Professional Documents
Culture Documents
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
Previous Page 19 of 19 Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
87. How many uplinks per rack are now needed for multi-racking the Exadata X9M?
14
56
7
28
(1) Points
88. When adding a ZFS Appliance to the RDMA Network Fabric of a multi-racked
Exadata X9M, 2 hosts will have to be removed from the rack.
False
True
(1) Points
89. There are now 3 RoCE X9M Golden Config multi-rack templates.
False
True
(1) Points
90. What is the primary change to the X9M Golden Config for the RoCE leaf
switches?
All network ports on the leaf switches are configured as Edge ports
The Golden Config is on the leaf switch from the factory
One Golden Config for all deployment types.
Port 1-3 and 34-36 are now configured as router ports and connected to the spines.
(1) Points
Previous Page 18 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
82. If you expand an Exadata X8M quarter rack with Exadata X9M servers to make it
a full rack, then you must implement the 7 uplinks from leaf to spine to avoid over-
subscription.
True
False
Mark for Review
(1) Points
83. When multi-racking a new Exadata X9M rack to an existing Exadata X8M rack,
additional uplinks will need to be added to the X8M rack.
False
True
(1) Points
84. What is the maximum number of racks that can be multi-racked with Exadata
X9M?
18
16
8
12
(1) Points
85. What are the new tags used for multi-rack configurations?
mleafsw1, mleafsf, mleafsp
Leaf1, leaf2, leaf3
mleaf, msleaf, and mleaf23
mrleaf, mrsfleaf, mrleaf28
(1) Points
Previous Page 17 of 19 Next Summary
Test: Oracle ZDLRA Hardware Installation & Software
Configuration Online Assessment (2022)
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
Walk through the install plan and expectations with the customer
Execute preinstall_check.pl
Go through config.sh with the customer
Execute ra_preinstall.pl
(1) Points
ZDLRA RA21 Assessment
(Answer all questions in this section)
77. RA21 has better performance and more capacity than the ZDLRA X9M.
False
True
(1) Points
78. RA21 reserves which PCIe Slot for the optional Qlogic Fiber Channel Card?
PCIe 2
PCIe 1
PCIe 3
PCIe 4
Mark for Review
(1) Points
79. How many Storage Servers are allowed in the RA21 Full Rack?
18
12
22
9
(1) Points
80. What rack configurations are valid for the RA21? Choose all that apply.
(Choose all correct answers)
RA21 will not intermix X8 and X9 Database servers from the factory.
RA21 will not intermix X8 and X9 Storage servers from the factory.
RA21 will intermix a variety of X8 and X9 Database servers from the factory.
RA21 will allow intermixing of Storage servers post install per upgrade/expansion
process.
RA21 will intermix a variety of X8 and X9 Storage servers from the factory.
(1) Points
Previous Page 16 of 19 Next Summary
(1) Points
72. Which installation software script performs additional configuration steps on
the recovery appliance?
ra_preinstall.pl
oeda_check.sh
ra_install.pl
install.sh
(1) Points
73. Which installation software script enables the ZDLRA services on the recovery
appliance?
ra_install.pl
ra_preinstall.pl
install.sh
oeda_check.sh
(1) Points
75. Which installation software script performs initial checks on the recovery
appliance?
ra_install.pl
ra_preinstall.pl
oeda_check.sh
install.sh
(1) Points
Previous Page 15 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
ZDLRA Software Configuration
(Answer all questions in this section)
66. What step in ra_install.pl gets the system prepped to become a ZDLRA?
Tape Backup configuration
OS Setup
Validation and Configuration Prep
DBFS Setup
(1) Points
67. Which installation software script configures the networks on the recovery
appliance?
install.sh
ra_install.pl
ra_preinstall.pl
oeda_check.sh
(1) Points
68. What targets can be managed by the Recovery Appliance?
(Choose all correct answers)
Cluster
Backup Pool
Database
Automatic Storage Management
(1) Points
69. Which installation software script creates the cell and grid disks on the recovery
appliance?
install.sh
oeda_check.sh
ra_preinstall.pl
ra_install.pl
(1) Points
70. Where can you find information on configuring and administering the ZDLRA?
ZDLRA Administrator's Guide
ZDLRA Owner's Guide
ZDLRA Configuration and Administration Guide
MOS Note 238134.1
(1) Points
Previous Page 14 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
ZDLRA Software Configuration
(Answer all questions in this section)
62. Select some of the prerequisites for installing the software on the Recovery
Appliance.
