OK)
- Tulangan Lapangan = 53.351 ; a/d = 0.11856 ; (OK)

5 SKETSA PENULANGAN

400 Tulangan Atas = 4 D 27


0 D 0
Tulangan Bawah = 2 D 29
0 D 0
Tulangan Torsi = 5 D 29
500 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

400
Tulangan Atas = 3 D 20
0 D 0
Tulangan Bawah = 5 D 18
0 D 0
Tulangan Torsi = 6 D 25
500 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 22000 mm^2 z = 29.8369 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 55 mm

3.26 Penulangan Balok (RB.LT4D)


Letak Tumpuan
1. Dimensi Balok 450 : 550 mm : Pb = 40 mm
: d = 495 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 1983.3 mm2
b. Bottom Area = 1130.25 mm3
c. Maximum Shear Rebar = 0.437 mm2/mm
d. Torsi (Axis) (At/a) = 0.434 mm2/mm
e. Torsi Memanjang = 1094.73 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)
b. Tulangan Bawah = 2 D 29 Area = 1321.04 mm2
0 D 0 Area = 0 mm2
Total = 1321.04 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 11.2328 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 881.395
Tidak boleh kurang dari As min = 1113.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.01186 (Tulangan) Check = (OK) to (OK)
0.00593 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 98.4761 ; a/d = 0.19894 ; (OK)
- Tulangan Lapangan = 49.2381 ; a/d = 0.09947 ; (OK)

LETAK LAPANGAN
1. Dimensi Balok 450 : 550 mm : Pb = 40 mm
: d = 495 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 623.894 mm2
b. Bottom Area = 852.039 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 25 Area = 1472.62 mm2
0 D 0 Area = 0 mm2
Total = 1472.62 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 12 Area = 339.292 mm2


3 D 22 Area = 1140.4 mm2
Total = 1479.69 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 881.395
Tidak boleh kurang dari As min = 1113.75
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00661 (Tulangan) Check = (OK) to (OK)
0.00664 (Tumpuan) Check = (OK) to (OK)
c. Cek kendali Tarik Penampang
a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 54.8879 ; a/d = 0.11088 ; (OK)
- Tulangan Lapangan = 55.1513 ; a/d = 0.11142 ; (OK)
5 SKETSA PENULANGAN

450 Tulangan Atas = 4 D 29


0 D 0
Tulangan Bawah = 2 D 29
0 D 0
Tulangan Torsi = 5 D 29
550 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

450
Tulangan Atas = 3 D 25
0 D 0
Tulangan Bawah = 3 D 12
3 D 22
Tulangan Torsi = 6 D 25
550 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 23400 mm^2 z = 29.8927 MN/m
n = 2 syarat z < 30 Mn/m (OK)
ds = 52 mm
3.27 Penulangan Balok (RB.LT4E)
Letak Tumpuan
1. Dimensi Balok 500 : 600 mm : Pb = 40 mm
: d = 540 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 2296.22 mm2
b. Bottom Area = 1378.95 mm3
c. Maximum Shear Rebar = 0.339 mm2/mm
d. Torsi (Axis) (At/a) = 0.272 mm2/mm
e. Torsi Memanjang = 1404.64 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 4 D 29 Area = 2642.08 mm2
0 D 0 Area = 0 mm2
Total = 2642.08 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 25 Area = 1472.62 mm2


0 D 0 Area = 0 mm2
Total = 1472.62 mm2
Chechk for as use (OK)

c. Beugel Maksimum = P 25 - 100 ; AV Area = 490.874


(Gunakan di area tumpuan) Av/s Area = 4.90874
Chechk for as use = 14.4801 ; 1
= (OK)

d. Tulangan Torsi = 5 D 29 Area = 3302.6


0 D 0 Area = 0
Total = 3302.6
Chechk for as use (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1068.36
Tidak boleh kurang dari As min = 1350
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00979 (Tulangan) Check = (OK) to (OK)
0.00545 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 88.6285 ; a/d = 0.16413 ; (OK)
- Tulangan Lapangan = 49.3991 ; a/d = 0.09148 ; (OK)
LETAK LAPANGAN
1. Dimensi Balok 500 : 600 mm : Pb = 40 mm
: d = 540 mm

2. Reinofrcement Area Output SAP2000, Use Maxsimum Value:


a. Top Area = 724.603 mm2
b. Bottom Area = 826.155 mm3
c. Maximum Shear Rebar = 0.001 mm2/mm
d. Torsi (Axis) (At/a) = 0 mm2/mm
e. Torsi Memanjang = 0 mm2

3. Estimasi Kebutuhan Tulangan


a. Tulangan Atas = 3 D 25 Area = 1472.62 mm2
0 D 0 Area = 0 mm2
Total = 1472.62 mm2
Chechk for as use = (OK)

b. Tulangan Bawah = 3 D 12 Area = 339.292 mm2


3 D 22 Area = 1140.4 mm2
Total = 1479.69 mm2
Chechk for as use = (OK)

c. Beugel Maksimum = P 6 - 100 ; AV Area = 28.2743


(Gunakan di area tumpuan) Av/s Area = 0.28274
Chechk for as use = 282.743 ; 1
= (OK)

d. Tulangan Torsi = 6 D 25 Area = 2945.24


0 D 0 Area = 0
Total = 2945.24
Chechk for as use = (OK)

4. Kontrol, fu = 19.64 Mpa fy = 280 Mpa ; For BJTS


fy = 280 Mpa ; For BJTP
fx = 280 Mpa

a. Cek Terhadap Luas As Minimum ;


As min = 1068.36
Tidak boleh kurang dari As min = 1350
Kontrol Tulangan Tumpuan, Asmin < Asaksial = (OK)
Kontrol Tulangan Lapangan, Asmin < As aksial = (OK)

b. Cek Rasio Tulangan ;


p min = 0.005 ; pmin < paksial
p max = 0.02591 ; pmax < aksial
p aksial = 0.00545 (Tulangan) Check = (OK) to (OK)
0.00548 (Tumpuan) Check = (OK) to (OK)

c. Cek kendali Tarik Penampang


a/d < 0.375 β1
0.375 β1 = 0.31875
- Tulangan Tumpuan = 49.3991 ; a/d = 0.09148 ; (OK)
- Tulangan Lapangan = 49.6362 ; a/d = 0.09192 ; (OK)

5 SKETSA PENULANGAN

500 Tulangan Atas = 4 D 29


0 D 0
Tulangan Bawah = 3 D 25
0 D 0
Tulangan Torsi = 5 D 29
600 0 D 0
Tulangan Beugle = P 25 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

500
Tulangan Atas = 3 D 25
0 D 0
Tulangan Bawah = 3 D 12
3 D 22
Tulangan Torsi = 6 D 25
600 0 D 0
Tulangan Beugle = P 6 - 100

Mutu Beton = K - 250


Mutu Baja = BJTS - 280
= BJTP - 280

LETAK LAPANGAN (BAGIAN TENGAH BALOK)

6 Kontrol Retak
A = 17333.3 mm^2 z = 27.047 MN/m
n = 3 syarat z < 30 Mn/m (OK)
ds = 52 mm