PRELIM INSPECTION
SL NO DWG NO DESCRIPTION OF PIPING SYSTEM PIPING SPECS REQUIRED MATERIALS REPLACEMNT/ REPAIR STATUS
/RECCOMENDATIONS/COUNTERMEASURES
500A, A672Gr-B60 CL13 + Cut and Replace by new pipe approx 4 Mtr L. due
1 85105-0001-1 NO 5 EXT STEAM PIPING 4 Mtr length, A106 Gr B STD SCH Welding completed
A106 Gr B STD SCH to hole at FW storage tank elevation
Pipe - 20 mtr, E90L-1, E90S-1, MCE89.4L-
Severe damage, Collapsed from designed Cutting & Removal completed,
2 89102-0001 AUX STEAM HEADER PIPING 250A, SCH40, A106 Gr-B 2, MCE89.2S-1, MCE89.2L-1 (BW,
location & Cut and Replacement by new Welding completed
A234WPB)
Pipe damged, Cutting, Foreign Material Pipe replacement by new appx 1.3 mtr
3 84301-0002-1 M-BFP-3B MIN FLOW PIPING 150A,STD SCH40,A106 Gr-B Welding completed
inspection, Welding of new pipe & NDT length
4 86204-0001-1 DEAERATOR OVER FLOW PIPING 200A, SCH40, A106 Gr-B Elbow part damaged & Replace new elbow E45L-1 (BW, A234WPB) Welding completed
5 GMB02-1008-1 FLOOR DRAIN PIPING 125A, SCH40, A106 Gr-B Severe damge & New pipe replacement Pipe - 9.5 mtr, E45L-3, (BW, A234WPB) Welding completed
TURBINE GLAND STEAM PSV EXHAUST Pipe - 8 mtr, MCE60L-1, E90L-1, MCE33.8L-
6 89404-0001 250A, SCH40, A106 Gr-B Cut & Replace by new Welding completed
PIPING 1 (BW, A234WPB)
7 38801-0006 COOLING AIR PIPING (TO BOILER RIGHT) 300A, STD SCH, A106 Gr-B Dents in the pipe, Replace by new spool Pipe - 500 mm Welding completed
Dents and concaveness in the pipe, Replace by Pipe replacement by new appx 1.6 mtr
8 GMB01-1006 FLOOR DRAIN PIPING 100A, SCH40, A106 Gr-B Welding completed
new spool length
9 38801-0105 SEALING AIR PIPING (TO RHS SB) 150A,STD SCH40,A106 Gr-B Dents in the pipe, Replace by new spool Pipe - 3.2mtr, E90L-1 (BW, A234WPB) Welding completed