(Choose all correct answers)
(1) Points
63. Select 2 files created from the inputs of the OEDA.
(Choose all correct answers)
customer_name-rack_name.xml
customer_name-rack_name.zip
(1) Points
64. What systems can be configured with OEDA?
(Choose all correct answers)
Recovery Appliance
Exadata
Oracle Cloud Machine
Exalogic
SuperCluster
(1) Points
65. What does reclaiming disk space do on the Recovery Appliance?
Defragments the storage nodes to ensure optimal storage usage
Connect to the network and update the firmware
Defragments the compute nodes to ensure optimal storage usage
Converts the Linux system to four disks in a RAID-5 configuration
Deletes all the install files
(1) Points
Previous Page 13 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
57. On an Exadata X9M multi-rack, the RoCE leaf interlinks have increased from
four to seven when compared to the X8M.
True
False
(1) Points
58. The Exadata or ZDLRA X9M platforms allow RoCE Fabric Switches to be replaced
from the front of the rack.
True
False
(1) Points
59. Which of the following are true for the Exadata X9M Storage Servers? Select all
that apply.
(Choose all correct answers)
(1) Points
60. Which two of the following are true, in respect to how Linux Ethernet device
enumeration occurs between the three Exadata X9M PCIe slots? Select two
answers.
(Choose all correct answers)
The devices are always enumerated with eth1 – eth4, for PCIe slot 1 network ports,
eth5 – eth8, for PCIe slot2 ports, and eth9 – eth12 for PCIe slot3 ports.
The devices for PCIe slots 1 through 3 will be in a mixed enumeration, depending
on what dual-port SFP28 25Gb and quad-port RJ45 10Gb cards are selected, and
how they are mixed-and-matched between the slots.
The quad-port RJ45 10Gb ports are enumerated from top-to-bottom, right-to-left
when installed in an X9M-2.
The dual-port SFP28 25Gb ports are enumerated from top-to-bottom when
installed in an X9M-8, and right-to-left when installed in an X9M-2.
(1) Points
Previous Page 12 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
52. The usable space for ZDLRA X9M Full Rack High Redundancy is _____?
794TB
395TB
628TB
1260TB
(1) Points
53. What size disk drive is used in the ZDLRA X9M Storage server?
8TB
14TB
18TB
10TB
(1) Points
Exadata X9M TOI - Hardware Overview Assessment
(Answer all questions in this section)
54. Like the Exadata X8M, the Exadata X9M platform database servers contain two
onboard SFP28 and RJ45 ports, giving customers the choice between either pair.
True
False
(1) Points
Previous Page 11 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
48. What are the maximum number of database nodes in a ZDLRA rack?
6
4
There is no max
2
(1) Points
Exadata X9M TOI – ZDLRA X9M Updates Assessment
(Answer all questions in this section)
49. Which General Expansion Rules still apply to ZDLRA X9M?
Min of 3 storage servers to leverage full usable capacity
If adding < 3, they are added to existing disk group (+Delta)
Disk size of new servers must align with (+Delta)
All of the above
(1) Points
50. Which document lists the details of the supported software versions of ZDLRA?
ZDLRA Release and Patching Policy (Doc ID 2410137.1)
Release Schedule of Current Database Releases (Doc ID 742060.1)
Zero Data Loss Recovery Appliance Supported Versions (Doc ID 1927416.1)
All of the above
(1) Points
Previous Page 10 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
IP Address
RMAN Configuration
Name
Enterprise Manager Agents
(1) Points
42. What items do you verify when performing initial activities on the storage cells?
(Choose all correct answers)
(1) Points
43. What is the default password for most users on the ZDLRA?
manager
oracle
welcome1
zdlra1
(1) Points
44. How many database nodes are included in the base rack configuration?
3
4
6
2
1
(1) Points
45. When working with the PDU, how can you verify that you are running the
current version?
Connect to each PDU's webpage
cellcli -version all
dbmcli pdu -version
verify-pdu -version
(1) Points
Previous Page 9 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
37. What activities are done during network updates?
(Choose all correct answers)
(1) Points
38. What does PDU stand for?
Power Delivery Unit
Plain Deconstruction Unit
Performance Distribution Unit
Performance Delivery Unit
(1) Points
39. How do you prevent duplicate IP conflicts?
Assign every 3rd IP address in sequence to the ZDLRA
Connect to the customer network after IPs have been re-configured
Use IPv6 instead of IPv4
Use the IP addresses suggested by Oracle
(1) Points
40. How many storage nodes are included in the base rack configuration?
4
3
6
2
1
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
32. For safety awareness with respect to grounding, if a system has been modified
after the manufacturer's assembly process, what three recommendations does the
EIS Grounding Standard make?
