nozzle.
Design assumptions:
1 160 7 205
2 203 8 341
3 218 9 260
4 293 10 293
5 255 11 218
6 210 12 180
𝑋$ 630
𝑥= = = 0,7
𝑑 900 # #
𝑉!" = 18 $ 𝑉%&" = 2 $
𝑌$ 360
𝑦= = = 0,4
𝑑 900
𝑣 𝑥 = 𝑣̂ 𝑥 ∙ 𝑣 ̅ 𝑣 𝑥 = 0,14 ∙ 𝑣 ̅
900 mm
ti = 24°C = 297 K
pi=1012 hPa
𝜌 = 1,1822
𝐽
𝑅%&( = 288,213
𝐾𝑔. 𝐾
𝐽
𝑅%( = 461,5
𝐾𝑔. 𝐾
𝐽
𝑅%&( $*+, = 287,0
𝐾𝑔. 𝐾
2 ∙ 160 𝑚
𝑛𝑝 = 𝑣' = > = 16,45
1,1822 𝑠
Average air velocity in the A-A section conduct
1
𝑉% = (16,45 + 18,5 + 19,20 + 22,26 + 20,77 + 18,85 + 18,62 + 24,02 + 20,97
12
𝑚
+ 22,26 + 19,2 + 17,45) = 19,88
𝑠
0,72 -
𝐹% = 𝜋 I J = 0,407 𝑚-
2
𝑉 8,09 𝑚
𝑉= = = 17,97
𝐹. 0,45 𝑠
Relative and absolut suction velocity for the most infavorable point K
1
𝑦 = 0 ∙ 6 = 2 conventional length units
Conclusions
The average speed in the line is lower than the transport speed