One-Line Diagram - OLV1 (Short-Circuit Analysis)

PLTU Unit II PLTU Unit III PLTG Unit I


PLTU Unit I
2 MW 2 MW 3 MW 4 MW

GI KIT IA GI KIT IB GI KIT IIA


13,8 kV 13,8 kV 13,8 kV

Trafo Tng I 13,8/500 kV Trafo Tng II 13,8/500 kV Trafo Tng III 13,8/500 kV
3,875 MVA 7,5 MVA
11,25 MVA

GI KIT I GI KIT II
Jaringan Transmisi TET
500 kV 5 MVAsc 500 kV

GITET
500 kV

PLTA Unit I
3 MW
Trafo Interbus 500/150 kV
6,25 MVA

GI KIT IIIA
13,8 kV
GITET II
150 kV

Trafo Tng I 13,8/150 kV


5 MVA

GI KIT III
150 kV

GI I
GI II
150 kV GI IV
150 kV 150 kV

GI III
150 kV
Trafo Tng II 150/20 kV Trafo TNG V 150/20 kV
Trafo Tng I 150/20 kV
1,25 MVA 2,5 MVA 7,5 MVA

Trafo Tng III 150/20 kV


Trafo Tng IV 150/20 kV
± 0,438 MVA
I> 1,875 MVA
GI IIA
GI IA
20 kV
20 kV
GI IIIB
GI IVA GI IIIA
20 kV
20 kV 20 kV
SKUTM II SKUTM III SKUTM IV
SKUTM 1
±

I> SKUTM VII


SKUTM V SKUTM VI
GD II
GD I
20 kV 20 kV GD III SKUTM 1%
PLTS1
20 kV PLTS II Bus Saluran 1%
Bus Beban II
Bus Beban VIII GD V
20 kV 20 kV Bus Beban VII 20 kV 20 kV
Trafo Dist. I 20/0,4 kV SKUTM 25% 20 kV
0,625 MVA Trafo Dist. III 20/0,4 kV
Syn1 0,125 MVA GD 1%
250 HP Network3 1,875 MVA
Bus Saluran 25% Trafo Dist. IV 20/0,4 kV
Bus1 Bus7
Cmtr1 0,4 kV 20 kV Mtr1 0,5 MVA
GD IA 0,4 kV CAP2 Lump7
Lump5 Lump6 180 kVA
0,4 kV 52,67 kvar250 HP
GD IIIA 200 kVA 170 kVA
0,4 kV SKUTM 50%
Lump9 GD 1%2
Cable1 Cable2 200 kVA GD VA
1,875 MVA
SUTR I SUTR III SUTR IV 0,4 kV
Bus Saluran 50%
SUTR II 20 kV

SUTR V
Bus Beban III Bus Beban IV Bus Beban V
0,4 kV 0,4 kV 0,4 kV Lump10
Bus Beban I SKUTM 75%
0,4 kV 200 kVA
GD 1%3
1,875 MVA Bus Beban IX
0,4 kV
Bus Saluran 75%
Load4 20 kV
Load5
Load6
6 kVA 6 kVA
Lump1 Load1 6 kVA SKUTM 100%
230 kVA 60 kVA Lump12
200 kVA GD 1%5
1,875 MVA Lump8 Load7
CAP1
350 kVA 100 kVA
Bus Saluran 100% 200 kvar
20 kV

Lump14
200 kVA GD 100%
1,875 MVA

Lump16
200 kVA

page 1 17:10:22 Oct 13, 2021 Project File: 201811108