(Choose all correct answers)
If qualified personnel did not test the safety of the modified system then proper
testing should be requested before Oracle and/or partner personnel will work on
the equipment
Determine whether the local electrician can support the installation process
If the temperature is below 60 degrees F., warm the room first before power ON
Check whether the modification involved any power supplies, distribution units or
wiring?
If modifications involved any power supplies, distribution units or wiring, did
qualified personnel verify that the modification was was correct and did they test
the system to ensure that it doesn't pose any safety hazard?
(1) Points
ZDLRA Hardware Installation
(Answer all questions in this section)
33. What steps should be performed when unpacking the ZDLRA for the first time?
(Choose all correct answers)
Open up an Installation SR
Assemble the spare parts
Verify all parts have arrived
Collect the Customer Information Sheets
(1) Points
34. What command do you use to check the infiniband topology?
verify-toplogy
cellcli
dbmcli
check-ib
(1) Points
35. What is the major difference between the Fiber cards on Exadata and fiber
cards on ZDLRA?
Fiber cards cannot be connected to Exadata or ZDLRA
Fiber cards are installed on ZDLRA Storage Nodes
Fiber cards can be connected to ZDLRA only
Fiber cards can be connected to Exadata only
Fiber cards are used to connect the ZDLRA to the protected databases
(1) Points
Previous Page 7 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
27. What are the four key points covered in each test topic of the Test Procedures
Plan?
(Choose all correct answers)
Prerequisites
Method
Outcome
Conclusion
Objective
Test Result
(1) Points
28. What four tasks are typically happening at the EIS Planning and Preparation
stage in the installation process?
(Choose all correct answers)
(1) Points
29. What is the purpose for the Operational Handover step in the EIS Methodology?
Used to negate responsibility for any ongoing System issues
Documents the installation and configuration of Customer's system(s)
Perform system testing and diagnostics
Documents how to use the EIS documentation and standards
(1) Points
Previous Page 6 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
22. Which four documents are included as part of the Operational Handover?
(Choose all correct answers)
(1) Points
23. You are assigned to an installation project in France in February to install 5 new
SPARC T5 servers. The servers, in their original packaging, are sitting in the
customer’s loading dock with a temperature of 8 degrees C (46 degrees F). The
customer’s data center is 20 degrees C (68 degrees F). What is the recommended
next step in acclimating these systems?
Unpack the servers and store in the loading dock
Move the systems (still packed) into a room with a similar environment to the data
center
Move the systems (still packed) into the data center
Unpack the servers and store in the data center
(1) Points
24. Why is the rate of temperature change when acclimatizing systems such an
important factor as described in the EIS methodology?
It is actually not relevant or important
Systems should be warmed up and powered ON as quickly as possible to optimize
the installation project timeline
Variations in temperature should not exceed the approved gradient of
approximately 2° C (4° F) per hour, because ignoring this may could lead to long-
term damage (hair-cracks) on the boards
Variations in temperature do not have as big an impact as do Service contract
considerations for how long an installation will take
(1) Points
25. If the customer has asked for some customization of their installation, how is
testing for that accomplished? Choose all responses that apply.
(Choose all correct answers)
Testing above and beyond the Covered System Tests are at the sole discretion of
Oracle and/or the Partner installer
Oracle is automatically responsible for any non-standard installation procedure,
regardless of whether they were agree to as part of the Installation and
Configuration Plan
Not all installation actions need testing
Additional tests can be inserted into the Test Procedures plan
(1) Points
Previous Page 5 of 19 Next Summary
(1) Points
17. Why it is important to do Installation planning, rather than just asking the
customer as you work through the installation process? (Select three)
(Choose all correct answers)
(1) Points
18. According to the EIS methodology, when issues are uncovered during the Site-
Audit, who should be notified?
(Choose all correct answers)
Customer point of contact
Oracle Premier Support
Installation coordinator if applicable
Oracle sales management
(1) Points
19. When should you review deliverables and why?
EIS deliverables are used as a last step in the installation process to ensure the
installer provided everything that is required
EIS deliverables are included in the Oracle system shipping and packaging
documents near the start of an installation
Ideally EIS deliverables would be reviewed at the very start of an installation project,
as they clearly define scope, roles and responsibilities, and project deliverables
EIS deliverables are an interim checklist to ensure that at the mid-way point of an
installation the project remains on track.
(1) Points
20. What two activities are accomplished during Installation Task Planning step in
the EIS Methodology?
(Choose all correct answers)
(1) Points
Previous Page 4 of 19 Next Summary
Test: Oracle ZDLRA Hardware Installation & Software
Configuration Online Assessment (2022)
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
12. Which two EIS documents are most useful during the Installation and
Configuration of Oracle Hardware and Software step?
(Choose all correct answers)
EIS Checklist
DVD
Operational Handover Agreement
Site-Audit Report
Installation Configuration Plan
(1) Points
13. Why should you typically complete the Installation Configuration Plan and
create your Test Procedures Plan at the same time?
You should create the Test Procedures Plan after you have completed the system
installation and configuration.
As you work through the system configuration process with your customer, you
should state how you will test key items in the system’s configuration for having
been successfully completed.
Test Procedures plan is a standard document used in all generic system
installations.
(1) Points
14. When should the Site-Audit be performed?
As soon as the product has been delivered to the customer
As soon as possible, and certainly prior to delivery of the system
After the system has been acclimatized and is ready for unpacking at the customer
site
Prior to the completion of the sale, in order to ensure that the customer’s location
is viable
(1) Points
15. Why do the EIS Standards recommend that external cables between Oracle
hardware, such as servers, storage devices, network devices and ports be clearly
labeled?
Service requests for field diagnostics will not be accepted unless cables are labeled
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
7. Which four objectives are primary goals for an EIS Site Audit?
(Choose all correct answers)
Determine the floor weight load capacity at the location where the System will be
installed
Determine how frequently system backups will be completed
Determine installation needs for the System, including such assessments as: the
suitability of access routes to the installation location, such as doors, elevators,
floor strengths and ramps
Determine how many logical domains need to be configured on the system
Determine the environmental conditions at Customer's site including temperature,
humidity, cleanliness and such other assessments as are determined to be
necessary in Oracle's sole discretion
Determine the availability of required electrical power to run and maintain the
System
(1) Points
8. Why should you use the EIS methodology to guide your installation process?
Larry Ellison has mandated using EIS
The EIS methodology provides a 20% discount on Support Services if you install
your customers’ hardware or software using it
Installation processes are very lengthy, the EIS methodology is quick and dirty
Using the proven EIS methodology will provide step-by-step installation guidelines,
help guarantee a quality installation, make your life easier, and ensure customer
satisfaction
(1) Points
9. What should you do with the EIS checklist when an installation project is
complete?
Leave the EIS checklist with the customer so that they can re-install when they need
to
Crumple the checklist and throw it in the customer wastepaper bin
Post the EIS checklist and Test Procedures Plan to My Oracle Support under your
customer’s account
Remove the EIS checklist and other confidential Oracle Intellectual Property from
the customer datacenter
(1) Points
10. What are two activities that take place during the System Test step of the EIS
methodology?
(Choose all correct answers)
(1) Points
Previous Page 2 of 19 Next Summary
Answer the question(s) on this page, and click Next to go to the next test page. Click
Summary to see which questions you need to answer before submitting the test.
Click Finish Test if you are ready to submit your test.
(1) Points
2. What are two cautions that should be acknowledged when acclimatizing a
system?
(Choose all correct answers)
Powering ON the system will speed the acclimatization process as the heat from
the system will accelerate its warming
Once powered on the temperature is no longer an issue, as internal cooling
systems commence
The maximum positive or negative temperature gradient that is permitted for
multi-layer boards is approximately 2° C (4° F) per hour.
Avoid unpacking items inside the computer centre (dust/dirt contaminating filters
etc.)
(1) Points
3. What should you do if you believe you have found an error in an EIS checklist?
Email Larry Ellison and recommend changes
Assume that the EIS team is already aware and the next version of the checklist will
be updated
Submit your concerns to My Oracle Support
Follow the feedback method on the last page of every checklist: email SUPPORT-
PARTNER-QUESTIONS_WW_GRP@oracle.com
(1) Points
4. What are three items in the EIS Site-Audit Report are documented for all Oracle
hardware?
(Choose all correct answers)
(1) Points
5. What if the customer has their own labeling methodology that differs from the
recommended one from EIS?
Redo cabling throughout the datacenter to meet the EIS standard
Follow the customer's standard for cable labeling provided it meets with EIS
requirements for identification and port location.
Submit a Service Request for Oracle approval on use of the customer labeling and
routing methods
Ignore the customer’s standard and use the EIS standard
(1) Points
Page 1 of 19 Next Summary